Search Contract Opportunities

Ngwsp Intake & River Pumping Plant   4

ID: 140R4025R0023 • Type: Presolicitation • Match:  95%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Loading

Description

Posted: Aug. 27, 2025, 9:29 a.m. EDT
NGWSP INTAKE & RIVER PUMPING PLANT - This amendment to the pre-solicitation notice (synopsis) is to add 5 new attachments to replace DRAFT 140R4025R0023 Attachment 2. Some contractors have stated that the document won't open. These 5 new attachments are the same drawings, just split up into 5 smaller PDFs.
Posted: Aug. 22, 2025, 9:56 a.m. EDT
Background
The U.S. Bureau of Reclamation, Upper Colorado Basin Region, Four Corners Construction Office (FCCO) is issuing this pre-solicitation notice for the Navajo-Gallup Water Supply Project (NGWSP) Intake & River Pumping Plant.

This project aims to provide a reliable municipal and industrial water supply from the San Juan River to various regions including the eastern section of the Navajo Nation, southwestern portion of the Jicarilla Apache Nation, and the city of Gallup, New Mexico.

The project is being procured with full-and-open competition due to insufficient qualified small businesses with bonding capacity to act as prime contractors.

Work Details
The principal components of work for the Intake & River Pumping Plant include:

A. Construct New River Pumping Plant:
1. Sitework, including cement-bentonite cutoff wall.
2. Steel manifold piping, including connection to existing ductile iron line pipe.
3. Metal building system and foundations.
4. Cast-in-place concrete building structures.
5. Vertical turbine pumping units.
6. Air chambers.
7. Electrical system.
8. SCADA system.
9. Water quality monitoring equipment.

B. Selective site demolition.
C. Demolition of Existing Pumping Plant.
D. Existing channel modifications:
1. Replace trash rake and sluice gate at intake.
2. Install gates.
3. Construct fish barrier weir and return channel.
4. Concrete modifications.

Period of Performance
The period of performance will be defined in the solicitation document.

Place of Performance
The work will be performed at the River Pumping Plant on the San Juan River approximately 11 miles west of Farmington, NM in San Juan County.

Overview

Response Deadline
Dec. 19, 2025, 3:00 p.m. EST Past Due
Posted
Aug. 22, 2025, 9:56 a.m. EDT (updated: Aug. 27, 2025, 9:29 a.m. EDT)
Set Aside
None
Place of Performance
NM USA
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Evaluation Criteria
Best Value
Est. Level of Competition
Average
Est. Value Range
Experimental
$50,000,000 - $120,000,000 (AI estimate)
Odds of Award
85%
On 8/22/25 USBR Upper Colorado Basin Region, Salt Lake City, UT issued Presolicitation 140R4025R0023 for Ngwsp Intake & River Pumping Plant due 12/19/25. The opportunity was issued full & open with NAICS 237110 and PSC Y1NE.
Primary Contact
Name
Loveless, Amy   Profile
Phone
(801) 524-3790

Additional Contacts in Documents

Title Name Email Phone
Contracting Officer Ashton Jones Profile ajones@usbr.gov None

Documents

Posted documents for Presolicitation 140R4025R0023

Opportunity Assistant


AI Analysis

Opportunity Lifecycle

Procurement notices related to Presolicitation 140R4025R0023

Award Notifications

Agency published notification of awards for Presolicitation 140R4025R0023

Contract Awards

Prime contracts awarded through Presolicitation 140R4025R0023

Incumbent or Similar Awards

Contracts Similar to Presolicitation 140R4025R0023

Potential Bidders and Partners

Awardees that have won contracts similar to Presolicitation 140R4025R0023

Similar Active Opportunities

Open contract opportunities similar to Presolicitation 140R4025R0023

Experts for Ngwsp Intake & River Pumping Plant

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
INTERIOR, DEPARTMENT OF THE > BUREAU OF RECLAMATION > UPPER COLORADO REGIONAL OFFICE
FPDS Organization Code
1425-00040
Source Organization Code
100163591
Last Updated
Aug. 27, 2025
Last Updated By
fbms_acq@ios.doi.gov
Archive Date
Aug. 31, 2026