Search Contract Opportunities

NGWSP Intake & River Pumping Plant   4

ID: 140R4025R0023 • Type: Solicitation • Match:  90%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading

Description

NGWSP INTAKE & RIVER PUMPING PLANT
Background
The Bureau of Reclamation, Upper Colorado Region, is issuing this solicitation for the construction of the NGWSP Intake & River Pumping Plant. The goal of this contract is to enhance water supply facilities by constructing a new pumping plant and modifying existing infrastructure to improve efficiency and reliability in water management.

Work Details
The principal components of work for the Intake & River Pumping Plant include:

A. Construct New River Pumping Plant:
1. Sitework, including cement-bentonite cutoff wall.
2. Steel manifold piping, including connection to existing ductile iron line pipe.
3. Metal building system and foundations.
4. Cast-in-place concrete building structures.
5. Vertical turbine pumping units.
6. Air chambers.
7. Electrical system.
8. SCADA system (Supervisory Control and Data Acquisition).
9. Water quality monitoring equipment.

B. Selective site demolition.

C. Demolition of Existing Pumping Plant are also required tasks.

Additionally, existing channel modifications include:
1. Replace trash rake and sluice gate at intake,
2. Install gates,
3. Construct fish barrier weir and return channel,
4. Concrete modifications.

Period of Performance
The contract performance period is from March 20, 2026, to October 6, 2028.

Place of Performance
The construction projects will be performed at the River Pumping Plant on the San Juan River, approximately 11 miles west of Farmington, NM in San Juan County.

Overview

Response Deadline
Jan. 16, 2026, 3:00 p.m. EST (original: Dec. 19, 2025, 3:00 p.m. EST) Past Due
Posted
Sept. 24, 2025, 9:25 a.m. EDT (updated: Jan. 12, 2026, 8:00 p.m. EST)
Set Aside
None
Place of Performance
NM USA
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Est. Value Range
Experimental
$50,000,000 - $200,000,000 (AI estimate)
On 9/24/25 USBR Upper Colorado Basin Region, Salt Lake City, UT issued Solicitation 140R4025R0023 for NGWSP Intake & River Pumping Plant due 1/16/26. The opportunity was issued full & open with NAICS 237110 and PSC Y1NE.
Primary Contact
Name
Loveless, Amy   Profile
Phone
(801) 524-3790

Additional Contacts in Documents

Title Name Email Phone
None Tim Gonzales Profile tjgonzales@usbr.gov None

Documents

Posted documents for Solicitation 140R4025R0023

Opportunity Assistant


AI Analysis

AI Generate

Opportunity Lifecycle

Procurement notices related to Solicitation 140R4025R0023

Award Notifications

Agency published notification of awards for Solicitation 140R4025R0023

Contract Awards

Prime contracts awarded through Solicitation 140R4025R0023

Incumbent or Similar Awards

Contracts Similar to Solicitation 140R4025R0023

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation 140R4025R0023

Similar Active Opportunities

Open contract opportunities similar to Solicitation 140R4025R0023

Experts for NGWSP Intake & River Pumping Plant

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
INTERIOR, DEPARTMENT OF THE > BUREAU OF RECLAMATION > UPPER COLORADO REGIONAL OFFICE
FPDS Organization Code
1425-00040
Source Organization Code
100163591
Last Updated
Jan. 12, 2026
Last Updated By
fbms_acq@ios.doi.gov
Archive Date
Dec. 31, 2026