Search Contract Opportunities

WD Mayo Alignment Cell

ID: W912BV25R0008 • Type: Solicitation • Match:  90%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading

Description

This is a Design-Build Request for Proposal (RFP) to design and construct a replacement guide wall extension cell at the W.D. Mayo Lock and Dam 14 which is part of the McClellan-Kerr Arkansas River Navigation System (MKARNS).
Background
The U.S. Army Corps of Engineers (USACE) is issuing this Design-Build Request for Proposal (RFP) for the design and construction of a replacement guide wall extension cell at the W.D. Mayo Lock and Dam 14, which is part of the McClellan-Kerr Arkansas River Navigation System (MKARNS).

The previous guide wall cell was demolished due to barge impact, necessitating its replacement to facilitate barge alignment with the lock and protect the dam from future impacts.

Work Details
The scope of work includes: conducting geotechnical investigations, designing the new guide wall extension cell, and performing marine construction tasks.

The project aims to ensure that the new structure meets all specifications for safety and functionality in alignment with navigation requirements. Proposals will be evaluated based on their adherence to these requirements and overall value.

Period of Performance
The contract will be performed over a specified period as outlined in the solicitation, which includes phases for design, construction, and final inspections.

Place of Performance
The construction projects will take place at the W.D. Mayo Lock and Dam 14, located within the McClellan-Kerr Arkansas River Navigation System.

Overview

Response Deadline
Oct. 13, 2025, 4:00 p.m. EDT (original: April 7, 2025, 4:00 p.m. EDT) Past Due
Posted
March 7, 2025, 3:31 p.m. EST (updated: Oct. 7, 2025, 1:05 p.m. EDT)
Set Aside
Small Business (SBA)
Place of Performance
W.D. Mayo Lock and Dam 14 Braggs, OK USA
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Evaluation Criteria
Best Value
Est. Level of Competition
Average
Est. Value Range
Experimental
$5,000,000 - $15,000,000 (AI estimate)
Signs of Shaping
78% of obligations for similar contracts within the Department of the Army were awarded full & open.
On 3/7/25 USACE Tulsa District issued Solicitation W912BV25R0008 for WD Mayo Alignment Cell due 10/13/25. The opportunity was issued with a Small Business (SBA) set aside with NAICS 237990 (SBA Size Standard $45 Million) and PSC Y1KB.
Primary Contact
Name
Tyler Hastings   Profile
Phone
None

Additional Contacts in Documents

Title Name Email Phone
None Kordel M. Tyler Profile kordel.m.tyler@usace.army.mil None

Documents

Posted documents for Solicitation W912BV25R0008

Opportunity Assistant


AI Analysis

AI Generate

Contract Awards

Prime contracts awarded through Solicitation W912BV25R0008

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W912BV25R0008

Similar Active Opportunities

Open contract opportunities similar to Solicitation W912BV25R0008

Experts for WD Mayo Alignment Cell

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SWD > US ARMY ENGINEER DISTRICT TULSA
FPDS Organization Code
2100-W912BV
Source Organization Code
100221322
Last Updated
Oct. 7, 2025
Last Updated By
tyler.a.hastings@usace.army.mil
Archive Date
Oct. 7, 2026