Search Prime Contracts

6913G622C100013

Definitive Contract

Overview

Government Description
CALLENTIS CONSULTING GROUP SBIR PHASE II AWARD UNDER TOPIC 21-FH2
Place of Performance
Austin, TX 78704 United States
Pricing
Fixed Price Level Of Effort
Set Aside
Small Business Set Aside - Total (SBA)
Extent Competed
Full And Open Competition After Exclusion Of Sources
Analysis Notes
Amendment Since initial award the Potential End Date has been extended from 06/26/24 to 09/26/24.
Recompete The following similar solicitation(s) may continue aspects of this contract: U.S. DOT Small Business Innovation Research (SBIR) FY24.2 Phase I Research Topic - Complete Streets Artificial Intelligence Initiative, U.S. DOT Small Business Innovation Research (SBIR) FY24.2 Phase I Research Topic - Complete Streets Artificial Intelligence Initiative
Callentis Consulting Group was awarded Definitive Contract 6913G622C100013 (6913G6-22-C-100013) for Callentis Consulting Group Sbir Phase Ii Award Under Topic 21-Fh2 worth up to $999,832 by Volpe National Transportation Systems Center in June 2022. The contract has a duration of 2 years 3 months and was awarded through solicitation U.S. Department of Transportation Small Business Innovation Research Fiscal Year 2021 Solicitation with a Small Business Total set aside with NAICS 541715 and PSC AS12 via direct negotiation acquisition procedures with 1 bid received.

SBIR Details

Research Type
Small Business Innovation Research Program (SBIR) Phase II
Title
In-situ Determination of Pore Solution Resistivity
Abstract
This project intends to develop a sensor system that allows in-situ measurement of concrete's pore solution resistivity, to supplement existing procedures for durability assessment. The innovation includes one or more sensors that are embedded inside concrete and a mobile measuring device to interrogate the sensor.Phase I project will explore candidate body materials for the sensor, manufacturing techniques, optimum sensor geometry/packaging, and the best methods for reading/measuring the sensor output. Phase I will also explore the costs, material availability, manufacturability, scale-up, marketability, technology transfer, and industry implementation of the proposed sensor system. Phase I output is a proof-of-concept report summarizing the above and offering one or more best prototype designs to be produced and tested in Phase II. The report will offer Phase II plans and estimated timeline for the prototype(s) production, accuracy verification, and evaluation by FHWA and State highway agencies. The report will discuss opportunities and obstacles to implementation of the technology.The project team includes Callentis Consulting Group with extensive experience in analysis and simulation of porous media, electrochemistry measurement techniques and pavement engineering, and Penn State University which brings expertise in cementitious materials, electrical property measurements and sensing of concrete, and materials science and polymer engineering.
Research Objective
The goal of phase II is to continue the R&D efforts initiated in Phase I. Funding is based on the results achieved in Phase I and the scientific and technical merit and commercial potential of the project proposed in Phase II.
Topic Code
21-FH2
Agency Tracking Number
DOT-21-FH2-001-II
Solicitation Number
6913G621QSBIR1
Contact
Nima Kargahostadi

Status
(Complete)

Last Modified 4/3/24
Period of Performance
6/27/22
Start Date
9/26/24
Current End Date
9/26/24
Potential End Date
100% Complete

Obligations
$999.8K
Total Obligated
$999.8K
Current Award
$999.8K
Potential Award
100% Funded

Award Hierarchy

Definitive Contract

6913G622C100013

Subcontracts

0

Activity Timeline

Interactive chart of timeline of amendments to 6913G622C100013

Labor Services Billing

Annual labor billing rates and FTE reported for 6913G622C100013

Opportunity Lifecycle

Procurement history for 6913G622C100013

Transaction History

Modifications to 6913G622C100013

People

Suggested agency contacts for 6913G622C100013

Competition

Number of Bidders
1
Solicitation Procedures
Negotiated Proposal/Quote
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No

Other Categorizations

Subcontracting Plan
Plan Not Required
Cost Accounting Standards
Exempt
Business Size Determination
Small Business
Awardee UEI
YD3VCU57WQZ5
Awardee CAGE
80RB6
Agency Detail
Awarding Office
6913G6 6913G6 VOLPE NATL. TRANS. SYS CNTR
Funding Office
6913G7
Created By
darren.shaffer@volpe.dot.gov
Last Modified By
alison.fecht@dot.gov
Approved By
darren.shaffer@volpe.dot.gov

Legislative

Legislative Mandates
None Applicable
Performance District
TX-37
Senators
John Cornyn
Ted Cruz
Representative
Lloyd Doggett

Budget Funding

Federal Account Budget Subfunction Object Class Total Percentage
Working Capital Fund, Transportation Systems Center, Transportation (069-4522) Other transportation Advisory and assistance services (25.1) $999,832 100%
Modified: 4/3/24