Search Prime Contracts

80NSSC24CA021

Definitive Contract

Overview

Government Description
STTR phase II bulk regolith handling technologies for landing/launch pad site preparation and blast shield construction
Awarding / Funding Agency
Place of Performance
San Antonio, TX 78232 United States
Pricing
Fixed Price
Set Aside
Small Business Set Aside - Total (SBA)
Extent Competed
Full And Open Competition After Exclusion Of Sources
Est. Average FTE
2
Related Opportunity
None
Analysis Notes
Amendment Since initial award the Potential End Date has been extended from 02/14/26 to 09/09/26.
Astroport Space Technologies was awarded Definitive Contract 80NSSC24CA021 (80NSSC-24-C-A021) for Sttr Phase Ii Bulk Regolith Handling Technologies For Landing/Launch Pad Site Preparation And Blast Shield Construction worth up to $844,773 by Shared Services Center in February 2024. The contract has a duration of 2 years 7 months and was awarded with a Small Business Total set aside with NAICS 541715 and PSC AJ14 via direct negotiation acquisition procedures with 500 bids received.

SBIR Details

Research Type
Small Technology Transfer Research Program (STTR) Phase II
Title
Bulk Regolith Handling Technologies for Landing/Launch Pad Site Preparation and Blast Shield Construction
Abstract
The Phase 2 effort further refines our Phase 1 defined CONOPS and system architecture for a lunar launch/landing pad (LLP) construction operationnbsp;based on a clear description of the envisioned fleet of fixed and mobile robotic systems and how it will evolve from the first landing, and lunar operations needed to prepare the equipment to survive the first lunar night after landing and extraction from the lander. It then establishesnbsp;how the LLP facility construction would take place with specific attention to the general LLP construction site layout, site setup, pad pavement construction with in-situ produced bricks fromnbsp;molten regolith, and finally LLP protective berm construction. The CONOPS considersnbsp;how the extensive and high-value robotic construction equipment suite could be redeployed after the LLP is complete. This includesnbsp;providing local logistics support such as lander unloading and equipment delivery from its unloaded location to its destination on the Moon, supporting Lunar Base operations, constructing new infrastructure, and mining operations to extract resources for use on the Moon. Civil engineering processes and geotechnical assessments for bulk regolith manipulations and conveyancenbsp;are further developed for LLP construction using an an end-to-end system architecture approach. Specific areas of innovation include: A bulk regolith distribution system fornbsp;hauling excavated regolith, processing at a sorting station, and sieving for feedstock production for the LLP brickmaking robotsnbsp; Definition ofnbsp;multiple autonomous machines and enabling machine-to-machine collaboration Site layout with traverse distance and path optimization Physics-based terra-mechanics simulations of vehicles and tool implementsnbsp; A physics-engine for plumenbsp;flow surface interactions Prototype universal tool-implement payload adapter for interchangeable functions of the robot mobility platformnbsp;
Research Objective
The goal of phase II is to continue the R&D efforts initiated in Phase I. Funding is based on the results achieved in Phase I and the scientific and technical merit and commercial potential of the project proposed in Phase II. STTRs are completed in conjunction with a research institution.
Partnered Research Institution
The University of Texas at San Antonio
Topic Code
T7
Agency Tracking Number
221851
Solicitation Number
STTR_22_P2
Contact
Nasa Sbir Support Office

Status
(Open)

Last Modified 4/20/26
Period of Performance
2/15/24
Start Date
9/9/26
Current End Date
9/9/26
Potential End Date
88.0% Complete

Obligations
$844.8K
Total Obligated
$844.8K
Current Award
$844.8K
Potential Award
100% Funded

Award Hierarchy

Definitive Contract

80NSSC24CA021

Subcontracts

0

Activity Timeline

Interactive chart of timeline of amendments to 80NSSC24CA021

Transaction History

Modifications to 80NSSC24CA021

People

Suggested agency contacts for 80NSSC24CA021

Competition

Number of Bidders
500
Solicitation Procedures
Negotiated Proposal/Quote
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No

Other Categorizations

Subcontracting Plan
Plan Not Required
Cost Accounting Standards
Exempt
Business Size Determination
Small Business
Awardee UEI
S4TMLJ697K15
Awardee CAGE
8T6Y5
Agency Detail
Awarding Office
80NSSC NASA SHARED SERVICES CENTER
Funding Office
80NSSC
Created By
brandi.a.dardar@nasa.gov
Last Modified By
brandi.a.dardar@nasa.gov
Approved By
brandi.a.dardar@nasa.gov

Legislative

Legislative Mandates
None Applicable
Performance District
TX-21
Senators
John Cornyn
Ted Cruz
Representative
Chip Roy
Modified: 4/20/26