N0001913C0008
Definitive Contract
Overview
Government Description
F-35 LRIP 8 AAC. Supports the manufacture and delivery of F-35 Lightning II aircraft, including production of airframes, bulkheads, landing gear, and associated components such as actuators, wiring harnesses, and avionics. It includes procurement and integration of electronic components, sensors, and mission equipment, as well as non-recurring engineering for tooling, test equipment, and software lab upgrades. Additional tasks cover sustainment support, spares, technical assistance, training, reprogramming laboratory hardware, and retrofit efforts to update accepted aircraft to newer configurations.
Awardee
Awarding / Funding Agency
Place of Performance
Fort Worth, TX 76101 United States
Pricing
Fixed Price Incentive
Set Aside
None
Extent Competed
Not Competed
Related Opportunity
Analysis Notes
Amendment Since initial award the Potential End Date has been extended from 01/31/17 to 12/31/00 and the Potential Award value has increased 13% from $5,739,013,513 to $6,488,459,255.
FMS This contract was partially or fully funded by foreign funds as part of the Foreign Military Sales (FMS) assistance program.
Sole Source This Definitive Contract was awarded sole source to Lockheed Martin Corporation because the government believes that only one company can provide the product / service (FAR 6.302-1).
Subcontracting Plan This Definitive Contract has a Subcontracting Plan (with incentive). The Department of Defense has an overall small business subcontracting goal of 30%
FMS This contract was partially or fully funded by foreign funds as part of the Foreign Military Sales (FMS) assistance program.
Sole Source This Definitive Contract was awarded sole source to Lockheed Martin Corporation because the government believes that only one company can provide the product / service (FAR 6.302-1).
Subcontracting Plan This Definitive Contract has a Subcontracting Plan (with incentive). The Department of Defense has an overall small business subcontracting goal of 30%
Lockheed Martin Corporation was awarded
Definitive Contract N0001913C0008 (N00019-13-C-0008)
for F-35 LRIP 8 Advanced Acquisition Contract (AAC)
worth up to $6,488,459,255
by Naval Air Systems Command
in February 2013.
The contract
has a duration of 87 years 10 months and
was awarded
through solicitation F-35B Joint Strike Fighter - Low Rate Initial Production (LRIP) 7 Aircraft Procurement with Option for LRIP 8
full & open
with
NAICS 336411 and
PSC 1510
via sole source acquisition procedures with 1 bid received.
As of today, the Definitive Contract has a total reported backlog of $105,700,885 and funded backlog of $93,840,523.
DOD Announcements
Aug 2014:
Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $46,197,710 cost-plus-fixed-fee, fixed-price-incentive firm modification to a previously awarded advance acquisition contract (N00019-13-C-0008) for production non-recurring technical assistance in support of F-35 Lightning II Joint Strike Fighter aircraft for the U.S. Marine Corps, U.S. Air Force, U.S. Navy, and international partners. Work will be performed in El Segundo, California (38 percent); Fort Worth, Texas (24 percent); Samlesbury, United Kingdom (16.5 percent); San Diego, California (14 percent); Orlando, Florida (3.4 percent); Nashua, New Hampshire (2.3 percent); Palmdale, California (1.2 percent); Marietta, Georgia (0.3 percent); Amityville, New York (0.2 percent); Laval, Canada (0.1 percent), and is expected to be completed in May 2017. Fiscal 2012 aircraft procurement (Air Force); fiscal 2013 aircraft procurement (Navy and Marine Corps); and international partner funds in the amount of $46,197,710 are being obligated at time of award, $18,185,731 of which will expire at the end of the current fiscal year. This modification combines purchases for the U.S. Air Force ($18,185,731; 39.3 percent); U.S. Navy ($9,092,864; 19.7 percent); U.S. Marine Corps ($9,092,864; 19.7 percent), and international partners ($9,826,251; 21.3 percent). The Naval Air Systems Command, Patuxent River, Maryland, is the contracting authority.
Sep 2014: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $331,408,457 cost-plus-fixed-fee modification to a previously awarded advance acquisition contract (N00019-13-C-0008) for the procurement of production non-recurring items, including special tooling, special test equipment items and software lab upgrades in support of F-35 Lightning II Joint Strike Fighter aircraft for the U.S. Marine Corps, U.S. Air Force, U.S. Navy, international partners, and foreign military sales. Work will be performed in Fort Worth, Texas (32 percent); Nashua, New Hampshire (12 percent); Orlando, Florida (11 percent); El Segundo, California (11 percent); San Diego, California (10 percent); Cameri, Italy (6 percent); Palmdale, California (5 percent); Samlesbury, United Kingdom (3 percent); Irvine, California (2 percent); Baltimore, Maryland (2 percent); Cheltenham, United Kingdom (2 percent); East Aurora, New York (2 percent); and Marietta, Georgia (2 percent). Work is expected to be completed in December 2017. Fiscal 2014 aircraft procurement (Navy, Air Force, and Marine Corps), and international partner and foreign military sales funds in the amount of $331,408,457, are being obligated at time of award, none of which will expire at the end of the current fiscal year. This modification combines purchases for the U.S. Air Force ($112,965,518; 34 percent); U.S. Navy ($56,482,759; 17 percent); the U.S. Marine Corps ($56,482,759; 17 percent); international partners ($61,038,399; 19 percent); and foreign military sales ($44,439,022; 13 percent). The Naval Air Systems Command, Patuxent River, Maryland, is the contracting authority.
Nov 2014: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $4,123,746,486 modification to a previously awarded fixed-price-incentive firm-target contract (N00019-13-C-0008) for the production of 43 Low Rate Initial Production (LRIP) Lot VIII F-35 Lightning II aircraft. This includes manufacture and delivery of 29 F-35A aircraft for the U. S. Air Force (19), government of Italy (two), government of Norway (two), government of Japan (four) and government of Israel (two). In addition, this modification provides for 10 F-35B aircraft for the U.S. Marine Corps (six) and government of the United Kingdom (four); and four F-35C aircraft for the U.S. Navy (three) and U.S. Marine Corps (one). This modification also provides for LRIP Lot VIII production requirements, including diminishing manufacturing sources redesign and management, ancillary mission equipment, including pilot flight equipment, and concurrency changes to LRIP Lot VIII aircraft. Work will be performed in Fort Worth, Texas (55 percent); El Segundo, California (15 percent); Warton, United Kingdom (10 percent); Orlando, Florida (5 percent); Nashua, New Hampshire (5 percent); Baltimore, Maryland (5 percent); and Cameri, Italy (5 percent), and is expected to be completed in May 2017. Fiscal 2014 aircraft procurement funds (Air Force, Marine Corps and Navy), international partner funds, and foreign military sales funds in the amount of $4,120,352,986, will be obligated at the time of this award, none of which will expire at the end of the current fiscal year. This contract combines purchases for the Air Force ($1,701,415,744; 41 percent); Marine Corps ($583,570,317; 14 percent); Navy ($491,755,261; 12 percent); international partners ($786,460,233; 19 percent); and foreign military sales ($557,151,431; 14 percent). The Naval Air Systems Command, Patuxent River, Maryland, is the contracting authority.
Dec 2014: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $97,832,182 modification to a previously awarded advance acquisition contract (N00019-13-C-0008) for a financial arrangement implementing a Foreign Military Sales Letter of Offer for the government of Israel in support of the F-35 Lightning II joint program. Work will be performed in Fort Worth, Texas, and expected to be completed in December 2022. Foreign military sales funds in the amount of $30,296,783 are being obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting authority.
Feb 2015: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $39,608,596 modification to a previously awarded firm-fixed-price contract (N00019-13-C-0008) for procurement of electronic components in support of F-35 Lightning II Joint Strike Fighter aircraft for the U.S. Air Force, U.S. Marine Corps, U.S. Navy, International Partners and the Governments of Israel and Japan. These components are in support of production, sustainment and operations and maintenance requirements resulting from diminishing manufacturing sources. Work will be performed in Fort Worth, Texas, and is expected to be completed in September 2015. Fiscal 2014 aircraft procurement, Navy and Air Force, international partner and foreign military sales funds in the amount of $28,894,731 are being obligated at time of award, none of which will expire at the end of the current fiscal year. This modification combines purchases for the U.S. Air Force ($16,843,735; 43 percent), the U.S. Marine Corps ($5,996,093; 15 percent), U.S. Navy ($3,710,236; 9.4 percent), international partners ($10,485,085; 26.5 percent) and the governments of Israel ($1,362,337; 3.1 percent) and Japan ($1,211,110; 3 percent) under the Foreign Military Sales Program. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting authority.
Jun 2015: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $14,426,483 firm-fixed-price modification to a previously awarded advance acquisition contract (N00019-13-C-0008) to provide the Reprogramming Center -West, at Naval Air Station Point Mugu, California, with the primary mission equipment (hardware) required for the laboratory to meet Partner and Foreign Military Sales Mission Data File requirements in support of the F-35 Lightning II Joint Program. This contract combines purchases for the Government of Japan ($4,808,829; 33.4 percent); Government of South Korea ($4,808,827; 33.3 percent); and Government of Israel ($4,808,827; 33.3 percent) under the Foreign Military Sales Program. Work will be performed in Fort Worth, Texas, and expected to be completed in October 2017. Foreign military sales funds in the amount of $14,426,483 are being obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting authority.
Dec 2015: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $21,500,000 modification to a previously awarded advance acquisition contract (N00019-13-C-0008) to purchase, manufacture, and install various components to update the configuration of four conventional takeoff and landing variant F-35 Lightning II aircraft for the Government of Japan under the Foreign Military Sales program. In addition, this modification provides for updates to associated systems engineering products. Work will be performed in Fort Worth, Texas, and is expected to be completed in December 2016. Foreign military sales funds in the amount of $21,500,000 are being obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting authority.
May 2016: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $20,046,765 modification to a previously awarded cost-plus-fixed-fee contract (N00019-13-C-0008) for the low-rate initial production Lot 8 non-recurring special tooling/special test equipment. This equipment will be utilized in the manufacture of general material bulkheads in support of the F-35 aircraft. Work will be performed in Cleveland, Ohio (82 percent); Fort Worth, Texas (15.3 percent); Helena, Montana (1.2 percent); Winnipeg, Canada (1.2 percent); and Irvine, California (0.3 percent), and is expected to be completed in December 2017. Fiscal 2014 aircraft procurement (Air Force, Navy, Marine Corps); and international partner funds in the amount of $20,046,765 are being obligated at time of award, $15,782,818 of which will expire at the end of the current fiscal year. This contract combines purchases for the Air Force ($7,891,408; 39.4 percent); Navy ($3,945,705; 19.7 percent); Marine Corps ($3,945,705; 19.7 percent); and the international partners ($4,263,947; 21.2 percent). The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Jul 2016: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $93,862,479 modification to a previously awarded firm-fixed-price contract (N00019-13-C-0008) for procurement of diminishing manufacturing sources electronic components. The modification will support aircraft production through Lot 14 for U.S. facilities, and Lot 15 for international facilities for the F-35 Lightning II aircraft. Work will be performed in Richardson, Texas (98 percent); and Fort Worth, Texas (2 percent), and is expected to be completed in June 2017. Fiscal 2014 aircraft procurement (Air Force, Navy); fiscal 2015 aircraft procurement (Marine Corps); foreign military sales; and international partner funds in the amount of $66,720,487 are being obligated at time of award, $34,353,278 of which will expire at the end of the current fiscal year. This contract combines purchases for the Air Force ($30,048,367; 45.04 percent); Navy ($5,739,879; 13.61 percent); Marine Corps ($12,777,583; 6.12 percent); foreign military sales customers ($15,460,736; 16.47 percent); and the international partners ($29,835,914; 31.79 percent) under the Foreign Military Sales program. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting authority.
Jul 2016: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $241,765,645 modification to a previously awarded firm-fixed-price contract (N00019-13-C-0008) for procurement of diminishing manufacturing sources electronic components. The modification will support aircraft production through Lot 15 for U.S. and international facilities for the F-35 Lightning II aircraft. Work will be performed in Burlington, Vermont (98 percent); and Fort Worth, Texas (2 percent), and is expected to be completed in December 2018. Fiscal 2014 aircraft procurement (Air Force, Navy); fiscal 2015 aircraft procurement (Marine Corps.); Foreign Military Sales and international partner funds in the amount of $181,516,494 are being obligated at time of award, $148,737,805 of which will expire at the end of the current fiscal year. This contract combines purchases for the Air Force ($118,880,338; 49.17 percent); Marine Corps ($43,311,316; 17.91 percent); Navy ($30,091,791; 12.45 percent); foreign military sales customers ($23,053,873; 10.93 percent); and the international partners ($26,428,329; 9.54 percent) under the Foreign Military Sales program. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting authority.
Sep 2016: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $10,019,765 modification to a previously awarded firm-fixed-price contract (N00019-13-C-0008) to exercise an option to procure additional diminishing manufacturing sources electronic components in support of the F-35 Lightning II aircraft. Work will be performed in Fort Worth, Texas, and is expected to be completed in December 2018. Fiscal 2014 aircraft procurement (Air Force, Navy, Marine Corps.); fiscal 2015 aircraft procurement (Navy); and Fiscal 2016 aircraft procurement (Air Force, Navy, Marine Corps.) funds in the amount of $10,019,765 are being obligated at time of award, $1,762,053 of which will expire at the end of the current fiscal year. This contract combines purchases for the Air Force ($5,860,335; 58.49 percent); Marine Corps ($2,844,069; 28.38 percent), and Navy ($1,315,361; 13.13 percent). The Naval Air Systems Command, Patuxent River, Maryland, is the contracting authority.
Sep 2014: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $331,408,457 cost-plus-fixed-fee modification to a previously awarded advance acquisition contract (N00019-13-C-0008) for the procurement of production non-recurring items, including special tooling, special test equipment items and software lab upgrades in support of F-35 Lightning II Joint Strike Fighter aircraft for the U.S. Marine Corps, U.S. Air Force, U.S. Navy, international partners, and foreign military sales. Work will be performed in Fort Worth, Texas (32 percent); Nashua, New Hampshire (12 percent); Orlando, Florida (11 percent); El Segundo, California (11 percent); San Diego, California (10 percent); Cameri, Italy (6 percent); Palmdale, California (5 percent); Samlesbury, United Kingdom (3 percent); Irvine, California (2 percent); Baltimore, Maryland (2 percent); Cheltenham, United Kingdom (2 percent); East Aurora, New York (2 percent); and Marietta, Georgia (2 percent). Work is expected to be completed in December 2017. Fiscal 2014 aircraft procurement (Navy, Air Force, and Marine Corps), and international partner and foreign military sales funds in the amount of $331,408,457, are being obligated at time of award, none of which will expire at the end of the current fiscal year. This modification combines purchases for the U.S. Air Force ($112,965,518; 34 percent); U.S. Navy ($56,482,759; 17 percent); the U.S. Marine Corps ($56,482,759; 17 percent); international partners ($61,038,399; 19 percent); and foreign military sales ($44,439,022; 13 percent). The Naval Air Systems Command, Patuxent River, Maryland, is the contracting authority.
Nov 2014: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $4,123,746,486 modification to a previously awarded fixed-price-incentive firm-target contract (N00019-13-C-0008) for the production of 43 Low Rate Initial Production (LRIP) Lot VIII F-35 Lightning II aircraft. This includes manufacture and delivery of 29 F-35A aircraft for the U. S. Air Force (19), government of Italy (two), government of Norway (two), government of Japan (four) and government of Israel (two). In addition, this modification provides for 10 F-35B aircraft for the U.S. Marine Corps (six) and government of the United Kingdom (four); and four F-35C aircraft for the U.S. Navy (three) and U.S. Marine Corps (one). This modification also provides for LRIP Lot VIII production requirements, including diminishing manufacturing sources redesign and management, ancillary mission equipment, including pilot flight equipment, and concurrency changes to LRIP Lot VIII aircraft. Work will be performed in Fort Worth, Texas (55 percent); El Segundo, California (15 percent); Warton, United Kingdom (10 percent); Orlando, Florida (5 percent); Nashua, New Hampshire (5 percent); Baltimore, Maryland (5 percent); and Cameri, Italy (5 percent), and is expected to be completed in May 2017. Fiscal 2014 aircraft procurement funds (Air Force, Marine Corps and Navy), international partner funds, and foreign military sales funds in the amount of $4,120,352,986, will be obligated at the time of this award, none of which will expire at the end of the current fiscal year. This contract combines purchases for the Air Force ($1,701,415,744; 41 percent); Marine Corps ($583,570,317; 14 percent); Navy ($491,755,261; 12 percent); international partners ($786,460,233; 19 percent); and foreign military sales ($557,151,431; 14 percent). The Naval Air Systems Command, Patuxent River, Maryland, is the contracting authority.
Dec 2014: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $97,832,182 modification to a previously awarded advance acquisition contract (N00019-13-C-0008) for a financial arrangement implementing a Foreign Military Sales Letter of Offer for the government of Israel in support of the F-35 Lightning II joint program. Work will be performed in Fort Worth, Texas, and expected to be completed in December 2022. Foreign military sales funds in the amount of $30,296,783 are being obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting authority.
Feb 2015: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $39,608,596 modification to a previously awarded firm-fixed-price contract (N00019-13-C-0008) for procurement of electronic components in support of F-35 Lightning II Joint Strike Fighter aircraft for the U.S. Air Force, U.S. Marine Corps, U.S. Navy, International Partners and the Governments of Israel and Japan. These components are in support of production, sustainment and operations and maintenance requirements resulting from diminishing manufacturing sources. Work will be performed in Fort Worth, Texas, and is expected to be completed in September 2015. Fiscal 2014 aircraft procurement, Navy and Air Force, international partner and foreign military sales funds in the amount of $28,894,731 are being obligated at time of award, none of which will expire at the end of the current fiscal year. This modification combines purchases for the U.S. Air Force ($16,843,735; 43 percent), the U.S. Marine Corps ($5,996,093; 15 percent), U.S. Navy ($3,710,236; 9.4 percent), international partners ($10,485,085; 26.5 percent) and the governments of Israel ($1,362,337; 3.1 percent) and Japan ($1,211,110; 3 percent) under the Foreign Military Sales Program. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting authority.
Jun 2015: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $14,426,483 firm-fixed-price modification to a previously awarded advance acquisition contract (N00019-13-C-0008) to provide the Reprogramming Center -West, at Naval Air Station Point Mugu, California, with the primary mission equipment (hardware) required for the laboratory to meet Partner and Foreign Military Sales Mission Data File requirements in support of the F-35 Lightning II Joint Program. This contract combines purchases for the Government of Japan ($4,808,829; 33.4 percent); Government of South Korea ($4,808,827; 33.3 percent); and Government of Israel ($4,808,827; 33.3 percent) under the Foreign Military Sales Program. Work will be performed in Fort Worth, Texas, and expected to be completed in October 2017. Foreign military sales funds in the amount of $14,426,483 are being obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting authority.
Dec 2015: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $21,500,000 modification to a previously awarded advance acquisition contract (N00019-13-C-0008) to purchase, manufacture, and install various components to update the configuration of four conventional takeoff and landing variant F-35 Lightning II aircraft for the Government of Japan under the Foreign Military Sales program. In addition, this modification provides for updates to associated systems engineering products. Work will be performed in Fort Worth, Texas, and is expected to be completed in December 2016. Foreign military sales funds in the amount of $21,500,000 are being obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting authority.
May 2016: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $20,046,765 modification to a previously awarded cost-plus-fixed-fee contract (N00019-13-C-0008) for the low-rate initial production Lot 8 non-recurring special tooling/special test equipment. This equipment will be utilized in the manufacture of general material bulkheads in support of the F-35 aircraft. Work will be performed in Cleveland, Ohio (82 percent); Fort Worth, Texas (15.3 percent); Helena, Montana (1.2 percent); Winnipeg, Canada (1.2 percent); and Irvine, California (0.3 percent), and is expected to be completed in December 2017. Fiscal 2014 aircraft procurement (Air Force, Navy, Marine Corps); and international partner funds in the amount of $20,046,765 are being obligated at time of award, $15,782,818 of which will expire at the end of the current fiscal year. This contract combines purchases for the Air Force ($7,891,408; 39.4 percent); Navy ($3,945,705; 19.7 percent); Marine Corps ($3,945,705; 19.7 percent); and the international partners ($4,263,947; 21.2 percent). The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Jul 2016: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $93,862,479 modification to a previously awarded firm-fixed-price contract (N00019-13-C-0008) for procurement of diminishing manufacturing sources electronic components. The modification will support aircraft production through Lot 14 for U.S. facilities, and Lot 15 for international facilities for the F-35 Lightning II aircraft. Work will be performed in Richardson, Texas (98 percent); and Fort Worth, Texas (2 percent), and is expected to be completed in June 2017. Fiscal 2014 aircraft procurement (Air Force, Navy); fiscal 2015 aircraft procurement (Marine Corps); foreign military sales; and international partner funds in the amount of $66,720,487 are being obligated at time of award, $34,353,278 of which will expire at the end of the current fiscal year. This contract combines purchases for the Air Force ($30,048,367; 45.04 percent); Navy ($5,739,879; 13.61 percent); Marine Corps ($12,777,583; 6.12 percent); foreign military sales customers ($15,460,736; 16.47 percent); and the international partners ($29,835,914; 31.79 percent) under the Foreign Military Sales program. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting authority.
Jul 2016: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $241,765,645 modification to a previously awarded firm-fixed-price contract (N00019-13-C-0008) for procurement of diminishing manufacturing sources electronic components. The modification will support aircraft production through Lot 15 for U.S. and international facilities for the F-35 Lightning II aircraft. Work will be performed in Burlington, Vermont (98 percent); and Fort Worth, Texas (2 percent), and is expected to be completed in December 2018. Fiscal 2014 aircraft procurement (Air Force, Navy); fiscal 2015 aircraft procurement (Marine Corps.); Foreign Military Sales and international partner funds in the amount of $181,516,494 are being obligated at time of award, $148,737,805 of which will expire at the end of the current fiscal year. This contract combines purchases for the Air Force ($118,880,338; 49.17 percent); Marine Corps ($43,311,316; 17.91 percent); Navy ($30,091,791; 12.45 percent); foreign military sales customers ($23,053,873; 10.93 percent); and the international partners ($26,428,329; 9.54 percent) under the Foreign Military Sales program. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting authority.
Sep 2016: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $10,019,765 modification to a previously awarded firm-fixed-price contract (N00019-13-C-0008) to exercise an option to procure additional diminishing manufacturing sources electronic components in support of the F-35 Lightning II aircraft. Work will be performed in Fort Worth, Texas, and is expected to be completed in December 2018. Fiscal 2014 aircraft procurement (Air Force, Navy, Marine Corps.); fiscal 2015 aircraft procurement (Navy); and Fiscal 2016 aircraft procurement (Air Force, Navy, Marine Corps.) funds in the amount of $10,019,765 are being obligated at time of award, $1,762,053 of which will expire at the end of the current fiscal year. This contract combines purchases for the Air Force ($5,860,335; 58.49 percent); Marine Corps ($2,844,069; 28.38 percent), and Navy ($1,315,361; 13.13 percent). The Naval Air Systems Command, Patuxent River, Maryland, is the contracting authority.
Status
(Open)
Last Modified 9/30/26
Period of Performance
2/28/13
Start Date
12/31/00
Current End Date
12/31/00
Potential End Date
Obligations and Backlog
$6.4B
Total Obligated
$6.5B
Current Award
$6.5B
Potential Award
$93.8M
Funded Backlog
$105.7M
Total Backlog
Award Hierarchy
Definitive Contract
N0001913C0008
Subcontracts
Activity Timeline
Subcontract Awards
Disclosed subcontracts for N0001913C0008
Opportunity Lifecycle
Procurement history for N0001913C0008
Transaction History
Modifications to N0001913C0008
People
Suggested agency contacts for N0001913C0008
Competition
Number of Bidders
1
Solicitation Procedures
Sole Source
Other Than Full and Open Competition
Only One Source - Other
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No
Other Categorizations
Subcontracting Plan
Plan Required (Incentive Included)
Cost Accounting Standards
Yes
Business Size Determination
Large Business
Defense Program
DoD Claimant Code
Airframes And Spares
IT Commercial Item Category
Not Applicable
Awardee UEI
G4KDGE4JFFK7
Awardee CAGE
81755
Agency Detail
Awarding Office
N00019 NAVAL AIR SYSTEMS COMMAND
Funding Office
N00019
Created By
john.curtsinger@navy.mil
Last Modified By
dale.taylor.n00019@sa1700.navair.hq
Approved By
dale.taylor.n00019@sa1700.navair.hq
Legislative
Legislative Mandates
Materials, Supplies, Articles & Equipment
Performance District
TX-12
Senators
John Cornyn
Ted Cruz
Ted Cruz
Representative
Kay Granger
Modified: 9/30/26