Contract commissioning as part of the Sand Creek Substation Stage 01 Project. Includes construction of a new 115-kV switching station consisting of a three breaker ring bus on the Erie–Hoyt–Willoby transmission lines, installation of associated electrical equipment, structures, foundations, a prefabricated control building foundation, site development, and 0.3 miles of 115-kV transmission line for approach spans into the switching station. The project also involves removing 0.3 miles of 115-kV transmission line and performing fiber optic installation, including fiber optic cables, fiber splicing, and all associated fiber equipment for Sand Creek Switching Station Stage 01.
Awardee
Awarding / Funding Agency
Place of Performance
Roggen, CO 80652 United States
Pricing
Fixed Price
Set Aside
Small Business Set Aside - Total (SBA)
Extent Competed
Full And Open Competition After Exclusion Of Sources
Related Opportunity
Analysis Notes
Forecast Listed as the incumbent award in contract forecast Sand Creek Switching Station Construction.
Amendment Since initial award the Potential Award value has increased from $7,568,746 to $7,595,676.
Incumbent Integrated Power Co has indicated it no longer qualifies as a Small Business for NAICS 237130, which may limit its ability to win future recompetes with a set-aside
Amendment Since initial award the Potential Award value has increased from $7,568,746 to $7,595,676.
Incumbent Integrated Power Co has indicated it no longer qualifies as a Small Business for NAICS 237130, which may limit its ability to win future recompetes with a set-aside
Integrated Power Co was awarded
Definitive Contract 89503225CWA000115 (895032-25-C-WA000115)
for Sand Creek Substation Stage 01 Commissioning (WAPA, RMR, 115-kV Switching Station)
worth up to $7,595,676
by Western Area Power Administration
in April 2025.
The contract
has a duration of 2 years and
was awarded
through solicitation Sand Creek Switching Station
with a Small Business Total set aside
with
NAICS 237130 and
PSC Y1PZ
via sealed bid acquisition procedures with 5 bids received.
As of today, the Definitive Contract has a total reported backlog of $7,414,176 and funded backlog of $7,414,176.
Status
(Open)
Last Modified 8/25/26
Period of Performance
4/4/25
Start Date
4/7/27
Current End Date
4/7/27
Potential End Date
Obligations and Backlog
$181.5K
Total Obligated
$7.6M
Current Award
$7.6M
Potential Award
$7.4M
Funded Backlog
$7.4M
Total Backlog
Award Hierarchy
Definitive Contract
89503225CWA000115
Subcontracts
Activity Timeline
Opportunity Lifecycle
Procurement history for 89503225CWA000115
Transaction History
Modifications to 89503225CWA000115
People
Suggested agency contacts for 89503225CWA000115
Competition
Number of Bidders
5
Solicitation Procedures
Sealed Bid
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item
Simplified Procedures for Commercial Items
No
Other Categorizations
Subcontracting Plan
Plan Not Required
Cost Accounting Standards
Exempt
Business Size Determination
Small Business
Awardee UEI
TLLRNKMCTLX7
Awardee CAGE
7G5Y4
Agency Detail
Awarding Office
895032 WESTERN-ROCKY MOUNTAIN REGION
Funding Office
895005
Created By
jpratt@wapa.gov
Last Modified By
jpratt@wapa.gov
Approved By
jpratt@wapa.gov
Legislative
Legislative Mandates
None Applicable
Performance District
CO-04
Senators
Michael Bennet
John Hickenlooper
John Hickenlooper
Representative
Ken Buck
Modified: 8/25/26