Search Contract Opportunities

Yell Fiber Broadband to Grant   2

ID: 140P1426R0014 • Type: Solicitation • Match:  95%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading

Description

Yellowstone National Park - Fiber Broadband to Grant
Description: The selected provider must install several miles of underground fiber optic connections, extending from a common demarcation point to specific NPS facilities, to support these services. When submitting an offer, a provider must include details of the offered 24x7x365 internet support services, including method of customer contact, response times, and customer notifications for scheduled and unscheduled outages.
A right of way (ROW) permit is required any time that a service provider builds or installs a utility on NPS lands. Projects including broadband equipment, such as telecommunication sites, microwave, and fiber optic, require a ROW permit as well. A ROW permit is required prior to beginning work. A ROW is issued by the National Park Service (NPS) and it allows a utility to pass over, under, or through NPS property. The permit may be issued only pursuant to specific statutory authority regardless of whether the equipment is serving the NPS and its visitors or crossing the park to reach other communities.
Offeror must be able to obtain and maintain a valid right of way or other permit conveyance to operate equipment in the National Park. ANNUAL WORK PLAN: The Park Superintendent, and/or her/his representatives shall receive in writing from the Contractor by April 1st of each year, a plan(s) for any maintenance, vegetation management, or work activities or projects to be carried out in that current calendar year in the approved right-of-way (Work Area) or authorized ingress/egress routes.
Location of Work: Yellowstone National Park, Teton County, Wyoming, USA
Type of Procurement: A negotiated firm-fixed contract will be awarded in response to the solicitation. The government will consider an offeror's technical capability in comparison to its price.
Project Magnitude: Between $250,000 and $500,000
Specifications and other supporting documents are attached and incorporated herein. Refer to SECTION J.
SET-ASIDE TYPE: This procurement is being solicited unrestricted (not set aside). The small business size standard for NAICS 237130 is $45 million.
NAICS CODE: 237130, Power and Communication Line and Related Structures Construction with a small business size standard of $45M.
DURATION: See FAR 52.211-10.
SITE VISIT: See FAR 52.236-27 for additional information. Site visits may be arranged during normal duty hours by contacting: Name: Bret DeYoung AND Molly Lynam - bret_deyoung@nps.gov AND molly_lynam@ios.doi.gov **Requests shall be made at least 2 business days in advance and well in advance of the due date.**
WAGE RATES: Davis Bacon wage rates apply and are included as part of this solicitation package.
SYSTEM FOR AWARD MANAGEMENT (SAM): The successful offeror must be registered in SAM and have current online Representations and Certifications. Please access http://www.sam.gov to update your records prior to submitting final offer.
INSTRUCTIONS FOR SUBMITTING OFFER: Refer to Section L and M. The contractor agrees that they will follow the plans and specifications provided. Offers must be provided electronically.
QUESTIONS: Any questions regarding this solicitation shall be submitted in writing to Molly Lynam, Contract Specialist, at molly_lynam@ios.doi.gov no later than ten (10) calendar days prior to the offer due date.
Background
The National Park Service (NPS) is seeking a provider to install underground fiber optic connections within Yellowstone National Park, specifically from a common demarcation point to designated NPS facilities.

This initiative aims to replace outdated infrastructure that currently relies on low bandwidth microwave and copper circuits, which are inadequate for modern broadband needs. The goal is to enhance operational efficiency, improve public safety, and provide better services for park visitors.

Work Details
The selected contractor will be responsible for the following:
- Installation of several miles of underground fiber optic connections.
- Provision of 24x7x365 internet support services, including customer contact methods, response times, and outage notifications.
- Compliance with Right of Way (ROW) permit requirements for utility installations on NPS lands.
- Annual Work Plan submission by April 1st each year detailing maintenance and project activities in the approved right-of-way.

Specific services include:
1. Dark Fiber, Backhaul: Dedicated fiber runs between two locations in separate developed areas.
2. Dark Fiber, Zero-Mile: Dedicated fiber run between multiple locations in a developed area (Campus LAN).
3. Business Class Internet Access: Lit fiber service at a single location with dedicated internet access.
4. MDU Internet Access: Shared internet access for employee dorms and multi-tenant units.
5. Residential Class Internet Access: Shared internet access for employee housing and guest access in single building locations.

Period of Performance
The contract performance period is from June 29, 2026, to June 28, 2027.

Place of Performance
Work will be performed at Yellowstone National Park, Teton County, Wyoming, USA.

Overview

Response Deadline
June 1, 2026, 5:00 p.m. EDT Due in 17 Days
Posted
May 5, 2026, 10:18 a.m. EDT
Set Aside
None
Place of Performance
Yellowstone National Park, WY 82190 United States
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Est. Value Range
$250,000 - $500,000 (value based on agency estimated range)
Signs of Shaping
60% of similar contracts within the National Park Service had a set-aside.
On 5/5/26 NPS Intermountain Region issued Solicitation 140P1426R0014 for Yell Fiber Broadband to Grant due 6/1/26. The opportunity was issued full & open with NAICS 237130 and PSC 6099.
Primary Contact
Name
Lynam, Molly   Profile
Phone
molly_lynam@ios.doi.gov

Additional Contacts in Documents

Title Name Email Phone
None Bret DeYoung Profile bret_deyoung@nps.gov None

Documents

Posted documents for Solicitation 140P1426R0014

Opportunity Assistant


AI Analysis

AI Generate

Opportunity Lifecycle

Procurement notices related to Solicitation 140P1426R0014

Incumbent or Similar Awards

Contracts Similar to Solicitation 140P1426R0014

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation 140P1426R0014

Similar Active Opportunities

Open contract opportunities similar to Solicitation 140P1426R0014

Experts for Yell Fiber Broadband to Grant

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
INTERIOR, DEPARTMENT OF THE > NATIONAL PARK SERVICE > IMR NORTHERN ROCKIES(12200)
FPDS Organization Code
1443-12200
Source Organization Code
100163582
Last Updated
May 5, 2026
Last Updated By
fbms_acq@ios.doi.gov
Archive Date
June 16, 2026