80GSFC24CA001
Definitive Contract
Overview
Government Description
Design, build and deliver 3 geoxo spacecraft. Includes designing, analyzing, developing, fabricating, integrating, testing, evaluating, and supporting the launch of the geoxo spacecraft, as well as providing engineering development units (EDUS), supplying and maintaining Ground System Equipment (GSE) and simulators, and supporting mission operations at the NOAA Satellite Operations Facility (NSOF). The geoxo spacecraft are three-axis stabilized geostationary satellites supporting three instruments each, with the east and west spacecraft also supporting an auxiliary communication payload for the NOAA Data Collection System (DCS). Additional work involves mechanical development, structures engineering support, Guidance, Navigation And Control (GN&C) support, quality engineering, and the use of specialized electronic components and assemblies.
Awardee
Awarding Agency
Funding Agency
Place of Performance
Littleton, CO 80125 United States
Pricing
Cost Plus Award Fee
Set Aside
None
Extent Competed
Full And Open Competition
Related Opportunity
Analysis Notes
Subcontracting Plan This Definitive Contract has an Individual Subcontract Plan. The National Aeronautics and Space Administration has an overall small business subcontracting goal of 34%
Lockheed Martin was awarded
Definitive Contract 80GSFC24CA001 (80GSFC-24-C-A001)
worth up to $2,279,447,443
by National Oceanic and Atmospheric Administration
in July 2024.
The contract
has a duration of 24 years and
was awarded
through solicitation Geostationary Extended Observations (GeoXO) Spacecraft (SC) Phase B Implementation- Final RFP
full & open
with
NAICS 336414 and
PSC AR15
via direct negotiation acquisition procedures with 2 bids received.
As of today, the Definitive Contract has a total reported backlog of $1,841,072,842 and funded backlog of $1,325,954,205.
Status
(Open)
Last Modified 6/17/26
Period of Performance
7/1/24
Start Date
6/30/48
Current End Date
6/30/48
Potential End Date
Obligations and Backlog
$438.4M
Total Obligated
$1.8B
Current Award
$2.3B
Potential Award
$1.3B
Funded Backlog
$1.8B
Total Backlog
Award Hierarchy
Definitive Contract
80GSFC24CA001
Subcontracts
Activity Timeline
Labor Services Billing
Annual labor billing rates and FTE reported for 80GSFC24CA001
| Year | Services Invoiced | Hours | FTE | Blended Rate |
|---|---|---|---|---|
| 2024 | $6,244,151 | 27,456.0 | 13.2 | $227.42 |
Subcontract Awards
Disclosed subcontracts for 80GSFC24CA001
Opportunity Lifecycle
Procurement history for 80GSFC24CA001
Transaction History
Modifications to 80GSFC24CA001
People
Suggested agency contacts for 80GSFC24CA001
Competition
Number of Bidders
2
Solicitation Procedures
Negotiated Proposal/Quote
Evaluated Preference
None
Performance Based Acquisition
Yes
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No
Other Categorizations
Subcontracting Plan
Individual Subcontract Plan
Cost Accounting Standards
Yes
Business Size Determination
Large Business
Awardee UEI
FYHNA5WC8XD7
Awardee CAGE
04236
Agency Detail
Awarding Office
80GSFC NASA GODDARD SPACE FLIGHT CENTER
Funding Office
1333CA
Created By
slsmith
Last Modified By
slsmith
Approved By
slsmith
Legislative
Legislative Mandates
None Applicable
Performance District
CO-07
Senators
Michael Bennet
John Hickenlooper
John Hickenlooper
Representative
Brittany Pettersen
Modified: 6/17/26