Replace Boiler Plant and Steam Distribution System 4
ID: 36C10F19R0086 • Type: Solicitation
• Match:
90%
Opportunity Assistant
Loading
Overview
Response Deadline
April 27, 2020, 12:00 a.m. EDT (original: Feb. 11, 2020, 11:59 p.m. EST)
Past Due
Posted
Jan. 8, 2020, 2:23 p.m. EST (updated: April 21, 2020, 5:41 p.m. EDT)
Set Aside
None
Place of Performance
Not Provided
Source
Links
36C10F19R0086 36C10F19R0086_3.docx
36C10F19R0086 JOFOC Redacted.pdf
36C10F19R0086 Construction Wage Rate Requirements.pdf
36C10F19R0086 PP Questionnaire.pdf
36C10F19R0086 01 General Drawings_Part1.pdf
36C10F19R0086 02 Hazardous Drawings.pdf
36C10F19R0086 01 General Drawings_Part2.pdf
36C10F19R0086 03 Civil Drawings_Part1.pdf
36C10F19R0086 03 Civil Drawings_Part2.pdf
36C10F19R0086 04 Structural Drawings.pdf
36C10F19R0086 05 Architectural Drawings Part 1_Part1.pdf
36C10F19R0086 05 Architectural Drawings Part 1_Part2.pdf
36C10F19R0086 05 Architectural Drawings Part 1_Part3.pdf
36C10F19R0086 05 Architectural Drawings Part 2_Part1.pdf
36C10F19R0086 05 Architectural Drawings Part 2_Part2.pdf
36C10F19R0086 05 Architectural Drawings Part 2_Part3.pdf
36C10F19R0086 06 Interiors Drawings.pdf
36C10F19R0086 07 Equipment Drawings.pdf
36C10F19R0086 08 Fire Alarm Drawings.pdf
36C10F19R0086 09 Fire Protection Drawings.pdf
36C10F19R0086 10 Plumbing Drawings_Part1.pdf
36C10F19R0086 10 Plumbing Drawings_Part2.pdf
36C10F19R0086 11 Mechanical Drawings Part 1_Part1.pdf
36C10F19R0086 11 Mechanical Drawings Part 1_Part2.pdf
36C10F19R0086 11 Mechanical Drawings Part 1_Part3.pdf
36C10F19R0086 11 Mechanical Drawings Part 2_Part1.pdf
36C10F19R0086 11 Mechanical Drawings Part 2_Part2.pdf
36C10F19R0086 11 Mechanical Drawings Part 2_Part3.pdf
36C10F19R0086 12 Electrical Drawings Part 1_Part1.pdf
36C10F19R0086 12 Electrical Drawings Part 1_Part2.pdf
36C10F19R0086 12 Electrical Drawings Part 2_Part1 02.pdf
36C10F19R0086 12 Electrical Drawings Part 2_Part2.pdf
36C10F19R0086 Alexandria Boiler Plant Final Bid Documents Submission Combined Specifications 191211.pdf
36C10F19R0086 Construction Wage Rate Requirement.pdf
36C10F19R0086 0001 36C10F19R0086 0001.docx
36C10F19R0086 0001 Pre-proposal Conference Sign In Sheet.pdf
36C10F19R0086 0001 SF501 Structural Drawing.pdf
36C10F19R0086 0001 PreProposal Conf Slides.ppt
36C10F19R0086 0002 36C10F19R0086 0002.docx
36C10F19R0086 0002 Alexandria Boiler Plant Amendment #2 All RFI Responses 2-3-20.pdf
36C10F19R0086 0002 1020(4_12)F- Tax Exempt Certificate.pdf
36C10F19R0086 0002 RFI 5 Marble Partition.jpg
36C10F19R0086 0002 RFI 5 Marble Partition_4.jpg
36C10F19R0086 0002 RFI 5 Marble Partition_2.jpg
36C10F19R0086 0002 RFI 5 Marble Partition_3.jpg
36C10F19R0086 0002 VA10091- Vendorization Form.pdf
36C10F19R0086 0002 RFI #91 Insurance Liability.pdf
36C10F19R0086 0002 RFI 19 Portable 1000hp Boiler Nameplate.jpg
36C10F19R0086 0002 RFI 19 Portable 1000hp Boiler Nameplate 2.jpg
36C10F19R0086 0002 RFI 90.6 Boiler #1.jpg
36C10F19R0086 0002 RFI 90.6 Boiler #1 Nameplate.jpg
36C10F19R0086 0002 RFI 90.6 Boiler #2 Nameplate.jpg
36C10F19R0086 0002 RFI 90.6 Boiler #2_1.jpg
36C10F19R0086 0002 RFI 90.6 Boiler #2_2.jpg
36C10F19R0086 0002 RFI 90.6 Boiler #2.jpg
36C10F19R0086 0002 RFI 90.6 Boiler #3.jpg
36C10F19R0086 0002 RFI 90.6 Boiler #3_1.jpg
36C10F19R0086 0002 RFI 90.6 Boiler #3_2.jpg
36C10F19R0086 0002 RFI 90.6 Boiler #3_3.jpg
36C10F19R0086 0002 RFI 90.6 DA Tank.jpg
36C10F19R0086 0002 RFI 90.6 DA Tank_1.jpg
36C10F19R0086 0002 RFI 90.6 Makeup Water Tank.jpg
36C10F19R0086 0002 RFI 90.6 Boiler #3 Nameplate.jpg
36C10F19R0086 0002 Drawing AE101.pdf
36C10F19R0086 0002 Drawing MS102A.pdf
36C10F19R0086 0002 Drawing AS100.pdf
36C10F19R0086 0002 Drawing AF101.pdf
36C10F19R0086 0002 Drawing AE102.pdf
36C10F19R0086 0002 Drawing AE501.pdf
36C10F19R0086 0002 Drawings PP001.pdf
36C10F19R0086 0002 Drawing GI501.pdf
36C10F19R0086 0002 Drawing AF601.pdf
36C10F19R0086 0002 Drawing AE601.pdf
36C10F19R0086 0002 Drawing AE201.pdf
36C10F19R0086 0002 Drawing AD104.pdf
36C10F19R0086 0002 Safety Dev Testing Manual Pages 1-20.pdf
36C10F19R0086 0002 Safety Dev Testing Manual Pages 21-40.pdf
36C10F19R0086 0002 Safety Dev Testing Manual Pages 41-60.pdf
36C10F19R0086 0002 Safety Dev Testing Manual Pages 61-80.pdf
36C10F19R0086 0002 Safety Dev Testing Manual Pages 81-100.pdf
36C10F19R0086 0002 Safety Dev Testing Manual Pages 101-111.pdf
36C10F19R0086 0002 Spec Section 00 01 10.pdf
36C10F19R0086 0002 Spec Section 00 01 15.pdf
36C10F19R0086 0002 Spec Section 07 11 13.pdf
36C10F19R0086 0002 Spec Section 07 13 52.pdf
36C10F19R0086 0002 Spec Section 10 51 13.pdf
36C10F19R0086 0002 Amendment #2 AE comments on Specs and Drawing changes.pdf
36C10F19R0086 0003 36C10F19R0086 0003.docx
36C10F19R0086 0003 AD104.pdf
36C10F19R0086 0003 AE101.pdf
36C10F19R0086 0003 MS102A.pdf
36C10F19R0086 0003 AS100.pdf
36C10F19R0086 0003 AF101.pdf
36C10F19R0086 0003 AE601.pdf
36C10F19R0086 0003 AE201.pdf
36C10F19R0086 0003 PP001.pdf
36C10F19R0086 0003 GI501.pdf
36C10F19R0086 0003 AF601.pdf
36C10F19R0086 0003 AE501.pdf
36C10F19R0086 0003 AE102.pdf
36C10F19R0086 0004 36C10F19R0086 0004.docx
36C10F19R0086 0005 36C10F19R0086 0005.docx
36C10F19R0086 0006 36C10F19R0086 0006.docx
36C10F19R0086 0006 Amendment #6 Revised Section D - Boiler Plant instructions.docx
36C10F19R0086 0006 Amendment 6 - Summary.pdf
36C10F19R0086 0006 Amendment 6 - Specifications.pdf
36C10F19R0086 0006 Amendment 6 - Drawings.pdf
36C10F19R0086 0007 36C10F19R0086 0007.docx
36C10F19R0086 0007 Amendment 7.pdf
36C10F19R0086 0007 clarification on AE601 and AE603.pdf
36C10F19R0086 JOFOC Redacted.pdf
36C10F19R0086 Construction Wage Rate Requirements.pdf
36C10F19R0086 PP Questionnaire.pdf
36C10F19R0086 01 General Drawings_Part1.pdf
36C10F19R0086 02 Hazardous Drawings.pdf
36C10F19R0086 01 General Drawings_Part2.pdf
36C10F19R0086 03 Civil Drawings_Part1.pdf
36C10F19R0086 03 Civil Drawings_Part2.pdf
36C10F19R0086 04 Structural Drawings.pdf
36C10F19R0086 05 Architectural Drawings Part 1_Part1.pdf
36C10F19R0086 05 Architectural Drawings Part 1_Part2.pdf
36C10F19R0086 05 Architectural Drawings Part 1_Part3.pdf
36C10F19R0086 05 Architectural Drawings Part 2_Part1.pdf
36C10F19R0086 05 Architectural Drawings Part 2_Part2.pdf
36C10F19R0086 05 Architectural Drawings Part 2_Part3.pdf
36C10F19R0086 06 Interiors Drawings.pdf
36C10F19R0086 07 Equipment Drawings.pdf
36C10F19R0086 08 Fire Alarm Drawings.pdf
36C10F19R0086 09 Fire Protection Drawings.pdf
36C10F19R0086 10 Plumbing Drawings_Part1.pdf
36C10F19R0086 10 Plumbing Drawings_Part2.pdf
36C10F19R0086 11 Mechanical Drawings Part 1_Part1.pdf
36C10F19R0086 11 Mechanical Drawings Part 1_Part2.pdf
36C10F19R0086 11 Mechanical Drawings Part 1_Part3.pdf
36C10F19R0086 11 Mechanical Drawings Part 2_Part1.pdf
36C10F19R0086 11 Mechanical Drawings Part 2_Part2.pdf
36C10F19R0086 11 Mechanical Drawings Part 2_Part3.pdf
36C10F19R0086 12 Electrical Drawings Part 1_Part1.pdf
36C10F19R0086 12 Electrical Drawings Part 1_Part2.pdf
36C10F19R0086 12 Electrical Drawings Part 2_Part1 02.pdf
36C10F19R0086 12 Electrical Drawings Part 2_Part2.pdf
36C10F19R0086 Alexandria Boiler Plant Final Bid Documents Submission Combined Specifications 191211.pdf
36C10F19R0086 Construction Wage Rate Requirement.pdf
36C10F19R0086 0001 36C10F19R0086 0001.docx
36C10F19R0086 0001 Pre-proposal Conference Sign In Sheet.pdf
36C10F19R0086 0001 SF501 Structural Drawing.pdf
36C10F19R0086 0001 PreProposal Conf Slides.ppt
36C10F19R0086 0002 36C10F19R0086 0002.docx
36C10F19R0086 0002 Alexandria Boiler Plant Amendment #2 All RFI Responses 2-3-20.pdf
36C10F19R0086 0002 1020(4_12)F- Tax Exempt Certificate.pdf
36C10F19R0086 0002 RFI 5 Marble Partition.jpg
36C10F19R0086 0002 RFI 5 Marble Partition_4.jpg
36C10F19R0086 0002 RFI 5 Marble Partition_2.jpg
36C10F19R0086 0002 RFI 5 Marble Partition_3.jpg
36C10F19R0086 0002 VA10091- Vendorization Form.pdf
36C10F19R0086 0002 RFI #91 Insurance Liability.pdf
36C10F19R0086 0002 RFI 19 Portable 1000hp Boiler Nameplate.jpg
36C10F19R0086 0002 RFI 19 Portable 1000hp Boiler Nameplate 2.jpg
36C10F19R0086 0002 RFI 90.6 Boiler #1.jpg
36C10F19R0086 0002 RFI 90.6 Boiler #1 Nameplate.jpg
36C10F19R0086 0002 RFI 90.6 Boiler #2 Nameplate.jpg
36C10F19R0086 0002 RFI 90.6 Boiler #2_1.jpg
36C10F19R0086 0002 RFI 90.6 Boiler #2_2.jpg
36C10F19R0086 0002 RFI 90.6 Boiler #2.jpg
36C10F19R0086 0002 RFI 90.6 Boiler #3.jpg
36C10F19R0086 0002 RFI 90.6 Boiler #3_1.jpg
36C10F19R0086 0002 RFI 90.6 Boiler #3_2.jpg
36C10F19R0086 0002 RFI 90.6 Boiler #3_3.jpg
36C10F19R0086 0002 RFI 90.6 DA Tank.jpg
36C10F19R0086 0002 RFI 90.6 DA Tank_1.jpg
36C10F19R0086 0002 RFI 90.6 Makeup Water Tank.jpg
36C10F19R0086 0002 RFI 90.6 Boiler #3 Nameplate.jpg
36C10F19R0086 0002 Drawing AE101.pdf
36C10F19R0086 0002 Drawing MS102A.pdf
36C10F19R0086 0002 Drawing AS100.pdf
36C10F19R0086 0002 Drawing AF101.pdf
36C10F19R0086 0002 Drawing AE102.pdf
36C10F19R0086 0002 Drawing AE501.pdf
36C10F19R0086 0002 Drawings PP001.pdf
36C10F19R0086 0002 Drawing GI501.pdf
36C10F19R0086 0002 Drawing AF601.pdf
36C10F19R0086 0002 Drawing AE601.pdf
36C10F19R0086 0002 Drawing AE201.pdf
36C10F19R0086 0002 Drawing AD104.pdf
36C10F19R0086 0002 Safety Dev Testing Manual Pages 1-20.pdf
36C10F19R0086 0002 Safety Dev Testing Manual Pages 21-40.pdf
36C10F19R0086 0002 Safety Dev Testing Manual Pages 41-60.pdf
36C10F19R0086 0002 Safety Dev Testing Manual Pages 61-80.pdf
36C10F19R0086 0002 Safety Dev Testing Manual Pages 81-100.pdf
36C10F19R0086 0002 Safety Dev Testing Manual Pages 101-111.pdf
36C10F19R0086 0002 Spec Section 00 01 10.pdf
36C10F19R0086 0002 Spec Section 00 01 15.pdf
36C10F19R0086 0002 Spec Section 07 11 13.pdf
36C10F19R0086 0002 Spec Section 07 13 52.pdf
36C10F19R0086 0002 Spec Section 10 51 13.pdf
36C10F19R0086 0002 Amendment #2 AE comments on Specs and Drawing changes.pdf
36C10F19R0086 0003 36C10F19R0086 0003.docx
36C10F19R0086 0003 AD104.pdf
36C10F19R0086 0003 AE101.pdf
36C10F19R0086 0003 MS102A.pdf
36C10F19R0086 0003 AS100.pdf
36C10F19R0086 0003 AF101.pdf
36C10F19R0086 0003 AE601.pdf
36C10F19R0086 0003 AE201.pdf
36C10F19R0086 0003 PP001.pdf
36C10F19R0086 0003 GI501.pdf
36C10F19R0086 0003 AF601.pdf
36C10F19R0086 0003 AE501.pdf
36C10F19R0086 0003 AE102.pdf
36C10F19R0086 0004 36C10F19R0086 0004.docx
36C10F19R0086 0005 36C10F19R0086 0005.docx
36C10F19R0086 0006 36C10F19R0086 0006.docx
36C10F19R0086 0006 Amendment #6 Revised Section D - Boiler Plant instructions.docx
36C10F19R0086 0006 Amendment 6 - Summary.pdf
36C10F19R0086 0006 Amendment 6 - Specifications.pdf
36C10F19R0086 0006 Amendment 6 - Drawings.pdf
36C10F19R0086 0007 36C10F19R0086 0007.docx
36C10F19R0086 0007 Amendment 7.pdf
36C10F19R0086 0007 clarification on AE601 and AE603.pdf
Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Signs of Shaping
97% of similar contracts within the VA Headquarters had a set-aside.
On 1/8/20 VA Office of Construction and Facilities Management issued Solicitation 36C10F19R0086 for Replace Boiler Plant and Steam Distribution System due 4/27/20.
The opportunity was issued full & open with NAICS 236220 and PSC Y.
Primary Contact
Name
Susan Lam
Contract Specialist
202-461-8972   Profile
Phone
None
Documents
Posted documents for Solicitation 36C10F19R0086
Question & Answer
The AI Q&A Assistant has moved to the bottom right of the page
Opportunity Lifecycle
Procurement notices related to Solicitation 36C10F19R0086
Award Notifications
Agency published notification of awards for Solicitation 36C10F19R0086
Contract Awards
Prime contracts awarded through Solicitation 36C10F19R0086
Incumbent or Similar Awards
Potential Bidders and Partners
Awardees that have won contracts similar to Solicitation 36C10F19R0086
Similar Active Opportunities
Open contract opportunities similar to Solicitation 36C10F19R0086
Additional Details
Source Agency Hierarchy
VETERANS AFFAIRS, DEPARTMENT OF > VETERANS AFFAIRS, DEPARTMENT OF > OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)
FPDS Organization Code
3600-0010F
Source Organization Code
100167092
Last Updated
May 12, 2020
Last Updated By
PI33_DR_IAE_51681
Archive Date
May 12, 2020