Search Prime Contracts

140R4024C0020

Definitive Contract

Overview

Government Description
Rg- EBHD utility rehab. Includes replacement or installation of four utilities across the Elephant Butte Historic District (EBHD) site: replacement of sewer lines, removal of existing sewer lines including connections to existing manholes, installation of pvc gravity sewer lines and force main, replacement of water lines, removal of existing water lines, installation of new pvc water lines and appurtenances, and replacement of water system pumps. Additional tasks include demolition and installation of electrical services such as removal of overhead wires and power poles, installation of grade electrical wiring, electric vehicle charging stations, dark-sky compliant site lighting, and rv pedestals with receptacles, as well as installation of optical fiber, copper network cable, infrastructure for future isp connection, network switches, wireless access points, and replacement of three existing water storage tanks.
Place of Performance
Elephant Butte, NM 87935 United States
Pricing
Fixed Price
Set Aside
Small Business Set Aside - Total (SBA)
Extent Competed
Full And Open Competition After Exclusion Of Sources
Analysis Notes
Amendment Since initial award the Potential End Date has been extended from 10/20/25 to 05/31/26 and the Potential Award value has increased 24% from $11,272,524 to $13,934,209.
Orcom, A Division Of Ortega Companies was awarded Definitive Contract 140R4024C0020 (140R40-24-C-0020) for RG- EBHD Utility Rehab worth up to $13,934,209 by the Bureau of Reclamation in September 2024. The contract has a duration of 1 year 8 months and was awarded through solicitation RG- EBHD UTILITY REHAB with a Small Business Total set aside with NAICS 237110 and PSC Z2NZ via direct negotiation acquisition procedures with 1 bid received.

Status
(Open)

Last Modified 5/1/26
Period of Performance
9/20/24
Start Date
5/31/26
Current End Date
5/31/26
Potential End Date
96.0% Complete

Obligations
$13.9M
Total Obligated
$13.9M
Current Award
$13.9M
Potential Award
100% Funded

Award Hierarchy

Definitive Contract

140R4024C0020

Subcontracts

0

Activity Timeline

Interactive chart of timeline of amendments to 140R4024C0020

Opportunity Lifecycle

Procurement history for 140R4024C0020

Transaction History

Modifications to 140R4024C0020

People

Suggested agency contacts for 140R4024C0020

Competition

Number of Bidders
1
Solicitation Procedures
Negotiated Proposal/Quote
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No

Other Categorizations

Subcontracting Plan
Plan Not Required
Cost Accounting Standards
Exempt
Business Size Determination
Small Business
Awardee UEI
FLM4ZKCJM3Q4
Awardee CAGE
6D4D6
Agency Detail
Awarding Office
140R40 UPPER COLORADO REGIONAL OFFICE
Funding Office
140R43
Created By
tvillegas
Last Modified By
kruizjim
Approved By
kruizjim

Legislative

Legislative Mandates
Construction Wage Rate Requirements Materials, Supplies, Articles & Equipment
Performance District
NM-02
Senators
Martin Heinrich
Ben Luján
Representative
Gabriel (Gabe) Vasquez
Modified: 5/1/26