Description

STATEMENT OF WORK (SOW) FOR USCGC SMILAX Crane ServiceSMILAX bent a support lattice on the CG300 crane and is in need for rental crane services for tasks outlined in this Statement of Work (SOW). 1.0 GENERAL 1.1 BACKGROUND The 100' WLIC asset, USCGC SMILAX, has a bent the lattice on the upper section of the CG300 and requesters a crane and qualified rigger that can lift the boom off to the pier and replace it with a new 8500 LB 720in x 70inx 70in boom section being provided by Sparrows. 1.2 SCOPE The scope of this contract is defined by the efforts and tools required to support USCGC SMILAX. The Contractor shall provide all labor, materials, and tools necessary to lift, up to 8500 lb boom off the Cutter and back onto the Cutter 1.3 OBJECTIVE The goal is to return CGC SMILAX CG300 to designed system parameters. 1.4 APPLICABLE DOCUMENTS 1.4.1 Compliance Documents The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:
2.0 SPECIFIC REQUIREMENTS/TASKS Unless otherwise stated, this contract applies to on-site support for USCGC SMILAX in Atlantic Beach, NC 2.1 Boom lift - Remove boom from cutter.The Contractor shall perform any inspections or evaluations, as deemed necessary, to determine best path forward prior to commencing work.
2.1.1 CGC SMILAX will remove all wire rope from boom before crane is onsight 2.1.2 The Contractor shall inspect, and follow best lifting procedures. 2.1.3 Crew will unbolt boom stops and boom and Contractors will lift boom stops then boom and place on pier. 2.1.4 CGC SMILAX will remove pins holding top boom section.
LAST UPDATED: 10/13/2026
Diminsions
Boom stop -1000 lb 240in x 10in x 10in
Boom - 8500 LB 720in x 70inx 70in

1.3 OBJECTIVE The goal is to return CGC SMILAX CG300 to designed system parameters. 1.4 APPLICABLE DOCUMENTS 1.4.1 Compliance Documents The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:
2.0 SPECIFIC REQUIREMENTS/TASKS Unless otherwise stated, this contract applies to on-site support for USCGC SMILAX in Atlantic Beach, NC 2.1 Boom lift - Remove boom from cutter.The Contractor shall perform any inspections or evaluations, as deemed necessary, to determine best path forward prior to commencing work.
2.1.1 CGC SMILAX will remove all wire rope from boom before crane is onsight 2.1.2 The Contractor shall inspect, and follow best lifting procedures. 2.1.3 Crew will unbolt boom stops and boom and Contractors will lift boom stops then boom and place on pier. 2.1.4 CGC SMILAX will remove pins holding top boom section

2.1.6 The Contractor will lift boom back onto cutter where the crew will bolt it to the crane.
2.2 Test Thoroughly and Document
The Contractor shall ensure the system is fully functional by preforming a system operational test to be witnessed by Engineer Petty Officer (EPO) or the EPO's designated representative.
2.2.1 The Contractor shall provide a trip report documenting all findings no later than 48 hours after returning to the home office.
3.0 CONTRACTOR PERSONNEL
3.1 The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.
4.0 OTHER APPLICABLE CONDITIONS 4.1 PERIOD OF PERFORMANCE The period of performance for this contract shall not exceed 2 calendar from the date of award. 4.2 PLACE OF PERFORMANCE The primary place of performance will be at CGC SMILAX at 2301 E. Fort Macon RD. Atlantic Beach, NC 28512. 4.3 HOURS OF OPERATION Contractor employees shall generally perform all work between the hours of 0730 and 1600 CST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. 4.4 TRAVEL Contractor travel may be required to support this requirement. 4.5 Daily Progress Reports The Contractor shall hold a daily progress meeting with the Engineer Petty Officer and/or Commanding Officer upon arrival at the asset each morning of the visit. This report shall include a summary of all Contractor work performed, an assessment of technical progress, schedule status, and discuss any hazardous work conditions or necessary precautions the crew need to be made aware of prior to commencing work. 4.6 General Report Requirements The Contractor shall provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Windows and Microsoft Office Applications).
Contractors will lift old boom section off and place new boom section in its place,
where crew will attach sections together

2.1.6 The Contractor will lift boom back onto cutter where the crew will bolt it to the crane.
2.2 Test Thoroughly and Document
The Contractor shall ensure the system is fully functional by preforming a system operational test to be witnessed by Engineer Petty Officer (EPO) or the EPO's designated representative.
2.2.1 The Contractor shall provide a trip report documenting all findings no later than 48 hours after returning to the home office.
3.0 CONTRACTOR PERSONNEL
3.1 The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.
4.0 OTHER APPLICABLE CONDITIONS 4.1 PERIOD OF PERFORMANCE The period of performance for this contract shall not exceed 2 calendar from the date of award. 4.2 PLACE OF PERFORMANCE The primary place of performance will be at CGC SMILAX at 2301 E. Fort Macon RD. Atlantic Beach, NC 28512. 4.3 HOURS OF OPERATION Contractor employees shall generally perform all work between the hours of 0730 and 1600 CST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. 4.4 TRAVEL Contractor travel may be required to support this requirement. 4.5 Daily Progress Reports The Contractor shall hold a daily progress meeting with the Engineer Petty Officer and/or Commanding Officer upon arrival at the asset each morning of the visit. This report shall include a summary of all Contractor work performed, an assessment of technical progress, schedule status, and discuss any hazardous work conditions or necessary precautions the crew need to be made aware of prior to commencing work. 4.6 General Report Requirements The Contractor shall provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Windows and Microsoft Office Applications).

5.0 GOVERNMENT FURNISHED RESOURCES
NA
6.0 CONTRACTOR FURNISHED PROPERTY
The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in Section 5.0.
7.0 GOVERNMENT ACCEPTANCE PERIOD
The EPO will inspect deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the EPO will send an e-mail to the Contractor notifying it that the deliverable has been accepted.
8.0 DELIVERABLES
The Contractor shall provide a trip report IAW 2.2 of this SOW.

Overview

Response Deadline
Due in 5 Days
Posted
Set Aside
Small Business (SBA)
Place of Performance
Atlantic Beach, NC 28512 United States
Source

Current SBA Size Standard
1300 Employees
Pricing
Likely Fixed Price
Est. Level of Competition
Low
Est. Value Range
Experimental
$15,000 - $45,000 (AI estimate)
Signs of Shaping
The solicitation is open for 5 days, below average for the Coast Guard. 50% of obligations for similar contracts within the Coast Guard were awarded full & open.
On 10/20/26 Coast Guard issued Synopsis Solicitation 70ZU0227Q0000093 for USCGC Smilax Crane Service due 10/26/26. The opportunity was issued with a Small Business (SBA) set aside with NAICS 336611 (SBA Size Standard 1300 Employees) and PSC J020.
Primary Contact
Name
Justin Wooldridge   Profile
Phone
(206) 820-5327

Secondary Contact

Name
Lindsay Mongiovi   Profile
Phone
None

Documents

Posted documents for Synopsis Solicitation 70ZU0227Q0000093

Opportunity Assistant


Analyze Opportunity

Generate a Draft

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Synopsis Solicitation 70ZU0227Q0000093

Similar Active Opportunities

Open contract opportunities similar to Synopsis Solicitation 70ZU0227Q0000093

Experts for USCGC Smilax Crane Service

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
HOMELAND SECURITY, DEPARTMENT OF > US COAST GUARD > CG-SEA-C22
FPDS Organization Code
7008-70ZU02
Source Organization Code
500211773
Last Updated
Last Updated By
lindsay.n.mongiovi@uscg.mil
Archive Date