Search Prime Contracts

47PB5426C0003

Definitive Contract

Overview

Government Description
Construction contract for the Colombia land port of entry (LPOE) border roadway improvement and construction/paving project, located at termination SH-255, laredo, TX 78040. Includes pavement repair and replacement, requiring removal of existing concrete and base material, surface reconstruction, and complete reconstruction of pavement depths between 10 and 13 inches. The project covers approximately 253,000 square feet of pavement designated for replacement and rehabilitation of concrete and asphalt paving, including vehicular traffic lanes, shoulders, and parking replacement, as well as joint seals, crack seals, Jointed Reinforced Concrete Pavement (JRCP) patching, earth embankment stabilization, and traffic control to maintain access to at least two docks at all times. All materials, labor, tools, equipment, daily supervision, and necessary safety measures are to be provided by the contractor.
Awardee
Awarding / Funding Agency
Place of Performance
Laredo, TX 78040 United States
Pricing
Fixed Price
Set Aside
Small Business Set Aside - Total (SBA)
Extent Competed
Full And Open Competition After Exclusion Of Sources
Analysis Notes
Amendment Since initial award the Potential End Date has been extended from 09/06/27 to 09/20/27.
AOC Calton was awarded Definitive Contract 47PB5426C0003 (47PB54-26-C-0003) for Colombia LPOE Border Roadway Improvement & Construction (BRIC) Project worth up to $18,417,474 by Public Buildings Service in August 2026. The contract has a duration of 1 year 1 months and was awarded through solicitation Construction Services for: Colombia Land Port of Entry (LPOE), Border Roadway Improvement & Construction (BRIC)/Paving Project, Laredo, TX with a Small Business Total set aside with NAICS 237310 and PSC Z2LB via direct negotiation acquisition procedures with 3 bids received.

Status
(Open)

Last Modified 9/25/26
Period of Performance
8/28/26
Start Date
8/20/27
Current End Date
9/20/27
Potential End Date
13.0% Complete

Obligations
$18.4M
Total Obligated
$18.4M
Current Award
$18.4M
Potential Award
100% Funded

Award Hierarchy

Definitive Contract

47PB5426C0003

Subcontracts

0

Activity Timeline

Interactive chart of timeline of amendments to 47PB5426C0003

Opportunity Lifecycle

Procurement history for 47PB5426C0003

Transaction History

Modifications to 47PB5426C0003

People

Suggested agency contacts for 47PB5426C0003

Competition

Number of Bidders
3
Solicitation Procedures
Negotiated Proposal/Quote
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No

Other Categorizations

Subcontracting Plan
Plan Not Required
Cost Accounting Standards
Exempt
Business Size Determination
Small Business
Awardee UEI
G8ADCTEZGUQ7
Awardee CAGE
9TCA3
Agency Detail
Awarding Office
47PB54 PBS PROJECT DELIVERY CAPITAL CONSTRUCTION - BRANCH WEST
Funding Office
47PB54
Created By
temica.stewart@gsa.gov
Last Modified By
temica.stewart@gsa.gov
Approved By
temica.stewart@gsa.gov

Legislative

Legislative Mandates
Construction Wage Rate Requirements
Performance District
TX-28
Senators
John Cornyn
Ted Cruz
Representative
Henry Cuellar
Modified: 9/25/26