Grand Coulee Dam Left and Right Powerplants G1-G18 Penstock Lining Rehabilitati   4

ID: 140R1020R0013 • Type: Sources Sought
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Draft a sources sought response template for this opportunity
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

Sources Sought Grand Coulee Dam Left & Right Powerplants G1-G18 Penstock Lining Rehabilitation 1.01 SYNOPSIS A. Work is located at Grand Coulee Dam, adjacent to the cities of Grand Coulee and Coulee Dam in Grant and Okanogan Counties, approximately 90 miles west of Spokane, Washington. B. The Bureau of Reclamation (Reclamation) is conducting market research for the Grand Coulee Dam left and right powerplant G1-G18 penstock lining rehabilitation, Columbia Basin Project. The Grand Coulee left and right powerplant contains 18 main generators. Grand Coulee Dam is operated by Reclamation as a multi-purpose reservoir to provide recreation, power generation, and flood control to meet irrigation needs. Reservoir discharges through the penstocks and powerplant will be halted for the specified outage window. This requirement has an order of magnitude between $10,000,000 and $20,000,000. C. The Principle Components of work to be performed includes the following: Penstock Lining Repairs and Replacement: a) Minimum of Spot and Zone lining repairs of the following Units penstock interiors. The Government will inspect the following penstock interiors within 7 calendar days after the start of the respective penstocks outage. The Government reserves the right to exercise the option CLIN pertaining to the respective penstock within 14 calendar days after the start of the respective penstocks outage. 1. G1 2. G2 3. G3 4. G5 5. G6 6. G7 7. G8 8. G9 9. G11 10. G12 11. G16 b) Complete lining removal and re-lining of the penstock interiors for Units: 1. G4 2. G10 3. G13 4. G14 5. G15 6. G17 7. G18 c) Removal and re-installation of the surface-mounted flowmeters and associated conduits to facilitate access to the penstock surface in Units: 1. G2 2. G8 if full re-lining is implemented 3. G9 4. G12 D. The intent of this notice is to identify potential interested offerors for the Grand Coulee Dam left and right powerplant G1-G18 penstock lining rehabilitation, Columbia Basin Project. Reclamation is seeking qualified, experienced firm capable of providing the labor, equipment, and materials necessary to accomplish the Principle Components of Work identified above and as identified within the project specifications and drawings (drawings not included herein and must be requested). Interested offerors are invited to submit the following information: 1. Statement of interest as a prime and/or subcontractor 2. Construction bonding level, aggregate and per contract 3. Point of contact information 4. Size status and/or SBA certification program for NAICS 237990 5. Firms capability to successfully manage complex requirements 6. Recent projects similar in size and scope E. Responses to this Sources Sought are due No Later Than (NLT) 1:00pm MDT, Thursday 2nd April 2020. All responses are to be sent to lfleming@usbr.gov. F. This market research is for informational purposes only. This announcement does not constitute a commitment, implied or otherwise, that a procurement action will be issued, and shall not be construed as a Request for Proposal or Invitation for Bid, or as an obligation on the part of the Government. No entitlement to payment will arise as a result of the submission of contractor information. G. Any questions regarding this announcement should be sent to lfleming@usbr.gov. Phone calls will not be accepted.

Overview

Response Deadline
April 2, 2020, 12:00 a.m. EDT Past Due
Posted
March 17, 2020, 5:19 p.m. EDT
Set Aside
None
Place of Performance
Not Provided
Source
SAM

Current SBA Size Standard
$45 Million
Est. Level of Competition
Low
Odds of Award
78%
On 3/17/20 USBR Columbia-Pacific Northwest Region, Boise, ID issued Sources Sought 140R1020R0013 for Grand Coulee Dam Left and Right Powerplants G1-G18 Penstock Lining Rehabilitati due 4/2/20. The opportunity was issued full & open with NAICS 237990 and PSC Y.
Primary Contact
Name
Lance Fleming   Profile
Phone
None

Documents

Posted documents for Sources Sought 140R1020R0013

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Sources Sought 140R1020R0013

Award Notifications

Agency published notification of awards for Sources Sought 140R1020R0013

Contract Awards

Prime contracts awarded through Sources Sought 140R1020R0013

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Sources Sought 140R1020R0013

Similar Active Opportunities

Open contract opportunities similar to Sources Sought 140R1020R0013

Additional Details

Source Agency Hierarchy
INTERIOR, DEPARTMENT OF THE > BUREAU OF RECLAMATION > PACIFIC NW REGION PN 6615
FPDS Organization Code
1425-00010
Source Organization Code
100173200
Last Updated
April 9, 2020
Last Updated By
PI33_DR_IAE_51681
Archive Date
April 9, 2020