140R3026C0003
Definitive Contract
Overview
Government Description
Brock reservoir gates replacement. Includes replacing 11 existing cast iron gates installed in concrete channels with 316L Stainless Steel (SS) slide gates, replacing existing gear boxes, actuators, stem protection, and other associated components to meet technical specifications and robust operational requirements. The project also involves replacing the existing Cathodic Protection (CP) system with new corrosion protection technology, removing the trash rake system including the conveyor belt and debris pad, and recoating stoplog guides, wall thimbles, and water level measurement equipment.
Awardee
Awarding / Funding Agency
Place of Performance
Winterhaven, CA 92283 United States
Pricing
Fixed Price
Set Aside
None
Extent Competed
Full And Open Competition
Related Opportunity
Analysis Notes
Subcontracting Plan This Definitive Contract has an Individual Subcontract Plan. The Department of the Interior has an overall small business subcontracting goal of 44%
Mcmillen was awarded
Definitive Contract 140R3026C0003 (140R30-26-C-0003)
for Brock Reservoir Gates Replacement
worth up to $7,161,200
by USBR Lower Colorado Basin Region, Boulder City, NV
in March 2026.
The contract
has a duration of 1 year 6 months and
was awarded
through solicitation BROCK RESERVOIR GATE REPLACEMENT/REPAIRS
full & open
with
NAICS 237990 and
PSC Z1KB
via direct negotiation acquisition procedures with 4 bids received.
Status
(Open)
Last Modified 3/13/26
Period of Performance
3/13/26
Start Date
9/9/27
Current End Date
9/11/27
Potential End Date
Obligations
$7.2M
Total Obligated
$7.2M
Current Award
$7.2M
Potential Award
Award Hierarchy
Definitive Contract
140R3026C0003
Subcontracts
Activity Timeline
Opportunity Lifecycle
Procurement history for 140R3026C0003
People
Suggested agency contacts for 140R3026C0003
Competition
Number of Bidders
4
Solicitation Procedures
Negotiated Proposal/Quote
Evaluated Preference
None
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No
Other Categorizations
Subcontracting Plan
Individual Subcontract Plan
Cost Accounting Standards
Exempt
Business Size Determination
Large Business
Awardee UEI
C3JZNM5ZLAL1
Awardee CAGE
41PM4
Agency Detail
Awarding Office
140R30 LOWER COLORADO REGIONAL OFFICE
Funding Office
140R30
Created By
drodrig
Last Modified By
mruble
Approved By
mruble
Legislative
Legislative Mandates
Construction Wage Rate Requirements
Performance District
CA-25
Senators
Dianne Feinstein
Alejandro Padilla
Alejandro Padilla
Representative
Raul Ruiz
Modified: 3/13/26