80NSSC24CA164
Definitive Contract
Overview
Government Description
SBIR PHASE II - 5G-MOSAIC: 5G MISSION-CRITICAL SIDELINK FOR AUTONOMOUS AND INTEROPERABLE COMMUNICATIONS IN LUNAR NETWORKS
Awardee
Awarding / Funding Agency
Place of Performance
Poway, CA 92064 United States
Pricing
Fixed Price
Set Aside
Small Business Set Aside - Total (SBA)
Extent Competed
Full And Open Competition After Exclusion Of Sources
Est. Average FTE
2
Related Opportunity
SBIR23P2
Episys Science was awarded
Definitive Contract 80NSSC24CA164 (80NSSC-24-C-A164)
worth up to $850,000
by Shared Services Center
in June 2024.
The contract
has a duration of 2 years and
was awarded
with a Small Business Total set aside
with
NAICS 541715 and
PSC AJ14
via direct negotiation acquisition procedures with 238 bids received.
SBIR Details
Research Type
Small Business Innovation Research Program (SBIR) Phase II
Title
5G-MOSAIC: 5G Mission-Critical Sidelink for Autonomous and Interoperable Communications in Lunar Networks
Abstract
Communication in lunar environments requires substantial modifications to current state-of-the-art (SOTA) 5G technology. The difficult terrain and long-range requirements of lunar missions introduces critical gaps between the SOTA and requirements, including hardware, inability to communicate outside of base station range, and limited device-to-device connectivity. EpiScirsquo;s solution is to provide NASA lunar missions with 3GPP-capable solutions on terrestrial SWaP-constrained platforms. This project will develop a 3GPP compliant 5G Sidelink (SL) SWaP prototype, which enables peer-to-peer communication when outside of a 5G base stationrsquo;s range and enables direct handset-to-handset connectivity. EpiScirsquo;s solution is three-fold: (1) It is a 5G SL solution (which provides relay, multi-hop, and MANET capabilities); (2) it uses a realistic 5G lunar-surface model (to meet performance evaluation needs); and (3) it is a novel interface design, similar to the Small Cell Forumrsquo;s 5G nFAPI interface, but modified to support 5G SL. While these three aspects provide an overall improved lunar network, EpiScirsquo;s solution includes additional enhancements to data speeds, traffic-offloading, prioritization, and reliability. These enhancements are enabled by an AI-based network manager to optimize traffic flows and modify configuration parameters to provide significant performance improvements. Furthermore, our team has developed a real-time 5G emulation (5GEM) tool, resulting in an adaptable, plug-and-play tool which allows the user to realistically model adverse terrains and observe the performance prior to deployment. Our 5G Mission-Critical Sidelink for Autonomous and Interoperable Communications in Lunar Networks (5G MOSAIC) solution will offer a communication solution with higher reliability and lower latency, ultimately contributing to the success of NASA#39;s lunar missions.nbsp;
Research Objective
The goal of phase II is to continue the R&D efforts initiated in Phase I. Funding is based on the results achieved in Phase I and the scientific and technical merit and commercial potential of the project proposed in Phase II.
Topic Code
H9
Agency Tracking Number
232262
Solicitation Number
SBIR_23_P2
Contact
Nasa Sbir Support Office
Status
(Open)
Last Modified 4/10/25
Period of Performance
6/6/24
Start Date
6/5/26
Current End Date
6/5/26
Potential End Date
Obligations
$850.0K
Total Obligated
$850.0K
Current Award
$850.0K
Potential Award
Award Hierarchy
Definitive Contract
80NSSC24CA164
Subcontracts
Activity Timeline
Transaction History
Modifications to 80NSSC24CA164
People
Suggested agency contacts for 80NSSC24CA164
Competition
Number of Bidders
238
Solicitation Procedures
Negotiated Proposal/Quote
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No
Other Categorizations
Subcontracting Plan
Plan Not Required
Cost Accounting Standards
Exempt
Business Size Determination
Large Business
Awardee UEI
U719HNLEESB3
Awardee CAGE
5NJ53
Agency Detail
Awarding Office
80NSSC NASA SHARED SERVICES CENTER
Funding Office
80NSSC
Created By
brandi.a.dardar@nasa.gov
Last Modified By
brandi.a.dardar@nasa.gov
Approved By
brandi.a.dardar@nasa.gov
Legislative
Legislative Mandates
None Applicable
Performance District
CA-48
Senators
Dianne Feinstein
Alejandro Padilla
Alejandro Padilla
Representative
Darrell Issa
Modified: 4/10/25