69056724C000018
Definitive Contract
Overview
Government Description
Construction services for project MT NP GLAC 14(6), Swiftcurrent Spur Road Rehabilitation. This work consists of pavement rehabilitation, new pavement section in three parking lots, 8 culvert replacements, signage, stripping, and campground loop road system improvements. Additional tasks include campground loop road system pulverizing and paving, barrier rock placement, construction survey and staking, contractor quality control and assurance, sampling and testing, soil erosion control devices, watering for dust control, earthwork such as clearing and grubbing and removal of structures and obstructions, slope reinforcement and retaining walls, aggregate courses, asphalt pavements and surface treatments, and incidental construction like pipe culverts and concrete structures including curb, sidewalk, and accessibility ramps.
Awardee
Awarding / Funding Agency
Place of Performance
West Glacier, MT 59936 United States
Pricing
Fixed Price
Set Aside
None
Extent Competed
Full And Open Competition
Related Opportunity
Analysis Notes
Amendment Since initial award the Potential End Date has been extended from 10/02/25 to 11/21/25.
Recompete The following similar solicitation(s) may continue aspects of this contract: MT FLAP BLACKF 12(1) FLAP Rehabilitation Two Medicine Road / MT NP GLAC 12(2) FLTP Rehabilitation of Two Medicine Road
Recompete The following similar solicitation(s) may continue aspects of this contract: MT FLAP BLACKF 12(1) FLAP Rehabilitation Two Medicine Road / MT NP GLAC 12(2) FLTP Rehabilitation of Two Medicine Road
Missouri River Contractors was awarded
Definitive Contract 69056724C000018 (690567-24-C-000018)
for Swiftcurrent Spur Road Rehabilitation (MT NP GLAC 14(6))
worth up to $12,836,529
by Western Federal Lands Highway Division
in September 2024.
The contract
has a duration of 1 year 2 months and
was awarded
through solicitation MT NP GLAC 14(6), Swiftcurrent Spur Road Rehabilitation
full & open
with
NAICS 237310 and
PSC Y1LB
via sealed bid acquisition procedures with 3 bids received.
Status
(Closed)
Last Modified 6/25/26
Period of Performance
9/12/24
Start Date
11/21/25
Current End Date
11/21/25
Potential End Date
Obligations
$12.8M
Total Obligated
$12.8M
Current Award
$12.8M
Potential Award
Award Hierarchy
Definitive Contract
69056724C000018
Subcontracts
Activity Timeline
Subcontract Awards
Disclosed subcontracts for 69056724C000018
Opportunity Lifecycle
Procurement history for 69056724C000018
Transaction History
Modifications to 69056724C000018
People
Suggested agency contacts for 69056724C000018
Competition
Number of Bidders
3
Solicitation Procedures
Sealed Bid
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No
Other Categorizations
Subcontracting Plan
Plan Not Required
Cost Accounting Standards
Exempt
Business Size Determination
Small Business
Awardee UEI
HAYCE9S7YYX3
Awardee CAGE
7Q5X6
Agency Detail
Awarding Office
690567 690567 WESTERN FEDERAL LANDS DIV
Funding Office
690567
Created By
angy.liljedahl@dot.gov
Last Modified By
andres.arredondo@dot.gov
Approved By
andres.arredondo@dot.gov
Legislative
Legislative Mandates
Construction Wage Rate Requirements
Performance District
MT-01
Senators
Jon Tester
Steve Daines
Steve Daines
Representative
Ryan Zinke
Modified: 6/25/26