Search Contract Opportunities

Ngwsp Block 2-3 Hdd   3

ID: 140R4026R0002 • Type: Presolicitation • Match:  90%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Loading

Description

Posted: Oct. 31, 2025, 3:35 p.m. EDT
NGWSP BLOCK 2-3 HDD - For all draft solicitation documents, see pre-solicitation notice posted under 140R4025R0027. This solicitation (and the estimated date for the site visit) have been delayed.
Posted: Oct. 6, 2025, 10:58 a.m. EDT
Background
The U.S. Bureau of Reclamation, Upper Colorado Basin Region, Four Corners Construction Office (FCCO) is issuing a pre-solicitation notice for the Navajo-Gallup Water Supply Project (NGWSP) Block 2-3 Horizontal Directional Drilling (HDD). This project aims to provide a reliable municipal and industrial water supply from the San Juan River to various regions including the eastern section of the Navajo Nation and the city of Gallup, New Mexico.

Work Details
The principal components of work for the Block 2-3 HDD include:

1. HDD for a 42-inch buried water transmission pipeline crossing at Reach 2 Nenahnezad Bluff with an approximate bore length of 3,295 feet.

2. HDD for 36-inch buried water transmission pipeline crossings at:
- Reach 2 Shumway Arroyo: approximately 2,000-foot bore length.
- Reach 2 San Juan River: approximately 2,400-foot bore length.
- Reach 3 Chaco River: approximately 2,080-foot bore length.

Period of Performance
The contract is anticipated to be performed over a timeframe that aligns with fiscal year 2026.

Place of Performance
The work is located on the Block 2-3 pipeline alignment, starting south of the Frank Chee Willetto Reservoir approximately 17 miles east of Shiprock, New Mexico and terminating at the San Juan Lateral Water Treatment Plant approximately 6 miles east of the intersection of U.S. Highway 491 and Navajo Route 36 in San Juan County.

Overview

Response Deadline
Jan. 28, 2026, 3:00 p.m. EST Past Due
Posted
Oct. 6, 2025, 10:58 a.m. EDT (updated: Oct. 31, 2025, 3:35 p.m. EDT)
Set Aside
None
Place of Performance
NM USA
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Evaluation Criteria
Best Value
Est. Level of Competition
Average
Est. Value Range
$30,000,000 - $60,000,000 (value based on agency estimated range)
Odds of Award
85%
On 10/6/25 USBR Upper Colorado Basin Region, Salt Lake City, UT issued Presolicitation 140R4026R0002 for Ngwsp Block 2-3 Hdd due 1/28/26. The opportunity was issued full & open with NAICS 237110 and PSC Y1NE.
Primary Contact
Name
Loveless, Amy   Profile
Phone
(801) 524-3790

Additional Contacts in Documents

Title Name Email Phone
Contracting Officer Ashton Jones Profile ajones@usbr.gov None

Documents

Posted documents for Presolicitation 140R4026R0002

Opportunity Assistant


AI Analysis

Opportunity Lifecycle

Procurement notices related to Presolicitation 140R4026R0002

Award Notifications

Agency published notification of awards for Presolicitation 140R4026R0002

Contract Awards

Prime contracts awarded through Presolicitation 140R4026R0002

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Presolicitation 140R4026R0002

Similar Active Opportunities

Open contract opportunities similar to Presolicitation 140R4026R0002

Experts for Ngwsp Block 2-3 Hdd

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
INTERIOR, DEPARTMENT OF THE > BUREAU OF RECLAMATION > UPPER COLORADO REGIONAL OFFICE
FPDS Organization Code
1425-00040
Source Organization Code
100163591
Last Updated
Oct. 31, 2025
Last Updated By
fbms_acq@ios.doi.gov
Archive Date
Dec. 31, 2026