Search Contract Opportunities

Ngwsp Intake & River Pumping Plant   4

ID: 140R4025R0023 • Type: Sources Sought • Match:  85%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading

Description

NGWSP INTAKE & RIVER PUMPING PLANT
Background
The U.S. Bureau of Reclamation, Upper Colorado Basin (UCB) Region, Four Corners Construction Office (FCCO) is issuing a Sources Sought notice to identify small business sources for the Navajo-Gallup Water Supply Project (NGWSP) Intake & River Pumping Plant.

This major infrastructure project aims to provide a reliable municipal and industrial water supply from the San Juan River to various regions including the eastern section of the Navajo Nation and the city of Gallup, New Mexico. The project involves extensive construction efforts and is intended to assess the capabilities of small businesses for potential future solicitations.

Work Details
The contract involves the construction of the Intake & River Pumping Plant for the NGWSP, which includes:

- Sitework such as cement-bentonite cutoff wall;
- Steel manifold piping with connections to existing ductile iron line pipe;
- Metal building system and foundations;
- Cast-in-place concrete building structures;
- Installation of vertical turbine pumping units;
- Air chambers;
- Electrical systems;
- SCADA systems;
- Water quality monitoring equipment;
- Selective site demolition;
- Demolition of an existing pumping plant;
- Modifications to existing channels including replacement of trash rake and sluice gate at intake, installation of gates, construction of fish barrier weir and return channel, and concrete modifications.

Period of Performance
The specific period of performance is not detailed in the solicitation.

Place of Performance
The work will be performed at the River Pumping Plant on the San Juan River, approximately 11 miles west of Farmington, NM in San Juan County.

Overview

Response Deadline
Dec. 19, 2025, 3:00 p.m. EST Past Due
Posted
June 10, 2025, 1:56 p.m. EDT
Set Aside
None
Place of Performance
NM USA
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Low
Est. Value Range
$50,000,000 - $80,000,000 (value based on agency estimated range)
Odds of Award
67%
On 6/10/25 USBR Upper Colorado Basin Region, Salt Lake City, UT issued Sources Sought 140R4025R0023 for Ngwsp Intake & River Pumping Plant due 12/19/25. The opportunity was issued full & open with NAICS 237110 and PSC Y1NE.
Primary Contact
Name
Loveless, Amy   Profile
Phone
(801) 524-3790

Additional Contacts in Documents

Title Name Email Phone
Contracting Officer Ashton Jones Profile ajones@usbr.gov None

Documents

Posted documents for Sources Sought 140R4025R0023

Opportunity Assistant


AI Analysis

AI Generate

Opportunity Lifecycle

Procurement notices related to Sources Sought 140R4025R0023

Award Notifications

Agency published notification of awards for Sources Sought 140R4025R0023

Contract Awards

Prime contracts awarded through Sources Sought 140R4025R0023

Incumbent or Similar Awards

Contracts Similar to Sources Sought 140R4025R0023

Potential Bidders and Partners

Awardees that have won contracts similar to Sources Sought 140R4025R0023

Similar Active Opportunities

Open contract opportunities similar to Sources Sought 140R4025R0023

Experts for Ngwsp Intake & River Pumping Plant

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
INTERIOR, DEPARTMENT OF THE > BUREAU OF RECLAMATION > UPPER COLORADO REGIONAL OFFICE
FPDS Organization Code
1425-00040
Source Organization Code
100163591
Last Updated
Jan. 3, 2026
Last Updated By
fbms_acq@ios.doi.gov
Archive Date
Jan. 3, 2026