WY FLAP NAT 505 & BL 6409(1) Casper Mtn Cir Dr & Muddy Mtn Rd   4

ID: 6982AF23B000021 • Type: Solicitation
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

PROJECT NUMBER: WY FLAP NAT 505 & BL 6409(1)

PROJECT NAME: Casper Mtn Cir Dr & Muddy Mtn Rd

PROJECT DESCRIPTION:

Minor widening/reconstruction and resurfacing, restoration, and rehabilitation (3R) project in Natrona County, Wyoming (approximately 8 miles south of Casper, Wyoming). The proposed project is 12 miles long, generally extending from the intersection of Casper Mountain Circle Drive and Hogadon Road to South Circle Drive, and then continues along Muddy Mountain Road and ends at the Bureau of Land Management (BLM) Campground Loop. The route is used primarily as residential and recreational access to Muddy Mountain and is on rolling terrain with survey elevations ranging from 7,425 feet to 8,292 feet.

Proposed improvements include one base schedule and 2 options:

  • Schedule A: BLM Muddy Mountain Road improvements
  • Option X: County Casper Mountain Circle Drive improvements (S-Curve and new pavement portion)
  • Option Y: County Casper Mountain Circle Drive improvements (Full Depth Reclamation [FDR])

SCOPE OF THE WORK:

Both the Schedule and Options require coordination with the County and BLM during construction activities. Casper Mountain Circle Drive provides access to many private residences and Muddy Mountain Road provides access to campgrounds.

Schedule A:

Muddy Mountain Road is approximately 7.49 miles in length and is aggregate surfaced. The project improvements will rehabilitate and resurface the 4.55 miles of two-lane road and 2.83 miles of single lane aggregate surfaced roads. There are two segments of Muddy Mountain Road consisting of steep grades where new pavement is proposed. There will be four new parking areas, with two of the areas modifying existing parking areas. Additionally, there is a snow fence that will be replaced.

Option X:

The Casper Mountain Circle Drive segment is 2.33 miles are aggregate surfaced with proposed new pavement. The new typical section will consist of 11-foot lanes and 1-foot shoulders. Additional improvements include curve widening of an S-curve area, reconditioning ditches, adding culverts, and pavement markings and delineators.

Option Y:

Casper Mountain Circle Drive is approximately 2.65 miles of existing pavement is fatigued and nearing the end of its serviceable life with proposed FDR. Additional improvements include sub excavation, reconditioning ditches, adding culverts, and pavement markings and delineators.

Background
The project involves a minor widening/reconstruction and resurfacing, restoration, and rehabilitation (3R) project in Natrona County, Wyoming. The proposed project is 12 miles long, extending from the intersection of Casper Mountain Circle Drive and Hogadon Road to South Circle Drive, and then continues along Muddy Mountain Road and ends at the Bureau of Land Management (BLM) Campground Loop. The route is used primarily as residential and recreational access to Muddy Mountain.

Work Details
The proposed improvements include one base schedule and 2 options. Schedule A involves rehabilitating and resurfacing 4.55 miles of two-lane road and 2.83 miles of single lane aggregate surfaced roads on Muddy Mountain Road. It also includes adding new parking areas, replacing a snow fence, and modifying existing parking areas.
Option X involves improving a segment of Casper Mountain Circle Drive with new pavement, widening an S-curve area, reconditioning ditches, adding culverts, and pavement markings.
Option Y involves full-depth reclamation (FDR) of approximately 2.65 miles of existing pavement on Casper Mountain Circle Drive.

Place of Performance
The construction projects will be performed in Natrona County, Wyoming.

Overview

Response Deadline
Nov. 14, 2023, 4:00 p.m. EST Past Due
Posted
Oct. 11, 2023, 3:33 p.m. EDT (updated: Nov. 27, 2023, 3:51 p.m. EST)
Set Aside
None
Place of Performance
Casper, WY United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
On 10/11/23 Central Federal Lands Highway Division issued Solicitation 6982AF23B000021 for WY FLAP NAT 505 & BL 6409(1) Casper Mtn Cir Dr & Muddy Mtn Rd due 11/14/23. The opportunity was issued full & open with NAICS 237310 and PSC Y1LB.
Primary Contact
Name
Leslie Karsten   Profile
Phone
None

Documents

Posted documents for Solicitation 6982AF23B000021

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Solicitation 6982AF23B000021

Award Notifications

Agency published notification of awards for Solicitation 6982AF23B000021

Contract Awards

Prime contracts awarded through Solicitation 6982AF23B000021

Incumbent or Similar Awards

Contracts Similar to Solicitation 6982AF23B000021

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation 6982AF23B000021

Similar Active Opportunities

Open contract opportunities similar to Solicitation 6982AF23B000021

Additional Details

Source Agency Hierarchy
TRANSPORTATION, DEPARTMENT OF > FEDERAL HIGHWAY ADMINISTRATION > 6982AF CENTRAL FEDERAL LANDS DIVISI
FPDS Organization Code
6925-00068
Source Organization Code
100173515
Last Updated
Jan. 14, 2024
Last Updated By
leslie.karsten@dot.gov
Archive Date
Jan. 14, 2024