Search Contract Opportunities

West 388th/419th Fighter Wing Apron at Hill AFB   6

ID: W9123822R0008 • Type: Solicitation
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Does this contract have any security clearance requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

Posted: Sept. 30, 2022, 11:09 a.m. EDT

This is a design-build contract therefore the awarded contractor is required to perform design work prior to construction. The awarded contractor is responsible and liable for the complete design and shall not assume that the provided design criteria and drawings in this solicitation will alleviate him/her from performing any additional design as required to produce a complete set of construction documents.

Scope of Work: This Design Build project will remove and replace the West portion of the 388th/419th Fighter Wing F-35 Apron. The existing sunshade shelters located on the apron will also be removed and replaced. The majority of the pavement is identified in the latest Pavement Evaluation as A17B. The existing pavement is approximately 40 years old and has exceeded its design life. The existing panels are oversized and will be replaced with appropriately sized panels. The project will consist of removing the exiting 12 PCC and replacing with 15 PCC. The new pavement section will incorporate a stabilized drainage layer and new subbase course material. In addition to new PCC parking apron and ACC shoulders, the sunshades will be dismantled, recycled and new sunshades installed. Existing crew shacks will be removed and relocated. One additional crew shack will be provided so that each parking row will have a crew shack. As part of this project, the apron will be re-marked.

The project shall be designed and constructed within the criteria prescribed, as well as other codes and standards specified in the contract.

Posted: Aug. 1, 2022, 5:10 p.m. EDT
Posted: July 6, 2022, 9:38 p.m. EDT
Posted: July 6, 2022, 7:25 p.m. EDT
Posted: April 14, 2022, 6:33 p.m. EDT
Posted: April 7, 2022, 6:43 p.m. EDT
Posted: April 5, 2022, 6:29 p.m. EDT
Posted: March 18, 2022, 2:05 p.m. EDT
Posted: March 10, 2022, 7:18 p.m. EST
Posted: March 2, 2022, 9:23 p.m. EST
Posted: March 2, 2022, 5:42 p.m. EST
Posted: Dec. 29, 2021, 1:27 p.m. EST
Posted: Dec. 28, 2021, 6:44 p.m. EST
Posted: Dec. 15, 2021, 4:59 p.m. EST
Posted: Dec. 14, 2021, 2:58 p.m. EST
Posted: Dec. 10, 2021, 3:53 p.m. EST
Posted: Dec. 7, 2021, 5:22 p.m. EST
Posted: Dec. 6, 2021, 8:14 p.m. EST
Posted: Nov. 29, 2021, 1:32 p.m. EST
Background
This is a design-build contract for the West 388th/419th Fighter Wing Apron at Hill AFB. The awarded contractor is required to perform design work prior to construction. The project involves removing and replacing the West portion of the apron, including sunshade shelters, and replacing the existing pavement with new PCC and stabilized drainage layer. The project also includes re-marking the apron and relocating crew shacks.

Work Details
The scope of work includes removing and replacing the West portion of the 388th/419th Fighter Wing F-35 Apron, along with sunshade shelters. The project involves replacing approximately 700,000 SF of existing Portland Cement Concrete (PCC) slabs, reworking structural base materials for seasonal frost conditions, installing underdrain pipe, stormwater manhole structures, providing grounding points, and pavement markings on new apron pavement. Additionally, it includes demolition of existing apron PCC slabs and adjacent PCC drainage swale. The project also involves asbestos/LBP removal by a certified contractor. The work must conform to all current UFC standards.

Period of Performance
The period of performance for this contract is 730 days from the acceptance of work or beneficial occupancy by the government.

Place of Performance
The construction projects will be performed at Hill Air Force Base.

Overview

Response Deadline
Aug. 8, 2022, 4:00 p.m. EDT (original: Jan. 3, 2022, 10:00 a.m. EST) Past Due
Posted
Nov. 29, 2021, 1:32 p.m. EST (updated: Sept. 30, 2022, 11:09 a.m. EDT)
Set Aside
Small Business (SBA)
Place of Performance
Hill AFB, UT 84056 United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Fixed Price
Evaluation Criteria
Best Value
Signs of Shaping
70% of obligations for similar contracts within the Department of the Army were awarded full & open.
On 11/29/21 USACE Sacramento District issued Solicitation W9123822R0008 for West 388th/419th Fighter Wing Apron at Hill AFB due 8/8/22. The opportunity was issued with a Small Business (SBA) set aside with NAICS 236220 (SBA Size Standard $45 Million) and PSC Z2LA.
Primary Contact
Name
John Wysocki   Profile
Phone
None

Documents

Posted documents for Solicitation W9123822R0008

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Solicitation W9123822R0008

Award Notifications

Agency published notification of awards for Solicitation W9123822R0008

Contract Awards

Prime contracts awarded through Solicitation W9123822R0008

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W9123822R0008

Similar Active Opportunities

Open contract opportunities similar to Solicitation W9123822R0008

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SPD > US ARMY ENGINEER DISTRICT SACRAMENT
FPDS Organization Code
2100-W91238
Source Organization Code
100221301
Last Updated
Sept. 30, 2022
Last Updated By
jeremy.j.grimley@usace.army.mil
Archive Date
Aug. 23, 2022