N0001920C0011
Definitive Contract
Overview
Government Description
LOT 15 FMS-1 F135 CTOL PROP SYSTEM
Alternate Description
Aircraft Engine Parts
Awardee
Awarding Agency
Funding Agency
Place of Performance
East Hartford, CT 6118 United States
Pricing
Fixed Price Incentive
Set Aside
None
Extent Competed
Not Competed
Related Opportunity
N0001920R0019
Analysis Notes
Amendment Since initial award the Potential End Date has been extended from 08/31/23 to 12/31/23 and the Potential Award value has increased 54303% from $13,784,154 to $7,498,943,172.
FMS This contract was partially or fully funded by foreign funds as part of the Foreign Military Sales (FMS) assistance program.
Sole Source This Definitive Contract was awarded sole source to RTX Corporation because the government believes that only one company can provide the product / service (FAR 6.302-1).
FMS This contract was partially or fully funded by foreign funds as part of the Foreign Military Sales (FMS) assistance program.
Sole Source This Definitive Contract was awarded sole source to RTX Corporation because the government believes that only one company can provide the product / service (FAR 6.302-1).
RTX Corporation was awarded
Definitive Contract N0001920C0011 (N00019-20-C-0011)
for Lot 15 Fms-1 F135 Ctol Prop System
worth up to $7,498,943,172
by Naval Air Systems Command
in March 2020.
The contract
has a duration of 3 years 9 months and
was awarded
full & open
with
NAICS 336412 and
PSC 2840
via sole source acquisition procedures with 1 bid received.
DOD Announcements
Mar 2020:
Pratt and Whitney, a United Technologies Corp. company, Hartford, Connecticut, is awarded a $193,780,323 cost-plus-incentive-fee, fixed-price-incentive-firm contract for the procurement of long lead materials for the production of low rate initial production of propulsion systems (Lot 15 F135) for the Air Force, Navy, Marine Corps, non-Department of Defense (DoD) participants and Foreign Military Sales (FMS) customers. Work will be performed in East Hartford, Connecticut (56%); North Berwick, Maine (13%); Indianapolis, Indiana (10%); Jupiter, Florida (7%); Windsor Locks, Connecticut (5%); Bristol, United Kingdom (4%); Rockford, Illinois (2%); Santa Isabel, Puerto Rico (2%); and Phoenix, Arizona (1%), and is expected to be complete by December 2023. Fiscal 2020 aircraft procurement (Air Force) funds in the amount of $66,446,810; fiscal 2020 aircraft procurement (Navy) funds in the amount of $61,396,328; non-DoD participants funds in the amount of $52,153,031; and FMS funds in the amount of $13,784,154 will be obligated at time of award, none of which will expire at the end of the current fiscal year. This contract combines purchases for the Air Force ($66,446,810; 34.3%); Navy ($30,788,105; 15.9%); Marine Corps ($30,608,223; 15.8%); non-DoD participants ($52,153,031; 26.9%); and FMS customers ($13,784,154; 7.1%). This contract was not competitively procured pursuant to U.S. Code 2304(c)(1). The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity (N00019-20-C-0011).
Dec 2021: Raytheon Technologies Corp., Pratt and Whitney Military Engines, East Hartford, Connecticut, is awarded a $218,162,159 cost-plus-incentive-fee, fixed-price incentive (firm target) modification (P00002) to a previously awarded contract (N0001920C0011). This modification adds scope to procure long-lead items in support of Lot 16 propulsion systems for F-35 Lighting II Joint Strike Fighter aircraft for the Air Force, Marine Corps, Navy, Foreign Military Sales (FMS) customers, and Non-U.S. Department of Defense (DOD) participants. Work will be performed in Indianapolis, Indiana (44%); Windsor Locks, Connecticut (33%); Bristol, United Kingdom (16%); and Phoenix, Arizona (7%), and is expected to be completed in December 2024. Fiscal 2021 aircraft procurement (Navy) funds in the amount of $66,812,836; fiscal 2021 aircraft procurement (Air Force) funds in the amount of $56,564,199; FMS funds in the amount of $43,871,979; and Non-U.S. DOD participant funds in the amount of $50,913,145 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Jun 2022: Raytheon Technologies Corp., Pratt and Whitney Military Engines, East Hartford, Connecticut, is awarded a not-to-exceed $4,385,492,639 undefinitized modification (P00005) to a previously awarded cost-plus-incentive-fee, fixed-price incentive (firm-target) contract (N0001920C0011). This modification adds scope for the production and delivery of Lot 15 and 16 F-35 Lighting II Joint Strike Fighter propulsion systems to include 152 F135-PW-100 propulsion systems (108 for the Air Force, 29 for the Navy, and 15 for the Marine Corps); and 26 F135-PW-600 propulsion systems for the Marine Corps, as well as long lead-time components, parts, and materials associated with F135-PW-100 and F135-PW-600 propulsion systems for non-U.S. Department of Defense (DOD) participants and Foreign Military Sales (FMS) customers. Additionally, this modification provides global spares requirements to include spare engines, power modules, and other hardware. This modification also provides a Block 4 Short Take-Off Vertical Landing developmental test engine for flight test efforts. Work will be performed in East Hartford, Connecticut (17%); Indianapolis, Indiana (10%); Middletown, Connecticut (8%); Kent, Washington (7%); North Berwick, Maine (4%); El Cajon, California (3%); Cromwell, Connecticut (3%); Whitehall, Michigan (3%); Portland, Oregon (2%); San Diego, California (2%); South Bend, Indiana (2%); Columbus, Georgia (1%); Hampton, Virginia (1%); Manchester, Connecticut (1%); Cheshire, Connecticut (1%); Elmwood Park, New Jersey (1%); various locations within the continental U.S. (27%); and various locations outside the continental U.S. (7%), and is expected to be completed in September 2024. Fiscal 2022 aircraft procurement (Navy) funds in the amount of $533,202,564; fiscal 2022 aircraft procurement (Air Force) funds in the amount of $486,934,274; fiscal 2021 aircraft procurement (Air Force) funds in the amount of $499,194,377; fiscal 2021 aircraft procurement (Navy) funds in the amount of $379,564,738; fiscal 2022 research, development, test and evaluation (Air Force) funds in the amount of $5,355,067; fiscal 2022 research, development, test and evaluation (Navy) funds in the amount of $5,355,066; non-U.S. DOD participants funds in the amount of $636,195,308; and FMS customer funds in the amount of $355,166,432 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Sep 2022: Raytheon Technologies Corp., Pratt and Whitney Military Engines, East Hartford, Connecticut, is awarded a not-to-exceed $277,919,144 modification (P00007) to a previously awarded cost-plus-incentive-fee, fixed-price-incentive-firm-target undefinitized contract (N0001920C0011). This modification adds scope for the production and delivery of F-35 spares, to include four Short Takeoff and Vertical Landing spare engines for the U.S. Marine Corps and 20 power modules for the U.S. Air Force. Work will be performed in East Hartford, Connecticut (17%); Indianapolis, Indiana (10%); Middletown, Connecticut (8%); Kent, Washington (7%); North Berwick, Maine (4%); El Cajon, California (3%); Cromwell, Connecticut (3%); Whitehall, Michigan (3%); Portland, Oregon (2%); San Diego, California (2%); South Bend, Indiana (2%); Columbus, Georgia (1%); Hampton, Virginia (1%); Manchester, Connecticut (1%); Cheshire, Connecticut (1%); Elmwood Park, New Jersey (1%); various locations within the Continental United States (27%), and various locations outside the Continental United States (7%), and is expected to be completed in October 2025. Fiscal 2022 aircraft procurement (Air Force) funds in the amount of $171,681,855 and fiscal 2022 aircraft procurement (Navy) funds in the amount of $106,237,289 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Dec 2022: Raytheon Technologies Corp., doing business as Pratt and Whitney Military Engines, East Hartford, Connecticut, is awarded a $619,068,244 firm-fixed-price, fixed-price incentive (firm target), cost reimbursable modification (P00008) to a previously awarded contract (N0001920C0011). This modification adds scope to procure long-lead materials, parts and components for Lot 17 F135 propulsion systems in support of the F-35 Lighting II Joint Strike Fighter aircraft for the Air Force, Marine Corps, Navy, non-U.S. Department of Defense (DOD) partners, and Foreign Military Sales (FMS) customers. Additionally, this modification adds scope for the production and delivery of four F135-PW-600 propulsion systems in support of Lots 15 and 16 F-35 Lighting II Joint Strike Fighter for non-U.S. DOD partners and FMS customers, as well as provides for integration efforts for an FMS customer into the Joint Strike Fighter program. Work will be performed in Windsor Locks, Connecticut (23%); Indianapolis, Indiana (19%); Houston, Texas (4%); Phoenix, Arizona (3%); West Palm Beach, Florida (3%); Southington, Connecticut (3%); the following labor surplus areas to include East Hartford, Connecticut (15%); Rockford, Illinois (5%); and New Britain, Connecticut (2%); various locations within the continental U.S. (3%); and various locations outside the continental U.S. (20%), and is expected to be completed in October 2030. Fiscal 2022 aircraft procurement (Navy) funds in the amount of $101,285,551; fiscal 2022 aircraft procurement (Air Force) funds in the amount of $44,081,814; FMS customer funds in the amount of $339,131,605; and non-U.S. DOD participant funds in the amount of $134,569,274 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Dec 2022: Raytheon Technologies Corp., Pratt & Whitney Engines, East Hartford, Connecticut, is awarded an $18,655,090 fixed-price incentive (firm-target) modification (P00009) to a previously awarded contract (N0001920C0011). This modification adds scope to procure long-lead materials, parts and components for Lot 17 F135 propulsion systems for F-35 Lighting II Joint Strike Fighter aircraft in support of non-U.S. Department of Defense (DOD) partners and Foreign Military Sales (FMS) customers. Work will be performed in Indianapolis, Indiana (44%); Windsor Locks, Connecticut (33%); Bristol, United Kingdom (16%); and Phoenix, Arizona (7%), and is expected to be completed in September 2025. Non-U.S. DOD participant funds in the amount of $17,394,887; and FMS funds in the amount of $1,260,203 will be obligated at the time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Jun 2023: Raytheon Technologies Corp., doing business as Pratt and Whitney Military Engines, East Hartford, Connecticut, is awarded a $2,023,073,136 fixed-price-incentive-firm, cost-plus-incentive-fee, cost reimbursable modification (P00015) to a previously awarded contract (N0001920C0011). This modification exercises options to procure materials, parts, and components for Lot 17 of the F135 Propulsion system for F-35 Lighting II Joint Strike Fighter aircraft as well as global spares requirements to include spare engines, power modules, and other hardware in support of the Air Force, Marine Corps, Navy, Non-U.S. Department of Defense (DOD) participants, cooperative program partners, and Foreign Military Sales (FMS) customers. Work will be performed in East Hartford, Connecticut (17%) (labor surplus area); Indianapolis, Indiana (10%); Middletown, Connecticut (8%); Kent, Washington (7%); North Berwick, Maine (4%); El Cajon, California (3%) (labor surplus area); Cromwell, Connecticut (3%); Whitehall, Michigan (3%); Portland, Oregon (2%); San Diego, California (2%); South Bend, Indiana (2%); Columbus, Georgia (2%); Hampton, Virginia (1%); Manchester, Connecticut (1%); Cheshire, Connecticut (1%); Elmwood Park, New Jersey (1%); and various locations outside the continental U.S. (CONUS) (33%), and is expected to be completed in December 2025. Fiscal 2023 aircraft procurement (Navy) funds in the amount of $645,518,188; fiscal 2023 (Air Force) funds in the amount of $527,686,528; fiscal 2022 aircraft procurement (Air Force) funds in the amount of $30,393,808; fiscal 2022 aircraft procurement (Navy) funds in the amount of $1,412,449; non-U.S. DOD participant funds in the amount of $417,538,909; and FMS customer funds in the amount of $400,523,253 will be obligated at the time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Jul 2023: Raytheon Technologies Corp., doing business as Pratt and Whitney Military Engines, East Hartford, Connecticut, is awarded an $81,418,740 fixed-price incentive (firm-target), cost reimbursable modification (P00017) to a previously awarded contract (N0001920C0011). This modification adds scope to procure Air Force unique F135 propulsion system spares, to include conventional takeoff and landing spare engines, power modules, gearboxes, fan modules and nozzle modules for the F-35 Lighting II Joint Strike Fighter aircraft. Work will be performed in East Hartford, Connecticut (18.9%) (labor surplus area); Middletown, Connecticut (8.9%); Kent, Washington (7.8%); North Berwick, Maine (4.4%); El Cajon, California (3.3%) (labor surplus area); Cromwell, Connecticut (3.3%); Whitehall, Michigan (3.3%); Portland, Oregon (2.2%); San Diego, California (2.2%); South Bend, Indiana (2.2%); Columbus, Georgia (2.2%); Hampton, Virginia (1.1%); Manchester, Connecticut (1.1%); Cheshire, Connecticut (1.1%); Elmwood Park, New Jersey (1.1%); and various locations within the U.S. (36.9%), and is expected to be completed in October 2025. Fiscal 2023 aircraft procurement (Navy) funds in the amount of $81,418,740 will be obligated at the time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Aug 2023: Raytheon Technologies Corp., doing business as Pratt and Whitney Military Engines, East Hartford, Connecticut, is awarded a $59,318,284 fixed-price-incentive-fee modification (P00018) to a previously awarded contract (N0001920C0011). This modification adds scope to procure Lot 16 advanced long lead time hardware in support of Lot 18 F135 propulsion systems for the F-35 Lighting II Joint Strike Fighter aircraft in support of the Navy, Air Force, Marine Corps, Foreign Military Sales (FMS) customers, and non-U.S. Department of Defense (DOD) participants. Work will be performed in East Hartford, Connecticut (20%) (labor surplus area); Indianapolis, Indiana (14.8%); Minneapolis, Minnesota (10.9%); Rocky Mountain, North Carolina (9.4%); Cleveland, Ohio (6.2%); Hartford, Connecticut (2.3%) (labor surplus area); Laconia, New Hampshire (2.3%); Detroit, Michigan (1.6%); Joplin, Missouri (1.6%); Redmond, Oregon (1.6%); Phoenix, Arizona (1%); various locations within the continental U.S. (CONUS) (1.6%); and various locations outside the CONUS (26.7%), and is expected to be completed in December 2025. Fiscal 2023 aircraft procurement (Navy) funds in the amount of $21,033,671; fiscal 2023 aircraft procurement (Air Force) funds in the amount of $492,144; FMS customer funds in the amount of $36,336,245; and non-U.S. DOD participant funds in the amount of $1,456,224, will be obligated at the time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Sep 2023: Raytheon Technologies Corp., doing business as Pratt and Whitney Military Engines, East Hartford, Connecticut, is awarded a $163,260,473 cost-plus-incentive-fee, fixed-price incentive (firm-target) modification (P00020) to a previously awarded contract (N0001920C0011). This modification exercises options to procure spare engines, power modules, special test equipment, and special tooling in support of Lot 17 F135 propulsion systems for the F-35 Lighting II Joint Strike Fighter aircraft for the Air Force, Marine Corps, Navy, non-U.S. Department of Defense (DOD) participants, cooperative program partners, and Foreign Military Sales (FMS) customers. Work will be performed in East Hartford, Connecticut (17%) (labor surplus area); Indianapolis, Indiana (10%); Middletown, Connecticut (8%); Kent, Washington (7%); North Berwick, Maine (4%); El Cajon, California (3%) (labor surplus area); Cromwell, Connecticut (3%); Whitehall, Michigan (3%); Portland, Oregon (2%); San Diego, California (2%); South Bend, Indiana (2%); Columbus, Georgia (2%); Hampton, Virginia (1%); Manchester, Connecticut (1%); Cheshire, Connecticut (1%); Elmwood Park, New Jersey (1%); and various locations within the continental U.S. (33%), and is expected to be completed in December 2025. Fiscal 2023 aircraft procurement (Navy) funds in the amount of $95,999,078; fiscal 2023 (Air Force) funds in the amount of $52,064,065; fiscal 2022 aircraft procurement (Air Force) funds in the amount of $12,403,648; and non-U.S. DOD participant funds in the amount of $2,793,681, will be obligated at the time of award, none of which will expire at the end of the current fiscal year. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Apr 2024: RTX Corp., Pratt and Whitney Military Engines, East Hartford, Connecticut, is awarded a
not-to-exceed $11,245,975 definitized modification (P00027) to a previously awarded cost-plus-incentive-fee, fixed-price incentive (firm-target) contract (N0001920C0011). This modification exercises an option and adds scope to procure Marine Corps unique spares to include three roll post ducts and nozzles; three roll post hydraulic control units; three driveshaft assemblies; and four spare clutches as well as associated engineering assistance production and program administrative labor in support of Lots 15-17 F-35 Lighting II Joint Strike Fighter. Work will be performed in East Hartford, Connecticut (20%); Indianapolis, Indiana (14.8%); Minneapolis, Minnesota (10.9%); Rocky Mountain, North Carolina (9.4%); Cleveland, Ohio (6.2%); Hartford Connecticut (2.3%); Laconia, New Hampshire (2.3%); Detroit, Michigan (1.6%); Joplin, Missouri (1.6%); Redmond, Oregon (1.6%); Phoenix, Arizona (1%); various locations within the continental U.S. (1.6%); and various locations outside the continental U.S. (26.7%), and is expected to be completed in December 2025. Fiscal 2023 aircraft procurement (Navy) funds in the amount of $11,245,975 will be obligated at time of award, none of which will expire at the end of the current fiscal year. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Dec 2021: Raytheon Technologies Corp., Pratt and Whitney Military Engines, East Hartford, Connecticut, is awarded a $218,162,159 cost-plus-incentive-fee, fixed-price incentive (firm target) modification (P00002) to a previously awarded contract (N0001920C0011). This modification adds scope to procure long-lead items in support of Lot 16 propulsion systems for F-35 Lighting II Joint Strike Fighter aircraft for the Air Force, Marine Corps, Navy, Foreign Military Sales (FMS) customers, and Non-U.S. Department of Defense (DOD) participants. Work will be performed in Indianapolis, Indiana (44%); Windsor Locks, Connecticut (33%); Bristol, United Kingdom (16%); and Phoenix, Arizona (7%), and is expected to be completed in December 2024. Fiscal 2021 aircraft procurement (Navy) funds in the amount of $66,812,836; fiscal 2021 aircraft procurement (Air Force) funds in the amount of $56,564,199; FMS funds in the amount of $43,871,979; and Non-U.S. DOD participant funds in the amount of $50,913,145 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Jun 2022: Raytheon Technologies Corp., Pratt and Whitney Military Engines, East Hartford, Connecticut, is awarded a not-to-exceed $4,385,492,639 undefinitized modification (P00005) to a previously awarded cost-plus-incentive-fee, fixed-price incentive (firm-target) contract (N0001920C0011). This modification adds scope for the production and delivery of Lot 15 and 16 F-35 Lighting II Joint Strike Fighter propulsion systems to include 152 F135-PW-100 propulsion systems (108 for the Air Force, 29 for the Navy, and 15 for the Marine Corps); and 26 F135-PW-600 propulsion systems for the Marine Corps, as well as long lead-time components, parts, and materials associated with F135-PW-100 and F135-PW-600 propulsion systems for non-U.S. Department of Defense (DOD) participants and Foreign Military Sales (FMS) customers. Additionally, this modification provides global spares requirements to include spare engines, power modules, and other hardware. This modification also provides a Block 4 Short Take-Off Vertical Landing developmental test engine for flight test efforts. Work will be performed in East Hartford, Connecticut (17%); Indianapolis, Indiana (10%); Middletown, Connecticut (8%); Kent, Washington (7%); North Berwick, Maine (4%); El Cajon, California (3%); Cromwell, Connecticut (3%); Whitehall, Michigan (3%); Portland, Oregon (2%); San Diego, California (2%); South Bend, Indiana (2%); Columbus, Georgia (1%); Hampton, Virginia (1%); Manchester, Connecticut (1%); Cheshire, Connecticut (1%); Elmwood Park, New Jersey (1%); various locations within the continental U.S. (27%); and various locations outside the continental U.S. (7%), and is expected to be completed in September 2024. Fiscal 2022 aircraft procurement (Navy) funds in the amount of $533,202,564; fiscal 2022 aircraft procurement (Air Force) funds in the amount of $486,934,274; fiscal 2021 aircraft procurement (Air Force) funds in the amount of $499,194,377; fiscal 2021 aircraft procurement (Navy) funds in the amount of $379,564,738; fiscal 2022 research, development, test and evaluation (Air Force) funds in the amount of $5,355,067; fiscal 2022 research, development, test and evaluation (Navy) funds in the amount of $5,355,066; non-U.S. DOD participants funds in the amount of $636,195,308; and FMS customer funds in the amount of $355,166,432 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Sep 2022: Raytheon Technologies Corp., Pratt and Whitney Military Engines, East Hartford, Connecticut, is awarded a not-to-exceed $277,919,144 modification (P00007) to a previously awarded cost-plus-incentive-fee, fixed-price-incentive-firm-target undefinitized contract (N0001920C0011). This modification adds scope for the production and delivery of F-35 spares, to include four Short Takeoff and Vertical Landing spare engines for the U.S. Marine Corps and 20 power modules for the U.S. Air Force. Work will be performed in East Hartford, Connecticut (17%); Indianapolis, Indiana (10%); Middletown, Connecticut (8%); Kent, Washington (7%); North Berwick, Maine (4%); El Cajon, California (3%); Cromwell, Connecticut (3%); Whitehall, Michigan (3%); Portland, Oregon (2%); San Diego, California (2%); South Bend, Indiana (2%); Columbus, Georgia (1%); Hampton, Virginia (1%); Manchester, Connecticut (1%); Cheshire, Connecticut (1%); Elmwood Park, New Jersey (1%); various locations within the Continental United States (27%), and various locations outside the Continental United States (7%), and is expected to be completed in October 2025. Fiscal 2022 aircraft procurement (Air Force) funds in the amount of $171,681,855 and fiscal 2022 aircraft procurement (Navy) funds in the amount of $106,237,289 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Dec 2022: Raytheon Technologies Corp., doing business as Pratt and Whitney Military Engines, East Hartford, Connecticut, is awarded a $619,068,244 firm-fixed-price, fixed-price incentive (firm target), cost reimbursable modification (P00008) to a previously awarded contract (N0001920C0011). This modification adds scope to procure long-lead materials, parts and components for Lot 17 F135 propulsion systems in support of the F-35 Lighting II Joint Strike Fighter aircraft for the Air Force, Marine Corps, Navy, non-U.S. Department of Defense (DOD) partners, and Foreign Military Sales (FMS) customers. Additionally, this modification adds scope for the production and delivery of four F135-PW-600 propulsion systems in support of Lots 15 and 16 F-35 Lighting II Joint Strike Fighter for non-U.S. DOD partners and FMS customers, as well as provides for integration efforts for an FMS customer into the Joint Strike Fighter program. Work will be performed in Windsor Locks, Connecticut (23%); Indianapolis, Indiana (19%); Houston, Texas (4%); Phoenix, Arizona (3%); West Palm Beach, Florida (3%); Southington, Connecticut (3%); the following labor surplus areas to include East Hartford, Connecticut (15%); Rockford, Illinois (5%); and New Britain, Connecticut (2%); various locations within the continental U.S. (3%); and various locations outside the continental U.S. (20%), and is expected to be completed in October 2030. Fiscal 2022 aircraft procurement (Navy) funds in the amount of $101,285,551; fiscal 2022 aircraft procurement (Air Force) funds in the amount of $44,081,814; FMS customer funds in the amount of $339,131,605; and non-U.S. DOD participant funds in the amount of $134,569,274 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Dec 2022: Raytheon Technologies Corp., Pratt & Whitney Engines, East Hartford, Connecticut, is awarded an $18,655,090 fixed-price incentive (firm-target) modification (P00009) to a previously awarded contract (N0001920C0011). This modification adds scope to procure long-lead materials, parts and components for Lot 17 F135 propulsion systems for F-35 Lighting II Joint Strike Fighter aircraft in support of non-U.S. Department of Defense (DOD) partners and Foreign Military Sales (FMS) customers. Work will be performed in Indianapolis, Indiana (44%); Windsor Locks, Connecticut (33%); Bristol, United Kingdom (16%); and Phoenix, Arizona (7%), and is expected to be completed in September 2025. Non-U.S. DOD participant funds in the amount of $17,394,887; and FMS funds in the amount of $1,260,203 will be obligated at the time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Jun 2023: Raytheon Technologies Corp., doing business as Pratt and Whitney Military Engines, East Hartford, Connecticut, is awarded a $2,023,073,136 fixed-price-incentive-firm, cost-plus-incentive-fee, cost reimbursable modification (P00015) to a previously awarded contract (N0001920C0011). This modification exercises options to procure materials, parts, and components for Lot 17 of the F135 Propulsion system for F-35 Lighting II Joint Strike Fighter aircraft as well as global spares requirements to include spare engines, power modules, and other hardware in support of the Air Force, Marine Corps, Navy, Non-U.S. Department of Defense (DOD) participants, cooperative program partners, and Foreign Military Sales (FMS) customers. Work will be performed in East Hartford, Connecticut (17%) (labor surplus area); Indianapolis, Indiana (10%); Middletown, Connecticut (8%); Kent, Washington (7%); North Berwick, Maine (4%); El Cajon, California (3%) (labor surplus area); Cromwell, Connecticut (3%); Whitehall, Michigan (3%); Portland, Oregon (2%); San Diego, California (2%); South Bend, Indiana (2%); Columbus, Georgia (2%); Hampton, Virginia (1%); Manchester, Connecticut (1%); Cheshire, Connecticut (1%); Elmwood Park, New Jersey (1%); and various locations outside the continental U.S. (CONUS) (33%), and is expected to be completed in December 2025. Fiscal 2023 aircraft procurement (Navy) funds in the amount of $645,518,188; fiscal 2023 (Air Force) funds in the amount of $527,686,528; fiscal 2022 aircraft procurement (Air Force) funds in the amount of $30,393,808; fiscal 2022 aircraft procurement (Navy) funds in the amount of $1,412,449; non-U.S. DOD participant funds in the amount of $417,538,909; and FMS customer funds in the amount of $400,523,253 will be obligated at the time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Jul 2023: Raytheon Technologies Corp., doing business as Pratt and Whitney Military Engines, East Hartford, Connecticut, is awarded an $81,418,740 fixed-price incentive (firm-target), cost reimbursable modification (P00017) to a previously awarded contract (N0001920C0011). This modification adds scope to procure Air Force unique F135 propulsion system spares, to include conventional takeoff and landing spare engines, power modules, gearboxes, fan modules and nozzle modules for the F-35 Lighting II Joint Strike Fighter aircraft. Work will be performed in East Hartford, Connecticut (18.9%) (labor surplus area); Middletown, Connecticut (8.9%); Kent, Washington (7.8%); North Berwick, Maine (4.4%); El Cajon, California (3.3%) (labor surplus area); Cromwell, Connecticut (3.3%); Whitehall, Michigan (3.3%); Portland, Oregon (2.2%); San Diego, California (2.2%); South Bend, Indiana (2.2%); Columbus, Georgia (2.2%); Hampton, Virginia (1.1%); Manchester, Connecticut (1.1%); Cheshire, Connecticut (1.1%); Elmwood Park, New Jersey (1.1%); and various locations within the U.S. (36.9%), and is expected to be completed in October 2025. Fiscal 2023 aircraft procurement (Navy) funds in the amount of $81,418,740 will be obligated at the time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Aug 2023: Raytheon Technologies Corp., doing business as Pratt and Whitney Military Engines, East Hartford, Connecticut, is awarded a $59,318,284 fixed-price-incentive-fee modification (P00018) to a previously awarded contract (N0001920C0011). This modification adds scope to procure Lot 16 advanced long lead time hardware in support of Lot 18 F135 propulsion systems for the F-35 Lighting II Joint Strike Fighter aircraft in support of the Navy, Air Force, Marine Corps, Foreign Military Sales (FMS) customers, and non-U.S. Department of Defense (DOD) participants. Work will be performed in East Hartford, Connecticut (20%) (labor surplus area); Indianapolis, Indiana (14.8%); Minneapolis, Minnesota (10.9%); Rocky Mountain, North Carolina (9.4%); Cleveland, Ohio (6.2%); Hartford, Connecticut (2.3%) (labor surplus area); Laconia, New Hampshire (2.3%); Detroit, Michigan (1.6%); Joplin, Missouri (1.6%); Redmond, Oregon (1.6%); Phoenix, Arizona (1%); various locations within the continental U.S. (CONUS) (1.6%); and various locations outside the CONUS (26.7%), and is expected to be completed in December 2025. Fiscal 2023 aircraft procurement (Navy) funds in the amount of $21,033,671; fiscal 2023 aircraft procurement (Air Force) funds in the amount of $492,144; FMS customer funds in the amount of $36,336,245; and non-U.S. DOD participant funds in the amount of $1,456,224, will be obligated at the time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Sep 2023: Raytheon Technologies Corp., doing business as Pratt and Whitney Military Engines, East Hartford, Connecticut, is awarded a $163,260,473 cost-plus-incentive-fee, fixed-price incentive (firm-target) modification (P00020) to a previously awarded contract (N0001920C0011). This modification exercises options to procure spare engines, power modules, special test equipment, and special tooling in support of Lot 17 F135 propulsion systems for the F-35 Lighting II Joint Strike Fighter aircraft for the Air Force, Marine Corps, Navy, non-U.S. Department of Defense (DOD) participants, cooperative program partners, and Foreign Military Sales (FMS) customers. Work will be performed in East Hartford, Connecticut (17%) (labor surplus area); Indianapolis, Indiana (10%); Middletown, Connecticut (8%); Kent, Washington (7%); North Berwick, Maine (4%); El Cajon, California (3%) (labor surplus area); Cromwell, Connecticut (3%); Whitehall, Michigan (3%); Portland, Oregon (2%); San Diego, California (2%); South Bend, Indiana (2%); Columbus, Georgia (2%); Hampton, Virginia (1%); Manchester, Connecticut (1%); Cheshire, Connecticut (1%); Elmwood Park, New Jersey (1%); and various locations within the continental U.S. (33%), and is expected to be completed in December 2025. Fiscal 2023 aircraft procurement (Navy) funds in the amount of $95,999,078; fiscal 2023 (Air Force) funds in the amount of $52,064,065; fiscal 2022 aircraft procurement (Air Force) funds in the amount of $12,403,648; and non-U.S. DOD participant funds in the amount of $2,793,681, will be obligated at the time of award, none of which will expire at the end of the current fiscal year. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Apr 2024: RTX Corp., Pratt and Whitney Military Engines, East Hartford, Connecticut, is awarded a
not-to-exceed $11,245,975 definitized modification (P00027) to a previously awarded cost-plus-incentive-fee, fixed-price incentive (firm-target) contract (N0001920C0011). This modification exercises an option and adds scope to procure Marine Corps unique spares to include three roll post ducts and nozzles; three roll post hydraulic control units; three driveshaft assemblies; and four spare clutches as well as associated engineering assistance production and program administrative labor in support of Lots 15-17 F-35 Lighting II Joint Strike Fighter. Work will be performed in East Hartford, Connecticut (20%); Indianapolis, Indiana (14.8%); Minneapolis, Minnesota (10.9%); Rocky Mountain, North Carolina (9.4%); Cleveland, Ohio (6.2%); Hartford Connecticut (2.3%); Laconia, New Hampshire (2.3%); Detroit, Michigan (1.6%); Joplin, Missouri (1.6%); Redmond, Oregon (1.6%); Phoenix, Arizona (1%); various locations within the continental U.S. (1.6%); and various locations outside the continental U.S. (26.7%), and is expected to be completed in December 2025. Fiscal 2023 aircraft procurement (Navy) funds in the amount of $11,245,975 will be obligated at time of award, none of which will expire at the end of the current fiscal year. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Status
(Complete)
Last Modified 12/4/24
Period of Performance
3/23/20
Start Date
12/31/23
Current End Date
12/31/23
Potential End Date
Obligations
$7.5B
Total Obligated
$7.5B
Current Award
$7.5B
Potential Award
Award Hierarchy
Definitive Contract
N0001920C0011
Subcontracts
Activity Timeline
Subcontract Awards
Disclosed subcontracts for N0001920C0011
Transaction History
Modifications to N0001920C0011
People
Suggested agency contacts for N0001920C0011
Competition
Number of Bidders
1
Solicitation Procedures
Sole Source
Other Than Full and Open Competition
Only One Source - Other
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No
Other Categorizations
Subcontracting Plan
Plan Not Required
Cost Accounting Standards
Yes
Business Size Determination
Large Business
Defense Program
DoD Claimant Code
Aircraft Engines And Spares
IT Commercial Item Category
Not Applicable
Awardee UEI
QN1BCFY7JDJ5
Awardee CAGE
52661
Agency Detail
Awarding Office
S0708A DCMA APO PRATT AND WHITNEY EH
Funding Office
N00019
Created By
portia.allen@dcma.mil
Last Modified By
portia.allen@dcma.mil
Approved By
portia.allen@dcma.mil
Legislative
Legislative Mandates
None Applicable
Performance District
CT-01
Senators
Richard Blumenthal
Christopher Murphy
Christopher Murphy
Representative
John Larson
Modified: 12/4/24