Wood River Sewer Separation Project (Construction)   3

ID: W912P923B0011 • Type: Solicitation
Question & Answer Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Does this contract have any security clearance requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

Posted: Nov. 17, 2023, 2:34 p.m. EST

Wood River Sewer Separation Project

Amendment 0002 and all related documents are available through the PIEE links.

Posted: Aug. 29, 2023, 2:40 p.m. EDT
Posted: Aug. 23, 2023, 11:27 a.m. EDT
Posted: Aug. 22, 2023, 1:56 p.m. EDT
Posted: Aug. 11, 2023, 3:25 p.m. EDT
Posted: Aug. 2, 2023, 3:19 p.m. EDT
Background
The Wood River Sewer Separation Project is a construction project aimed at separating combined sewers, constructing a new stormwater collection system, and expanding existing stormwater detention and pumping facilities. The work includes the construction of storm sewers, detention basins, and related work, covering approximately 20,900 lineal feet of 12” to 72” storm sewer, 710 lineal feet of precast box sewer, 533 lineal feet of large diameter jack-and-bore, 240 stormwater structures, and 24,000 cubic yards of detention pond excavation. The project also involves coordination with the City of Wood River, Illinois.

Work Details
The construction tasks include the separation of combined sewers, construction of a new stormwater collection system, expansion of existing stormwater detention and pumping facilities. The work encompasses various activities such as water and sanitary adjustments, tree removal, demolition, concrete and asphalt paving, sidewalks, fencing, and seeding. The project is estimated to have a magnitude of construction between $10M and $20M. The period of performance for the base contract is estimated at 48 months. Additionally, there are optional bid items for Phase 3 and Phase 4 listed under Option 1 and Option 2 headings.

Period of Performance
The base contract period is estimated at 48 months.

Place of Performance
The work will be conducted within an area roughly bounded by Picker Avenue, Edwardsville Road, Wood River Avenue, Ferguson Avenue, and Old St. Louis Road in the City of Wood River, Illinois.

Overview

Response Deadline
Sept. 5, 2023, 12:00 p.m. EDT (original: Sept. 2, 2023, 12:00 p.m. EDT) Past Due
Posted
Aug. 2, 2023, 3:19 p.m. EDT (updated: Nov. 17, 2023, 2:34 p.m. EST)
Set Aside
Small Business (SBA)
Place of Performance
Wood River, IL 62095 United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
On 8/2/23 USACE St. Louis District issued Solicitation W912P923B0011 for Wood River Sewer Separation Project (Construction) due 9/5/23. The opportunity was issued with a Small Business (SBA) set aside with NAICS 237110 (SBA Size Standard $45 Million) and PSC Y1ND.
Primary Contact
Name
LOGAN KOHRMANN   Profile
Phone
(314) 331-8384

Documents

Posted documents for Solicitation W912P923B0011

Question & Answer

Opportunity Lifecycle

Procurement notices related to Solicitation W912P923B0011

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W912P923B0011

Similar Active Opportunities

Open contract opportunities similar to Solicitation W912P923B0011

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > MVD > W07V ENDIST ST LOUIS
FPDS Organization Code
2100-W912P9
Source Organization Code
100221312
Last Updated
Nov. 17, 2023
Last Updated By
logan.r.kohrmann@usace.army.mil
Archive Date
Aug. 28, 2024