Search Contract Opportunities

Ut Ftnp Care 10(2) 100(1) – Capitol Reef National Park   4

ID: 6982AF23B000031 • Type: Solicitation

Description

THIS IS FULL AND OPEN COMPETITION w/HUBZONE PREFERENCE

UT FTNP CARE 10(2) & 100(1) CAPITOL REEF NATIONAL PARK
PROJECT DESCRIPTION: The UT NP CARE 10(2)100(1), Capitol Reef National Park, project is approximately 10.9 miles west of the Torrey Utah and 45.3 miles west of Boulder Utah. The project is proposing to rehabilitate (3R) roads and parking lots and pavement preservation on routes within Capital Reef National Park. The project is broken up into a schedule with three options, described below.

SCOPE OF THE WORK: The project is proposing to rehabilitate (3R) approximately 6.40 miles of road along with pullouts for schedule A. Option X is a (3R) rehabilitation of the Visitor Center parking lot. Option Y is a (3R) rehabilitation of the Chimney Rock parking lot. Option Z pavement preservations of various roadway and parking lots within Capital Reef National Park. For both Schedule A and Option X and Y the roads parking lots, and pullouts are in need rehabilitation due to deterioration that is typical of aging pavements. The existing pavement section on roadways are in poor condition with roadway cracking and aggregate surfacing. This pavement preservation work will include crack sealing, asphalt patching, micro sealing, and chip sealing.

The estimated value of this project is between $10,000,000 and $20,000,000.

Background
The UT NP CARE 10(2)100(1), Capitol Reef National Park, project is proposing to rehabilitate (3R) roads and parking lots and pavement preservation on routes within Capital Reef National Park. The estimated value of this project is between $10,000,000 and $20,000,000.

Work Details
The project is proposing to rehabilitate (3R) approximately 6.40 miles of road along with pullouts for schedule A. Option X is a (3R) rehabilitation of the Visitor Center parking lot.
Option Y is a (3R) rehabilitation of the Chimney Rock parking lot.
Option Z pavement preservations of various roadway and parking lots within Capital Reef National Park. The pavement preservation work will include crack sealing, asphalt patching, micro sealing, and chip sealing.

Place of Performance
The construction projects will be performed within Capitol Reef National Park in Utah.

Overview

Response Deadline
Jan. 11, 2024, 3:00 p.m. EST Past Due
Posted
Dec. 7, 2023, 9:31 a.m. EST (updated: March 25, 2024, 3:07 p.m. EDT)
Set Aside
None
Place of Performance
UT United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
On 12/7/23 Central Federal Lands Highway Division issued Solicitation 6982AF23B000031 for Ut Ftnp Care 10(2) 100(1) – Capitol Reef National Park due 1/11/24. The opportunity was issued full & open with NAICS 237310 and PSC Y1LB.
Primary Contact
Name
Ryan Phillips   Profile
Phone
None

Documents

Posted documents for Solicitation 6982AF23B000031

Question & Answer

Opportunity Lifecycle

Procurement notices related to Solicitation 6982AF23B000031

Award Notifications

Agency published notification of awards for Solicitation 6982AF23B000031

Contract Awards

Prime contracts awarded through Solicitation 6982AF23B000031

Protests

GAO protests filed for Solicitation 6982AF23B000031

Incumbent or Similar Awards

Contracts Similar to Solicitation 6982AF23B000031

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation 6982AF23B000031

Similar Active Opportunities

Open contract opportunities similar to Solicitation 6982AF23B000031

Additional Details

Source Agency Hierarchy
TRANSPORTATION, DEPARTMENT OF > FEDERAL HIGHWAY ADMINISTRATION > 6982AF CENTRAL FEDERAL LANDS DIVISI
FPDS Organization Code
6925-00068
Source Organization Code
100173515
Last Updated
April 14, 2024
Last Updated By
ryan.d.phillips@dot.gov
Archive Date
April 14, 2024