USAF - MacDill AFB, Bldg 89 Datacenter Uninterrupted Power Supply - Market Resea

ID: RFI1811108 • Alt ID: R_Gq4fpwAcb7argyw • Type: Sources Sought • Match:  100%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading

Description

The United States Air Force (USAF), in collaboration with the General Services Administration (GSA), is conducting market research to identify potential solutions for upgrading the Uninterruptible Power Supply (UPS) system at MacDill Air Force Base's Building 89 data center. This initiative aims to ensure a reliable and efficient power backup system that can handle current and future demands, thereby supporting the continuous operation of critical data center infrastructure. The GSA's involvement underscores a commitment to procuring high-quality, sustainable solutions that align with federal standards and regulations.

The scope of work outlined in the Statement of Work (SOW) involves replacing three existing 60Kw Eaton BladeUPS systems with a new 125KVA UPS system. This upgrade seeks to enhance the reliability of power backup, minimize downtime during installation, and ensure that all processes comply with environmental regulations for equipment disposal. The project requires comprehensive services including labor, materials, tools, equipment, and supervision needed for the removal of old units and installation of new ones. Additionally, it includes an electrical survey to evaluate the existing distribution capacity or recommend necessary upgrades.

Key requirements for the new UPS system include sufficient sizing to meet current load requirements with provisions for at least a 50% expansion capacity in the future. It must provide a minimum runtime of 30 minutes at full load capacity and feature independent switching capabilities per row of racks. Furthermore, advanced features such as network management and monitoring capabilities are essential to facilitate local user access. A built-in maintenance bypass switch is also required to allow seamless UPS offline removal when necessary. Preferred technologies include lithium-ion or advanced VRLA systems from reputable manufacturers like Vertiv Liebert, APC, Eaton, or Schneider Electric.

In addition to technical specifications, vendors are expected to offer extended warranty options and maintenance contracts on an annual basis to ensure ongoing support and service reliability. This project not only aims at enhancing operational efficiency but also emphasizes sustainability by adhering strictly to environmental guidelines during equipment disposal processes.

Overview

Response Deadline
May 26, 2026 Past Due
Posted
May 11, 2026
Set Aside
None
Place of Performance
FEDERAL ACQUISITION SERVICE Boston, MA 02222 USA
Source
HigherGov Research

Current SBA Size Standard
1250 Employees
Pricing
Likely Fixed Price
Est. Level of Competition
Low
Odds of Award
21%
On 5/10/26 Department of the Air Force issued Sources Sought RFI1811108 for USAF - MacDill AFB, Bldg 89 Datacenter Uninterrupted Power Supply - Market Resea due 5/26/26. The opportunity was issued full & open with NAICS 334111 and PSC 7B22.

Documents

Posted documents for Sources Sought RFI1811108

Opportunity Assistant


AI Analysis

AI Generate

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Sources Sought RFI1811108

Similar Active Opportunities

Open contract opportunities similar to Sources Sought RFI1811108

Experts for USAF - MacDill AFB, Bldg 89 Datacenter Uninterrupted Power Supply - Market Resea

Recommended subject matter experts available for hire