UT FLAP 73(2) La Sal Mountain Loop Road   4

ID: 6982AF23B000027 • Type: Presolicitation
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

Description

THIS IS NOT A REQUEST FOR BID PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.

PROJECT NUMBER: UT FLAP 73(2)

PROJECT NAME: LaSal Loop Road

The UT FLAP 73(2) LaSal Loop Road project is located approximately 8 miles southeast of Moab, UT in Eastern Utah. The project crosses through Utah State School and Institutional Trust Lands (SITLA), Bureau of Land Management (BLM), private, and United States Forest Service (USFS) lands, providing access to the Manti - La Sal National Forest and Bureau of Land Management lands. The route is categorized as a major rural collector in mountainous terrain and is maintained by San Juan County.

This project rehabilitates and reconstructs the existing road with minor superelevation correction, profile adjustments, curve widening, ditch reconstruction, culvert replacements, asphalt surfacing, erosion control, signing, and pavement markings. The existing pavement is in poor condition with significant rutting, cracking, and potholing apparent along the route. To complete the proposed widening and realignment, rock and soil cuts and fills are expected. Due to the mountainous terrain, significant boulders and areas with noted seepage or soft subgrade will be encountered. The project consists of two segments, broken into Schedule A and Option X.

Segment 1 (Option X) - Segment 1 goes from the intersection of Old Airport Road 11 +62 to 147+00 at the intersection of Pack Creek Cutoff. Rehabilitation and widening consists of pulverizing the existing pavement, widening the road to 30 feet from the beginning to 45+00 and 26 feet for the remainder of the road, placing aggregate base and asphalt concrete pavement, and drainage improvements.

Segment 2 (Schedule A) - Segment 2 goes from 147+00 at the intersection of Pack Creek Cutoff, and goes to 650+91, the boundary with the previous project UT PFH 46-1(2) and UT FLAP 73(1). Rehabilitation consists of pulverizing the existing pavement, placing new aggregate base leveling, asphalt concrete pavement, and drainage improvements to narrow the roadway width to 26 feet. Five locations will be reconstructed requiring raising or lowering profile, placing aggregate base, asphalt concrete pavement, and drainage improvements to widen the roadway width to 26 feet.

PRINCIPAL WORK ITEMS (Schedule A):

20401-0000 Roadway Excavation: 75,000 CUYD

30101-0000 Aggregate Base: 55,000 TON

30401-5500 Full Depth Reclamation: 9.45 Miles

40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-lnch or 3/4-lnch

Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL: 31,000 TON

60201-1000 Culverts: 4000 LNFT

63501-1000 Temporary Traffic Control: LPSM

PRINCIPAL WORK ITEMS (Option X):

20401-0000 Roadway Excavation: 16,000 CUYD

30101-0000 Aggregate Base: 25,000 TON

30401-5500 Full Depth Reclamation: 2.56 Miles

40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-lnch or 3/4-lnch

Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL: 9,600 TON

63501-1000 Temporary Traffic Control: LPSM

It is anticipated this project will be advertised in October 2023 and be under construction in January 2024. The project has a completion date of October 22, 2025.
The estimated price range of the project work is between $20,000,000 and $30,000,000.

MISCELLANEOUS:

Construction will take two construction seasons to complete. The project ranges in elevation from 4870 feet at Station 11 +62 to a maximum elevation of 7,960 near Station 616+00. Construction along the entire alignment may not be always favorable during the construction duration, generally limiting operations sensitive to snow and seasonal cold temperatures at higher elevations during autumn, winter, and spring months (October to April).

Due to environmental considerations, Station 545+00 to 651 +00 must be completed between May 2024 and October 2024.

This will be advertised as a full and open competition.

Background
The UT FLAP 73(2) LaSal Loop Road project is issued by the Federal Highway Administration (FHWA) and is located approximately 8 miles southeast of Moab, UT. The project aims to rehabilitate and reconstruct the existing road that provides access to the Manti - La Sal National Forest and Bureau of Land Management lands. The route is categorized as a major rural collector in mountainous terrain, maintained by San Juan County. The existing pavement is in poor condition, necessitating significant repairs and improvements.

Work Details
The project involves two segments: Segment 1 (Option X) and Segment 2 (Schedule A). Segment 1 includes rehabilitation and widening from Old Airport Road to Pack Creek Cutoff, involving pulverizing existing pavement, widening the road to 30 feet, placing aggregate base and asphalt concrete pavement, and drainage improvements.

Segment 2 extends from Pack Creek Cutoff to the boundary with previous projects, focusing on pulverizing existing pavement, placing new aggregate base leveling, asphalt concrete pavement, and drainage improvements to narrow the roadway width to 26 feet.

Principal work items include:
- Schedule A:
- Roadway Excavation: 75,000 CUYD
- Aggregate Base: 55,000 TON
- Full Depth Reclamation: 9.45 Miles
- Asphalt Concrete Pavement: 31,000 TON
- Culverts: 4000 LNFT
- Temporary Traffic Control: LPSM
- Option X:
- Roadway Excavation: 16,000 CUYD
- Aggregate Base: 25,000 TON
- Full Depth Reclamation: 2.56 Miles
- Asphalt Concrete Pavement: 9,600 TON
- Temporary Traffic Control: LPSM.

Period of Performance
Construction will take place over two construction seasons with an anticipated start in January 2024 and a completion date of October 22, 2025.

Place of Performance
The construction projects will be performed along LaSal Loop Road in Eastern Utah.

Overview

Response Deadline
Oct. 13, 2023, 4:00 p.m. EDT Past Due
Posted
Sept. 27, 2023, 5:27 p.m. EDT (updated: Nov. 1, 2023, 6:09 p.m. EDT)
Set Aside
None
Place of Performance
Moab, UT United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Odds of Award
90%
On 9/27/23 Central Federal Lands Highway Division issued Presolicitation 6982AF23B000027 for UT FLAP 73(2) La Sal Mountain Loop Road due 10/13/23. The opportunity was issued full & open with NAICS 237310 and PSC Y1LB.
Primary Contact
Name
Eric Grosskreuz   Profile
Phone
None

Secondary Contact

Name
Ryan Phillips   Profile
Phone
None

Documents

Posted documents for Presolicitation 6982AF23B000027

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Presolicitation 6982AF23B000027

Award Notifications

Agency published notification of awards for Presolicitation 6982AF23B000027

Contract Awards

Prime contracts awarded through Presolicitation 6982AF23B000027

Incumbent or Similar Awards

Contracts Similar to Presolicitation 6982AF23B000027

Potential Bidders and Partners

Awardees that have won contracts similar to Presolicitation 6982AF23B000027

Similar Active Opportunities

Open contract opportunities similar to Presolicitation 6982AF23B000027

Additional Details

Source Agency Hierarchy
TRANSPORTATION, DEPARTMENT OF > FEDERAL HIGHWAY ADMINISTRATION > 6982AF CENTRAL FEDERAL LANDS DIVISI
FPDS Organization Code
6925-00068
Source Organization Code
100173515
Last Updated
Nov. 13, 2023
Last Updated By
eric.grosskreuz@dot.gov
Archive Date
Nov. 13, 2023