Search Contract Opportunities

632-16-101 Upgrade Emergency Generators - Phase I   3

ID: 36C24225R0007 • Type: Solicitation • Match:  95%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

Posted: Jan. 3, 2025, 2:13 p.m. EST
RFI#2 Emergency Generator Solicitation # 36C24225R007 1. Does VA fill 2-fuel storage tanks after load bank and generator test? Specification section 263213 3.2.O requires that the contractor fill the main storage tank and day tank at the completion of all field tests. This shall require all main fuel tanks to be filled at the completion of all field testing. The contractor shall also provide all fuel for testing. 2. Is Schneider electric doing refurbishment and installation of all replacement breakers in gear `room? Keynote 3 states Square D/Schneider Electric is basis of design. Schneider through Colonial Electric has provided a scope of work and quote for a manufacturer replacement circuit breaker designed to fit within the existing switch gear this contract does not limit the manufacturer selection to Square D/Schneider Electric. 3. Are we following VA Specification for all electrical wiring installation? Contractor to following all project specifications as issued. 4. For the above-mentioned solicitation, the "wage rate sheet" attachment will not open. can you provide or post it in a different format? See attached. 5. Please confirm that CQC System Manager may have fill other roles, including project superintendent. Specification section 014500 part 3.4.B, if the Project Superintendent meets CQC System Manager qualifications and VA approval, the CQC System Manager could serve dual duties as Project Superintendent. 6. Is the GC required to use Submittal Exchange? If so, does the GC need to include the cost as part of their bid? Contractor and sub-contractors are required to utilize Autodesk Construction Cloud (ACC) for any construction related documentation exchange. Access to ACC platform is provided to contractors at no cost for the duration of the project. Refer to specification 013200 Construction Documentation included in the solicitation. 7. Is there a geotechnical report that can be provided? A Geotechnical report does not exist for this project since the government would not allow borings to be conducted during the design phase. See specification section 014529 3.1. 8. Is there an environmental (soils, other hazardous materials) report available that can be provided? See attached soil report. 9. How will unsuitable and/or contaminated soils be handled? (i.e. priced as a change order or allowance?) See specification section 312000 3.6.E. 10. Are taxes applicable on this project? Yes. 11. Per specification 01 00 00-1.3 there are 3 bid items but no location to fill in on the SF1442. Is there a pricing page missing from the SF1442? The Bid Alternate page is missing from the SF 1442. Please see attached. 12. For each bid item, please confirm that these are priced as sequential deducts and not stand alone. On sheet GI001 schedule of bid items states A: Item 1 is the projects base bid and B: Item 2 is the Bid Deduct 1 minus the items included. 13. What fire alarm system is currently in place? The current fire alarm system in place is the Edwards EST3 series. 14. What BAS system is currently in place? The current BAS is Johnson Controls FX. 15. Can AISC certification be waived on this project? The steel scope is not substantial enough for many of the certified companies in the area. AISC certification is required and cannot be waived. 16. Alternate bid items are not consistently identified throughout the plans (alternates shown on Aseries drawings but not on E-series). Please confirm that there are indeed (2) alternate bid items and clearly define the associated scopes. On sheet GI001 there is 1 deduct alternative item. E-series sheets show phasing notes on EG001, new callout added to electrical floor plan EP101, and on the electrical one-line EE602. 17. Is the contractor required to provide the initial fuel for the generator day tanks? Specification section 263213 3.2.O requires that the contractor fill the main storage tank and day tank at the completion of all field tests. This shall require all main fuel tanks to be filled at the completion of all field testing. The contractor shall also provide all fuel for testing. 18. What size are the existing domestic water and fire lines? The size of the piping is as follows: fire protection 10 in diameter and domestic water 8 in diameter. 19. The demo plans call for cutting, capping, and removing the existing water main. Will the new water main be installed before the demo? The new water main will be installed immediately after the new point of connection is established and the overburden is removed from the existing duct bank. This will be during demolition and a domestic water shutdown will require scheduling with the VA. 20. Details call for a tapping sleeve and gate valve for the water services 4" to 8". Will this be required for the domestic and fire line relocates? The connection tap, in the water services detail, is not applicable. The project does not involve the installation of a connection tap. This project only involves the relocation of the sprinkler and domestic main piping. 21. The final cut and caps of the domestic and fire line will require a shutdown. How long are we allowed to shut down the water for? Can this be done during day-time hours? Water shut down shall be done on the weekend during the minimal water usage. Work shall be prepared and phased to minimize the shutdown to no more than 8 hours. 22. Can the Bid Date be extended another week? The RFP due WILL be extended to January 14, 2025, at 11:00 AM. 23. Will there be another one? No, only one site visit was schedule for this project. 24. I also see this is a negotiated bid. Will we be able to provide a quote that will be considered being that we did not go to the site visit? Yes, your firm can still submit an RFP regardless of if you attended the site visit or not. The site visit was not mandatory. 25. Will you be uploading a copy of the sign in sheet to SAM? (if so when do you anticipate). See attached. DRAWINGS: 1. The following drawings are revised as follows (attached): a. AE101: The concrete pad width, under NEW 200CR , is to be extended to 7-feet. b. C-0.0: Add GENERAL SHEET NOTE 1 - The existing fire protection piping, within the new building area, shall be demolished and removed. All work shall be completed during Phase 2. c. C-2.0: Add GENERAL SHEET NOTE 1 The new fire protection piping shall be installed prior to the end Phase 2. 2. Drawing sheets are reissued as follows: a. PD101: i. Partial basement plan was added illustrating the existing main water main to be demolished. ii. Supporting key notes 4, 5, and 6 have been added. b. P101: i. Partial basement plan was added illustrating the new domestic water main connection to the existing domestic water main. ii. Supporting key notes 7 and 8 have been added. c. EP101: i. Adjusted the equipment footprint of NEW 200CR, 200EQ, and 200EQ4 to accurately match the manufacturer s physical dimensions. ii. Relocated NEW 200NDP1 from A0-11B Switchgear room to A0-11 Access to Utilities Room. d. EY-101: i. Adjusted the equipment footprint of NEW 200CR, 200EQ, and 200EQ4 to accurately match the manufacturer s physical dimensions. ii. Relocated NEW 200NDP1 from A0-11B Switchgear room to A0-11 Access to Utilities Room. e. EE-404: i. Adjusted the equipment footprint of NEW 200CR, 200EQ, and 200EQ4 to accurately match the manufacturer s physical dimensions. ii. Relocated NEW 200NDP1 from A0-11B Switchgear room to A0-11 Access to Utilities Room. iii. Adjusted conduit routing to 200NDP1. f. EE602: i. Added ATS sizes to the drawings. ii. Added output feeder sizes for all ATS . iii. Added MCB to the 200LS panelboard. iv. Removed main breaker out of 200EQ4. g. EE702: i. Updated the schedule for 200CR. h. EE703 i. Updated the schedule for 200EQ. ii. Updated the schedule for 200EQ4.
Posted: Dec. 9, 2024, 10:44 a.m. EST
Posted: Dec. 2, 2024, 10:31 a.m. EST
Posted: Nov. 26, 2024, 8:13 a.m. EST
Background
The project titled 'Upgrade Emergency Generators Phase I' (Project No. 632-16-101) is initiated by the Northport Veterans Affairs Medical Center (VAMC). The existing emergency generator serving Building 200 and its related automatic transfer switches have surpassed their useful life and require replacement to ensure continued operational efficiency and safety.

Work Details
The contractor is required to perform the following tasks:

- Install new underground fuel oil storage tanks near Building 200;
- Remove existing underground fuel oil storage tanks near Building 200;
- Install a temporary generator to serve Building 200 until the new generators are commissioned and accepted, with all associated costs borne by the contractor;
- Remove and dispose of the existing Building 200 generator and accessories;
- Construct a new emergency generator room addition;
- Install new emergency generators and accessories;
- Install new emergency generator paralleling switchgear, secondary voltage switchgear, and distribution;
- Replace existing Building 200 transfer switches, accessories, and power distribution.

Additionally, all work in Building 200 North main electrical room D0-5 shall be Deductive Alternate No. 1. The contract does not involve access to VA sensitive information or connection to the VA information system. Modify existing Main Switchgear to accommodate new circuit breakers as shown in contract documents.

Period of Performance
The contractor shall complete the work required under this Statement of Work (SOW) in 575 days from the date of award.

Place of Performance
Northport VAMC, 79 Middleville Road, Northport, NY 11768

Overview

Response Deadline
Jan. 14, 2025, 11:00 a.m. EST (original: Dec. 9, 2024, 11:00 a.m. EST) Past Due
Posted
Nov. 26, 2024, 8:13 a.m. EST (updated: Jan. 3, 2025, 2:13 p.m. EST)
Set Aside
None
Place of Performance
Not Provided
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Signs of Shaping
95% of similar contracts within the Veterans Health Administration had a set-aside.
On 11/26/24 VISN 2: New York/New Jersey VA Health Care Network issued Solicitation 36C24225R0007 for 632-16-101 Upgrade Emergency Generators - Phase I due 1/14/25. The opportunity was issued full & open with NAICS 236220 and PSC Z1DA.
Primary Contact
Title
Contract Specialist
Name
Lester S Griffith   Profile
Phone
None

Documents

Posted documents for Solicitation 36C24225R0007

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Solicitation 36C24225R0007

Award Notifications

Agency published notification of awards for Solicitation 36C24225R0007

Contract Awards

Prime contracts awarded through Solicitation 36C24225R0007

Incumbent or Similar Awards

Contracts Similar to Solicitation 36C24225R0007

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation 36C24225R0007

Similar Active Opportunities

Open contract opportunities similar to Solicitation 36C24225R0007

Experts for 632-16-101 Upgrade Emergency Generators - Phase I

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
VETERANS AFFAIRS, DEPARTMENT OF > VETERANS AFFAIRS, DEPARTMENT OF > 242-NETWORK CONTRACT OFFICE 02 (36C242)
FPDS Organization Code
3600-00242
Source Organization Code
100186522
Last Updated
Feb. 13, 2025
Last Updated By
Lester.Griffith@va.gov
Archive Date
Feb. 13, 2025