Search Contract Opportunities

NGWSP Block 2-3 HDD   3

ID: 140R4026R0002 • Type: Solicitation • Match:  95%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading

Description

NGWSP BLOCK 2-3 HDD
Background
The Bureau of Reclamation, part of the Upper Colorado Region, is issuing this solicitation for the construction of water supply facilities through Horizontal Directional Drilling (HDD). The goal of this contract is to install a buried water transmission pipeline as part of the NGWSP Block 2-3 project, which aims to enhance water delivery systems in the region.

Work Details
The principal components of work for Block 2-3 Horizontal Directional Drilling (HDD) include:

1. HDD for a 42-inch buried water transmission pipeline crossing at Reach 2 Nenahnezad Bluff with an approximate bore length of 3,295 feet.

2. HDD for a 36-inch buried water transmission pipeline crossing including:
a. Reach 2 Shumway Arroyo with an approximate bore length of 2,000 feet;
b. Reach 2 San Juan River with an approximate bore length of 2,400 feet;
c. Reach 3 Chaco River with an approximate bore length of 2,080 feet.

The work will be performed along the Block 2-3 pipeline alignment starting south of the Frank Chee Willetto Reservoir approximately 17 miles east of Shiprock, New Mexico and terminating at the San Juan Lateral Water Treatment Plant approximately 6 miles east of the intersection of U.S. Highway 491 and Navajo Route 36 in San Juan County. The contractor must ensure turnkey pipe installation using HDD, which includes all necessary items, equipment, materials, personnel (including specialized personnel), and must provide full-time safety and quality control representatives as well as qualified survey personnel.

Period of Performance
The contract performance period is from May 20, 2026 to September 21, 2027.

Place of Performance
The construction projects will be performed along the Block 2-3 pipeline alignment in San Juan County, New Mexico.

Overview

Response Deadline
Feb. 25, 2026, 3:00 p.m. EST Past Due
Posted
Nov. 17, 2025, 9:35 a.m. EST (updated: Feb. 3, 2026, 4:10 p.m. EST)
Set Aside
None
Place of Performance
NM USA
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Est. Value Range
Experimental
$25,000,000 - $60,000,000 (AI estimate)
On 11/17/25 USBR Upper Colorado Basin Region, Salt Lake City, UT issued Solicitation 140R4026R0002 for NGWSP Block 2-3 HDD due 2/25/26. The opportunity was issued full & open with NAICS 237110 and PSC Y1NE.
Primary Contact
Name
Loveless, Amy   Profile
Phone
(801) 524-3790

Documents

Posted documents for Solicitation 140R4026R0002

Opportunity Assistant


AI Analysis

AI Generate

Opportunity Lifecycle

Procurement notices related to Solicitation 140R4026R0002

Award Notifications

Agency published notification of awards for Solicitation 140R4026R0002

Contract Awards

Prime contracts awarded through Solicitation 140R4026R0002

Incumbent or Similar Awards

Contracts Similar to Solicitation 140R4026R0002

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation 140R4026R0002

Similar Active Opportunities

Open contract opportunities similar to Solicitation 140R4026R0002

Experts for NGWSP Block 2-3 HDD

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
INTERIOR, DEPARTMENT OF THE > BUREAU OF RECLAMATION > UPPER COLORADO REGIONAL OFFICE
FPDS Organization Code
1425-00040
Source Organization Code
100163591
Last Updated
Feb. 3, 2026
Last Updated By
fbms_acq@ios.doi.gov
Archive Date
Dec. 31, 2026