Search Contract Opportunities

WY BR WYAO US20(1) US 20 and Hayden Arch Bridge Repairs

ID: 6982AF27SS00001 • Type: Sources Sought • Match:  100%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Analyze Opportunity
Generate a Draft
Loading

Description

THIS IS NOT A REQUEST FOR BID PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.

THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service-disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs. Interested businesses must submit the following by e-mail to CFLContracts@dot.gov (Attn: Laura Slauter) for receipt by close of business (2 p.m. local Denver time) on November 04, 2026.

(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;

(2) A list of all confirmed socioeconomic categories (i.e., 8(a), small-disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business;

(3) A letter from a bonding agent stating your firm's capability to bond for a single project of $5 million, and your firm's aggregate bonding capacity; and

(4) Provide a list of road construction projects of equal or greater value and scope to the WY BR WYAO US20(1) US 20 and Hayden Arch Bridge Repairs project in which you performed reconstruction of the bridge approaches, minor drainage improvements, signing, and guardrail replacement. Bridge repairs include concrete spall, crack, delamination, and patch repairs in the bridge superstructure and deck. Installing a waterproofing membrane on the bridge deck and constructing a temporary debris shield underneath the bridge.

DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.

The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/

PROJECT DESCRIPTION: The Hayden Arch Bridge is located on Hayden Arch Road approximately 5 miles west of Cody, WY. The bridge spans the Shoshone River at approximately 5,060 feet above sea level and provides access for the Bureau of Reclamation (BOR) to the Buffalo Bill Dam Power Plant. The PS&E includes one (1) base schedule with no options.

SCOPE OF THE WORK: The project scope includes repairs of the Hayden Arch Bridge, reconstruction of the bridge approaches, minor drainage improvements, signing, and guardrail replacement. Bridge repairs include concrete spall, crack, delamination, and patch repairs in the bridge superstructure and deck. The scope also includes installing a waterproofing membrane on the bridge deck and constructing a temporary debris shield underneath the bridge. The bridge will be closed to public traffic for the duration of construction.

PRINCIPAL WORK ITEMS:

  • 15701-0000 Soil Erosion Control: LPSM
  • 30202-2000 Roadway Aggregate, Method 2: 310 TONS
  • 40301-0100 Asphalt Concrete Pavement, Type 1: 350 TONS
  • 55901-0000 Membrane Waterproofing: 445 SQYD
  • 56205-0000 Debris Shield: LPSM
  • 57201-0000 Repair Concrete (Deep): 38 SQYD
  • 57201-0000 Repair Concrete (Deep Bridge Deck): 80 SQYD
  • 57201-0000 Repair Concrete (Full Depth Bridge Deck): 80 SQYD
  • 60901-1000 Curb, Concrete, 12-Inch Depth: 520 LNFT
  • 61701-4500 Guardrail System Mgs, Type 2, Class A, Steel Posts: 263 LNFT

ANTICIPATED SCHEDULE:

  • Advertisement: January 2027
  • Award: March 2027
  • Notice to proceed: April 2027
  • Contract completion: October 2027
  • Total duration for construction: 120 days

ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000.

Overview

Response Deadline
Due in 13 Days
Posted
Set Aside
None
Place of Performance
Cody, WY 82414 United States
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Odds of Advancing to Solicitation
13%
On 10/21/26 Central Federal Lands Highway Division issued Sources Sought 6982AF27SS00001 for WY BR WYAO US20(1) US 20 and Hayden Arch Bridge Repairs due 11/4/26. The opportunity was issued full & open with NAICS 237310 and PSC Y1LB.
Primary Contact
Name
Laura Slauter   Profile
Phone
None

Secondary Contact

Name
Jorey Deml   Profile
Phone
None

Documents

Posted documents for Sources Sought 6982AF27SS00001

Opportunity Assistant


Analyze Opportunity

Generate a Draft

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Sources Sought 6982AF27SS00001

Similar Active Opportunities

Open contract opportunities similar to Sources Sought 6982AF27SS00001

Experts for WY BR WYAO US20(1) US 20 and Hayden Arch Bridge Repairs

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
TRANSPORTATION, DEPARTMENT OF > FEDERAL HIGHWAY ADMINISTRATION > 6982AF CENTRAL FEDERAL LANDS DIVISI
FPDS Organization Code
6925-00068
Source Organization Code
100173515
Last Updated
Last Updated By
laura.slauter@dot.gov
Archive Date