FA865113C0154
Definitive Contract
Overview
Government Description
WEAPON BURIAL SECONDARY DEBRIS (WBSD)--SBIR II
Awardee
Awarding Agency
Funding Agency
Place of Performance
Torrance, CA 90505 United States
Pricing
Cost Plus Fixed Fee
Set Aside
Small Business Set Aside - Total (SBA)
Extent Competed
Full And Open Competition After Exclusion Of Sources
Est. Average FTE
7
Related Opportunity
None
Analysis Notes
Amendment Since initial award the Potential End Date has been shortened from 09/11/15 to 09/30/14.
Unrealized Backlog This Definitive Contract is complete with $2,863 of funded backlog and $2,863 of unfunded backlog unused, which is typically due to unexercised options.
Unrealized Backlog This Definitive Contract is complete with $2,863 of funded backlog and $2,863 of unfunded backlog unused, which is typically due to unexercised options.
Arctos Technology Solutions was awarded
Definitive Contract FA865113C0154 (FA8651-13-C-0154)
for Weapon Burial Secondary Debris (WBSD)--Sbir Ii
worth up to $1,496,414
by Air Force Research Laboratory
in June 2013.
The contract
has a duration of 1 year 3 months and
was awarded
with a Small Business Total set aside
with
NAICS 541712 and
PSC AC52
via direct negotiation acquisition procedures with 21 bids received.
As of today, the Definitive Contract has a total reported backlog of $2,863 and funded backlog of $2,863, though the contract is complete, so backlog may not be realized.
SBIR Details
Research Type
Small Business Innovation Research Program (SBIR) Phase II
Title
Weapon Burial Secondary Debris (WBSD)
Abstract
ABSTRACT:Most of the air delivered air force weapons are designed to detonate inside structures.However, due to targeting inaccuracies and other reasons they may land outside a structure and could detonate partially or fully buried in soil.These events could result in collateral damage to people, vehicles in the vicinity.Air force would like to have a fast running capability to assess the risk due to these events in their assessment tools.It is also possible that they may want to target a road or an airport runway to disable enemy mobility but without causing civilian casualties in the vicinity.SBIR Phase II proposal is to develop these fast running models (FRMs) using innovative testing (and instrumentations) and analytical simulation methods is presented here.BENEFIT:With the concern over collateral damage caused by a conventional weapon detonation, different types of damage mechanisms must be considered. One of these is secondary debris from ejecta when a conventional weapon is partially or completely buried.Secondary debris has the potential to cause damage/injury to collateral concerns that must be determined and minimized for all soil types. Additionally, if the weapon detonates underground next to a buried wall or structure or under a slab like a floor, sidewalk or runway; failure of that structure could result in additional damage or undesirable collateral effects.Current analytic and weaponeering tools are unable to estimate these types of damage or undesirable side effects.Successful completion of this project will result in an integrated approach to developing FRMs that can predict secondary debris due WBSD events.
Research Objective
The goal of phase II is to continue the R&D efforts initiated in Phase I. Funding is based on the results achieved in Phase I and the scientific and technical merit and commercial potential of the project proposed in Phase II.
Topic Code
AF121-097
Agency Tracking Number
F121-097-0613
Solicitation Number
2012.1
Contact
James Hudson
Status
(Complete)
Last Modified 7/6/21
Period of Performance
6/10/13
Start Date
9/30/14
Current End Date
9/30/14
Potential End Date
Obligations and Backlog
$1.5M
Total Obligated
$1.5M
Current Award
$1.5M
Potential Award
$2.9K
Funded Backlog
$2.9K
Total Backlog
Award Hierarchy
Definitive Contract
FA865113C0154
Subcontracts
Activity Timeline
Transaction History
Modifications to FA865113C0154
People
Suggested agency contacts for FA865113C0154
Competition
Number of Bidders
21
Solicitation Procedures
Negotiated Proposal/Quote
Evaluated Preference
None
Performance Based Acquisition
Yes
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No
Other Categorizations
Subcontracting Plan
Plan Not Required
Cost Accounting Standards
Exempt
Business Size Determination
Small Business
Defense Program
None
DoD Claimant Code
Weapons
IT Commercial Item Category
Not Applicable
Awardee UEI
DFJ9T2AMP233
Awardee CAGE
6W045
Agency Detail
Awarding Office
S0530A DCMA CARSON
Funding Office
F1TBAY
Created By
megan.a.schmidt-weymans.civ@mail.mil
Last Modified By
megan.a.schmidt-weymans.civ@mail.mil
Approved By
megan.a.schmidt-weymans.civ@mail.mil
Legislative
Legislative Mandates
None Applicable
Performance District
CA-43
Senators
Dianne Feinstein
Alejandro Padilla
Alejandro Padilla
Representative
Maxine Waters
Modified: 7/6/21