Search Contract Opportunities

USACE-SPK -DBB - Folsom Main, Left Wing and Right Wing Dams   7

ID: W9123822R0055 • Type: Solicitation
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Does this contract have any security clearance requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

Posted: Dec. 9, 2022, 5:52 p.m. EST

***Amendment 0006 has been posted to piee.eb.mil. Please use the link below to access the amendment and updated attachments.****

Access to Amendment 0006 can be found at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055

***Amendment 0005 has been posted to piee.eb.mil. Please use the link below to access the amendment. ****

Access to Amendment 0005 can be found at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055

***Sign-in Sheet for second site visit conducted on November 21, 2022, is provided as an attachment below.***

***Amendment 0004 has been posted to piee.eb.mil at the link below. The details of the second site visit are contained within Amendment 0004 and submission of information to attend the second site visit must be received by 2:00pm (Pacific Time) on November 17, 2022.***

https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055

***Amendment 0003 has been posted to piee.eb.mil. Please use the link below to access the amendment. ****

Access to the solicitation and Amendment 0003 can be found at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055

***Amendment 0002 has been posted to piee.eb.mil. Please use the link below to access the amendment. Amendment 0001 was skipped and contractors should acknowledge Amd 01 on the SF1442 with their proposal understanding that this amendment will not be utilized.

The site visit sign-in sheet is attached at the bottom of this announcement.****

Access to the solicitation and Amendment 0002 can be found at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055

The Folsom Dam Raise Project is a Flood Risk Management project which will provide system-wide flood damage reduction benefits when combined with the common features efforts within the Sacramento Valley. The key project features Main Dam Spillway work on all eight Tainter gates which includes structural retrofits to the trunnion anchorage system, structural reinforcing to strengthen gates, ?top seal? structural headwalls installed above each gate, concrete pier extensions, new elevated hoist platforms, and new cable hoist system with new electrical controls. Also, key is the Left and Right Wing Dams work which includes construction of a reinforced L-shaped concrete floodwall (3.5-feet height) above existing ground level, embankment work, relocation of utility and security features, and a removable stoplog system approximately 20 feet wide will be framed and installed through the concrete flood wall near the tie-in location between the Main Dam and the Left Dam.

The disclosure of magnitude for construction is between $100,000,000.00 to $250,000,000.00.

This will be an unrestricted procurement, using a Lowest Price Technically Acceptable method.

*Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0055' to obtain more details.*

Posted: Nov. 28, 2022, 5:17 p.m. EST
Posted: Nov. 28, 2022, 9:30 a.m. EST
Posted: Nov. 14, 2022, 5:42 p.m. EST
Posted: Nov. 3, 2022, 7:44 p.m. EDT
Posted: Oct. 21, 2022, 5:13 p.m. EDT
Posted: Oct. 21, 2022, 4:53 p.m. EDT
Posted: Oct. 12, 2022, 9:31 a.m. EDT
Posted: Oct. 3, 2022, 3:24 p.m. EDT
Posted: Sept. 30, 2022, 10:44 p.m. EDT
Background
The Folsom Dam Raise Project is a Flood Risk Management project which will provide system-wide flood damage reduction benefits when combined with the common features efforts within the Sacramento Valley. The key project features include Main Dam Spillway work on all eight Tainter gates which includes structural retrofits to the trunnion anchorage system, structural reinforcing to strengthen gates, 'top seal' structural headwalls installed above each gate, concrete pier extensions, new elevated hoist platforms, and new cable hoist system with new electrical controls.
Also, key is the Left and Right Wing Dams work which includes construction of a reinforced L-shaped concrete floodwall (3.5-feet height) above existing ground level, embankment work, relocation of utility and security features, and a removable stoplog system approximately 20 feet wide will be framed and installed through the concrete flood wall near the tie-in location between the Main Dam and the Left Dam.
The disclosure of magnitude for construction is between $100,000,000.00 to $250,000,000.00. This will be an unrestricted procurement, using a Lowest Price Technically Acceptable method.

Work Details
The Folsom Dam Raise Project involves construction tasks such as Main Dam Spillway work on all eight Tainter gates including structural retrofits to the trunnion anchorage system, strengthening gates with structural reinforcing, installation of 'top seal' structural headwalls above each gate, concrete pier extensions, new elevated hoist platforms, and a new cable hoist system with new electrical controls. Additionally, it includes work on the Left and Right Wing Dams involving construction of a reinforced L-shaped concrete floodwall (3.5-feet height) above existing ground level, embankment work, relocation of utility and security features, and installation of a removable stoplog system approximately 20 feet wide through the concrete flood wall near the tie-in location between the Main Dam and the Left Dam.

Place of Performance
The geographic location for this construction project is Folsom Dam.

Overview

Response Deadline
Dec. 20, 2022, 7:00 p.m. EST (original: Nov. 15, 2022, 5:00 p.m. EST) Past Due
Posted
Sept. 30, 2022, 10:44 p.m. EDT (updated: Dec. 9, 2022, 5:52 p.m. EST)
Set Aside
None
Place of Performance
Not Provided
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Evaluation Criteria
Lowest Price Technically Acceptable (LPTA)
On 9/30/22 USACE Sacramento District issued Solicitation W9123822R0055 for USACE-SPK -DBB - Folsom Main, Left Wing and Right Wing Dams due 12/20/22. The opportunity was issued full & open with NAICS 237990 and PSC Y1KA.
Primary Contact
Name
Nadine Catania   Profile
Phone
None

Secondary Contact

Name
Dayon Tre Santos   Profile
Phone
None

Documents

Posted documents for Solicitation W9123822R0055

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Solicitation W9123822R0055

Award Notifications

Agency published notification of awards for Solicitation W9123822R0055

Contract Awards

Prime contracts awarded through Solicitation W9123822R0055

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W9123822R0055

Similar Active Opportunities

Open contract opportunities similar to Solicitation W9123822R0055

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SPD > US ARMY ENGINEER DISTRICT SACRAMENT
FPDS Organization Code
2100-W91238
Source Organization Code
100221301
Last Updated
Dec. 9, 2022
Last Updated By
nadine.l.catania@usace.army.mil
Archive Date
Feb. 24, 2023