Search Prime Contracts

140R3026C0003

Definitive Contract

Overview

Government Description
Brock reservoir gates replacement. Includes replacing 11 existing cast iron gates installed in concrete channels with 316L Stainless Steel (SS) slide gates, replacing existing gear boxes, actuators, stem protection, and other associated components to meet technical specifications and robust operational requirements. The project also involves replacing the existing Cathodic Protection (CP) system with new corrosion protection technology, removing the trash rake system including the conveyor belt and debris pad, and recoating stoplog guides, wall thimbles, and water level measurement equipment.
Awardee
Place of Performance
Winterhaven, CA 92283 United States
Pricing
Fixed Price
Set Aside
None
Extent Competed
Full And Open Competition
Analysis Notes
Subcontracting Plan This Definitive Contract has an Individual Subcontract Plan. The Department of the Interior has an overall small business subcontracting goal of 44%
Mcmillen was awarded Definitive Contract 140R3026C0003 (140R30-26-C-0003) for Brock Reservoir Gates Replacement worth up to $7,161,200 by USBR Lower Colorado Basin Region, Boulder City, NV in March 2026. The contract has a duration of 1 year 6 months and was awarded through solicitation BROCK RESERVOIR GATE REPLACEMENT/REPAIRS full & open with NAICS 237990 and PSC Z1KB via direct negotiation acquisition procedures with 4 bids received.

Status
(Open)

Last Modified 3/13/26
Period of Performance
3/13/26
Start Date
9/9/27
Current End Date
9/11/27
Potential End Date
17.0% Complete

Obligations
$7.2M
Total Obligated
$7.2M
Current Award
$7.2M
Potential Award
100% Funded

Award Hierarchy

Definitive Contract

140R3026C0003

Subcontracts

0

Activity Timeline

Interactive chart of timeline of amendments to 140R3026C0003

Opportunity Lifecycle

Procurement history for 140R3026C0003

People

Suggested agency contacts for 140R3026C0003

Competition

Number of Bidders
4
Solicitation Procedures
Negotiated Proposal/Quote
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No

Other Categorizations

Subcontracting Plan
Individual Subcontract Plan
Cost Accounting Standards
Exempt
Business Size Determination
Large Business
Awardee UEI
C3JZNM5ZLAL1
Awardee CAGE
41PM4
Agency Detail
Awarding Office
140R30 LOWER COLORADO REGIONAL OFFICE
Funding Office
140R30
Created By
drodrig
Last Modified By
mruble
Approved By
mruble

Legislative

Legislative Mandates
Construction Wage Rate Requirements
Performance District
CA-25
Senators
Dianne Feinstein
Alejandro Padilla
Representative
Raul Ruiz
Modified: 3/13/26