80NSSC20C0205
Definitive Contract
Overview
Government Description
TOOL MATERIAL DESIGN FOR FRICTION STIR WELDING OF HIGH STRENGTH MATERIALS
Awardee
Awarding / Funding Agency
Place of Performance
Evanston, IL 60201 United States
Pricing
Fixed Price
Set Aside
Small Business Set Aside - Total (SBA)
Extent Competed
Full And Open Competition After Exclusion Of Sources
Est. Average FTE
1
Related Opportunity
None
Analysis Notes
Amendment Since initial award the Potential End Date has been extended from 07/05/22 to 12/31/23.
Questek Innovations was awarded
Definitive Contract 80NSSC20C0205 (80NSSC-20-C-0205)
for Tool Material Design For Friction Stir Welding Of High Strength Materials
worth up to $926,705
by Shared Services Center
in July 2020.
The contract
has a duration of 3 years 5 months and
was awarded
with a Small Business Total set aside
with
NAICS 541715 and
PSC AR11
via direct negotiation acquisition procedures with 500 bids received.
SBIR Details
Research Type
Small Business Innovation Research Program (SBIR) Phase II
Title
Tool Material Design for Friction Stir Welding of High Strength Materials
Abstract
In the proposed Phase II SBIR program, QuesTek Innovations LLC will build off of the successful design framework developed in the Phase I effort to optimize, scale up, and commercialize a novel cermet tool material with enhanced high temperature properties to enable friction stir weld (FSW) processing of high melting point materials such as Ni-based alloys. Having demonstrated a robust proof-of-concept design in the Phase I, QuesTek will leverage its expertise in Integrated Computational Materials Engineering (ICME) and Materials by Designreg; approach to design and model binder phase properties, optimize processing pathways, and predict cermet performance to achieve longer tool life with more affordable tool materials. The development of such a tool material would significantly enhance NASArsquo;s efforts to implement fully friction stir-welded space exploration system elements (i.e. SLS, Orion and ground systems). The efforts here would be invaluable in advancing the solid-state welding technologies at NASA in conventional friction stir-welding (C-FSW), Hybrid-FSW, thermal stir welding (TSW) of high melting point materials.nbsp;nbsp;In the current proposed Phase II effort, QuesTek will further improve the designed cermet materials by focusing on aspects such as improving feedstock materials, optimizing ball-milling and sintering conditions, tuning the ratio of binder to ceramic phase in the cermet, and others which were not able to be evaluated in the short 6-month phase I program. Detailed microstructural characterization and mechanical properties evaluation and modeling will be carried out to validate achievement of all requisite performance objectives for the tool material.nbsp;The 2-year Phase II program will also aim at prototyping of larger sintered samples that would be utilized to fabricate actual FSW tool components. These fabricated tools will be used to perform initial FSW plunge tests on Ni-based superalloys to investigate the component fracture toughness.
Research Objective
The goal of phase II is to continue the R&D efforts initiated in Phase I. Funding is based on the results achieved in Phase I and the scientific and technical merit and commercial potential of the project proposed in Phase II.
Topic Code
Z3
Agency Tracking Number
193986
Solicitation Number
SBIR_19_P2
Contact
Padma Kotaru
Status
(Complete)
Last Modified 4/8/25
Period of Performance
7/6/20
Start Date
12/31/23
Current End Date
12/31/23
Potential End Date
Obligations
$926.7K
Total Obligated
$926.7K
Current Award
$926.7K
Potential Award
Award Hierarchy
Definitive Contract
80NSSC20C0205
Subcontracts
Activity Timeline
Transaction History
Modifications to 80NSSC20C0205
People
Suggested agency contacts for 80NSSC20C0205
Competition
Number of Bidders
500
Solicitation Procedures
Negotiated Proposal/Quote
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No
Other Categorizations
Subcontracting Plan
Plan Not Required
Cost Accounting Standards
No (Waiver Approved)
Business Size Determination
Small Business
Awardee UEI
JMFVWEY5KLN6
Awardee CAGE
1QVP9
Agency Detail
Awarding Office
80NSSC NASA SHARED SERVICES CENTER
Funding Office
80NSSC
Created By
arturo.d.flores@nasa.gov
Last Modified By
cldavis
Approved By
andrea.d.martin@nasa.gov
Legislative
Legislative Mandates
None Applicable
Performance District
IL-09
Senators
Richard Durbin
Tammy Duckworth
Tammy Duckworth
Representative
Janice Schakowsky
Budget Funding
Federal Account | Budget Subfunction | Object Class | Total | Percentage |
---|---|---|---|---|
Space Technology, National Aeronautics Space Administration (080-0131) | Space flight, research, and supporting activities | Research and development contracts (25.5) | $926,705 | 100% |
Modified: 4/8/25