Search Contract Opportunities

Virtual Industry Engagement: Comprehensive Everglades Restoration Plan (CERP), Indian River Lagoon South (IRL-S), C-44 Reservoir and Stormwater Treatment Area (C-44 RSTA), Seepage Management Feature - Relief Wells Contract A, Martin County, Florida

ID: W912EP26Z1CR9 • Type: Special Notice • Match:  95%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Analyze Opportunity
Generate a Draft
Loading

Description

Background
The U.S. Army Corps of Engineers (USACE), Jacksonville District, is initiating a project under the Comprehensive Everglades Restoration Plan (CERP) focusing on the Indian River Lagoon South (IRL-S).

The specific project involves the C-44 Reservoir and Stormwater Treatment Area, particularly the Seepage Management Feature - Relief Wells Contract A located in Martin County, Florida. The goal of this contract is to construct groundwater pressure relief wells to manage seepage effectively and enhance water management in the area.

Work Details
The contract entails constructing approximately 126 relief wells at designated locations adjacent to the C-44 reservoir embankment. Key tasks include:
- Construction of a well outfall system for each relief well, including precast manholes, pipes, and discharge sections.
- Documentation of construction processes, development, and pump testing for all wells.
- Managing borehole wall stability across various subsurface conditions such as clayey sands and limestone.
- Installation of a 10-inch diameter stainless steel riser with high flow screens in boreholes measuring 18 to 24 inches in diameter.
- Backfilling with non-calcareous filter media compatible with subsurface materials and sealing with bentonite and grout.
- Additional work includes excavation, grading, dewatering, and restoration of pre-existing conditions after construction.

Period of Performance
The anticipated period of performance for this project is between 24 to 30 months from the Notice to Proceed (NTP), which includes options for a subset of wells.

Place of Performance
Indiantown FL UNITED STATES

Bidder Requirements
Bidders must demonstrate bonding capability for projects within a target price range of $25 million to $50 million. Additionally, contractors are required to have relevant licenses for construction activities related to heavy civil engineering projects. Compliance with safety qualifications outlined in EM 385-1-1 is also mandatory.

ADVANCED INDUSTRY DAY ENGAGEMENT - VIRTUAL

*** RELATED NOTICE ID: W912EP26Z1BBR ***

PROJECT: Comprehensive Everglades Restoration Plan (CERP), Indian River Lagoon South (IRL-S), C-44 Reservoir and Stormwater Treatment Area (C-44 RSTA), Seepage Management Feature - Relief Wells Contract A, Martin County, Florida

1. PURPOSE OF THIS SPECIAL NOTICE

The U.S. Army Corps of Engineers (USACE), Jacksonville District, is seeking industry partner feedback in advanced one-on-one engagement sessions regarding the subject project.

This is not a typical Industry Day. The purpose of this event is to engage in a two-way dialogue. The Government will share specific project challenges, and we are seeking your information on your capabilities with respect to this project to help enable innovative solutions to be executed within the design plans and specifications. The Government can use these exchanges to learn from industry what is possible to accomplish given current or upcoming advances in technology, best commercial practices, or other approaches to meet Government objectives and accomplish mission needs.

2. PROJECT DESCRIPTION

The work is located on approximately 12,000 acres of land in Martin County, Florida directly north of Citrus Boulevard and the C-44 Canal (also known as the St. Lucie Canal), halfway between Lake Okeechobee and the Atlantic Ocean. For purposes of this construction contract, the anticipated location of site activities will occur throughout the current C-44 Reservoir site adjacent to the perimeter canal. The work consists of constructing groundwater pressure relief wells adjacent to the C-44 reservoir embankment.

The work generally consists of:

  • Construction of approximately 126 fully designed relief wells at prescribed locations.
  • Construction of well outfall system consisting of a precast manhole, pipe and discharge end section for each relief well to drain into the adjacent canal.
  • Documenting the construction, development, and pump testing of all wells.
  • Well construction will require managing borehole wall stability for a variety of subsurface conditions that may consist of surficial clayey and silty sands, very loose uniform fine sands, dense sands having varying degrees of cementation, limestone/sandstone, and sand to cobble size shells. Groundwater conditions are likely to be artesian at the well locations.

Specific Project Challenges:

The work includes construction of wells at approximately 60 ft deep. The relief well will have a 10-inch diameter stainless steel riser and high flow screen, constructed in an 18 to 24-inch diameter borehole. The anulus between the borehole and riser will be backfilled with a uniform and non-calcareous filter media commonly used in the water well industry and selected for compatibility with the encountered subsurface materials. Well construction will require managing borehole wall stability for a variety of subsurface conditions that may consist of surficial clayey and silty sands, very loose uniform fine sands, dense sands having varying degrees of cementation, limestone/sandstone, and sand to cobble size shells. Groundwater conditions are likely to be artesian at the well locations. Above the screen and filter media, the borehole will be sealed with bentonite and grout. All backfill materials will be placed by tremie method.

The existing canal is approximately 35 feet from the well locations. The groundwater level varies with reservoir stage and can be expected to be higher than the canal water level. The canal water level varies (normally approximately EL 18.5 ft) and can increase up to 2 ft above normal stage during project operations. The reservoir pool varies and can be expected to be between EL 29.0 ft and EL 36 ft (3 ft to 10 ft pool) during the period of performance.

  • The Target Price range is between $25,000,000 and $50,000,000.
  • The goal period of performance for this project is 24-30 months from receipt of Notice to Proceed (NTP), including options for a subset of the wells.
  • The applicable North American Industry Classification System (NAICS) code assigned to this procurement is 237990, Other Heavy and Civil Engineering Construction.
  • The Small Business Size Standard for this project is $45.0 million.

3. DISCUSSION TOPICS

Attached to this notice are the draft plans and specifications. We ask you to review these documents and come prepared to discuss your observations and insights in the following areas:

Design & Construction

  • Aspects of the current design that limit speed of construction, add cost without apparent need or improvement in quality or function, preclude more efficient means/methods/equipment.
  • Ambiguities, apparent errors, missing information or other aspects in the plans and specifications that are unclear.
  • Optimizations in regard to the drilling and well construction specifications related to equipment, borehole stability, installation and development.
  • Aspects of the design that present constructability challenges.
  • Critical factors in the design that would inhibit a reduced period of performance.

Schedule & Logistics

  • Optimal sequencing strategies to minimize the overall period of performance, and whether the draft specifications provide sufficient flexibility to execute those sequences.
  • Long-lead materials or equipment that the Government should consider procuring now to advance the schedule.
  • Identification of Government actions, administrative decisions, information, or reviews (e.g., submittal approvals) that must be available early in the process to support an optimized schedule.

Other Topics:

  • Impact of inclusion of a Project Labor Agreement (PLA).
  • Interest in submitting a proposal for this project.
  • Your firm's bonding capability for this size of project.

4. ENGAGEMENT FORMAT: VIRTUAL ONE-ON-ONE SESSIONS

The Government will be holding confidential, one-hour one-on-one virtual sessions. This format is designed to protect your proprietary ideas and allow for a substantive engagement in the most important aspects listed above.

In accordance with RFO 15.101(d), when information about a proposed acquisition is disclosed to one or more potential offerors and that information is necessary for the preparation of proposals, the information should be made available to the public as soon as practicable in order to avoid creating an unfair competitive advantage.

5. EVENT INFORMATION / REGISTRATION

  • Date: October 29 & 30, 2026
  • Time: To be established upon registration

Interested firms who consider themselves qualified to perform this project and would like to participate, a session request must be sent. One-hour slots will be allocated on a first-come, first-served basis.

To request a session, please email Manuela D. Voicu at manuela.d.voicu@usace.army.mil and Martha G. Sequeira at martha.g.sequeira@usace.army.mil no later than 1600 ET October 23, 2026, indicating your preferred date and one hour block (0900 1200 or 1300 1600). The Government will issue an email confirming your time and meeting invite.

6. WHO SHOULD ATTEND

All interested Prime Contractors and potential Joint Ventures are invited to attend.

7. DISCLAIMER

This is NOT a solicitation. This announcement is for planning and market research purposes only and shall not be construed as a solicitation, request for proposal, or commitment by the Government. Participation in this event is voluntary and at no cost to the Government. The Government will not reimburse any costs associated with participation.

The Government does not intend to award a contract on the basis of the information received at this event or otherwise pay for the information requested. Information received from Industry will be treated as information only and not as a proposal.

Loading Map
Loading Map

Overview

Response Deadline
Due in 9 Days
Posted
Set Aside
None
Place of Performance
Indiantown, FL United States
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Value Range
Experimental
$12,000,000 - $25,000,000 (AI estimate)
On 10/13/26 USACE Jacksonville District issued Special Notice W912EP26Z1CR9 for Virtual Industry Engagement: Comprehensive Everglades Restoration Plan (CERP), Indian River Lagoon South (IRL-S), C-44 Reservoir and Stormwater Treatment Area (C-44 RSTA), Seepage Management Feature - Relief Wells Contract A, Martin County, Florida due 10/23/26.
Primary Contact
Name
Martha Sequeira   Profile
Phone
None

Secondary Contact

Name
Manuela Voicu   Profile
Phone
None

Documents

Posted documents for Special Notice W912EP26Z1CR9

Opportunity Assistant


Analyze Opportunity

Generate a Draft

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Special Notice W912EP26Z1CR9

Similar Active Opportunities

Open contract opportunities similar to Special Notice W912EP26Z1CR9

Experts for Virtual Industry Engagement: Comprehensive Everglades Restoration Plan (CERP), Indian River Lagoon South (IRL-S), C-44 Reservoir and Stormwater Treatment Area (C-44 RSTA), Seepage Management Feature - Relief Wells Contract A, Martin County, Florida

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SAD > US ARMY ENGINEER DISTRICT JACKSONVI
FPDS Organization Code
2100-W912EP
Source Organization Code
100221797
Last Updated
Last Updated By
martha.g.sequeira@usace.army.mil
Archive Date