Search Contract Opportunities

USACE SPK DBB Construction - Natomas Reach I Contract 2, Sacramento, CA   2

ID: W9123826BA010 • Type: Presolicitation • Match:  90%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Loading

Description

The United States Army Corps of Engineers (USACE) Sacramento District (SPK) anticipates solicitation of a requirement for design-bid-build (DBB) construction services to be performed in support of the Natomas Reach I Contract 2 (RIC2) at Sacramento, California (CA).

The project is anticipated to support the American River Common Features (ARCF), Natomas Basin Project, located within the great Sacramento region of California. RIC2 is a continuation of Contract 1 which provided cutoff walls for seepage mitigation in the levees for the entire reach of Natomas Reach I, extending from Northgate Boulevard to Gateway Oaks Drive along the American River levee. Contract 2 project is anticipated to require flattening the landside slope along the American River from Gateway Oaks Drive to the Northgate Boulevard and along the NEMDC. Total length of slope flattening is approximately 2.18 miles and will include site excavation and re-use of approximately 15,000 cubic yard levee embankment fill and borrow site excavation and import of approximately 12,000 cubic yard levee embankment fill. The borrow site will be obtained by the Contractor. The work will also include the relocation of utilities, construction of a 12-foot maintenance road at the landside toe, and tree removal. Activities that impact the levee prism will only be permitted between 15 April and 1 November.

The estimated cost for the anticipated project is $5,000,000 to $10,000,000.

The Government intends to solicit an Invitation for Bids (IFB) that will result in award of a firm-fixed price contract.

The solicitation is anticipated to be issued using North American Industrial Classification System (NAICS) code 237990, Other Heavy and Civil Engineering Construction. The small business size standard for this NAICS, as established by the United States Small Business Administration (SBA), is $45,500,000.00 annual revenue The Product and Service Code (PSC) is anticipated to be Y1LC, Construction of Tunnels and Subsurface Structures.

The solicitation is anticipated to be issued as a total small business set-aside through the Procurement Integrated Enterprise Environment (PIEE - https://piee.eb.mil) and Governmentwide Point of Entry, the System for Award Management (SAM - www.SAM.gov) on or about July 2026 with bids tentatively due August 2026.

It is currently anticipated that the Government will conduct a pre-bid conference and/or site visit on or about August 2026. The specific date, time, location, and access requirements will be identified in any forthcoming solicitation.

Please DO NOT request an updated schedule if estimated dates are surpassed; the Government will release all information publicly through PIEE and SAM when updates are available. Requests for schedule updates may be ignored.

Please DO NOT request a copy of the solicitation, as it is not currently available. Any available technical data will be furnished with any forthcoming solicitation.

A DRAFT copy of the requirement plans and specifications are included as attachments to this Notice. Changes may be made to these documents prior to any subsequent solicitation. Questions related to the draft plans and specifications will NOT be entertained; instructions for submitting questions related to any future solicited plans and specifications will be included in any forthcoming solicitation. Following solicitation release, all responsible sources may submit a bid that shall be considered by the agency. This project and/or the anticipated solicitation may be changed, delayed, or canceled at any time.

The anticipated solicitation and attachments may be posted in Portable Document Format (.pdf) which will require Adobe Acrobat Reader to open and view files. Adobe Acrobat Reader may be downloaded free of charge at http://www.adobe.com/products/reader.

All prospective Offerors should be registered in the PIEE system at least one (1) week prior to the anticipated bid due date. Registration is not required to download any forthcoming solicitation documents, plans, and/or specifications, but IS required to submit a bid. Copies of the solicitation and attachments will be made available for inspection without charge after the solicitation is released, when accessed through PIEE. Failure to register in PIEE will prevent submission of bids as the Government will not accept them by any other means. See linked PIEE registration instructions and web-based training for information about how to access the PIEE Solicitation Module and submit bids.

All prospective Offerors must be registered in SAM before the anticipated solicitation closing date. Please see the SAM website for information about SAM registration requirements and approval timelines.

It is anticipated that any future solicitation and/or resulting contract will be subject to the E-Verify Employment Eligibility Verification Program (http://www.uscis.gov/e-verify), sustainable acquisition requirements, and/or high-performance sustainable building design and construction practices (https://www.epa.gov/greeningepa/guiding-principles-federal-leadership-high-performance-and-sustainable-buildings). Further, one or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements.

USACE will not notify prospective Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments.

The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov; Contractors are responsible for identifying their entity as an interested vendor and contacting other interested vendors. USACE SPK will not review capabilities statements submitted in response to this Synopsis or coordinate partnering arrangements between parties. Contractors should check SAM.gov frequently for changes to the interested vendors list and this Notice.

Background
The United States Army Corps of Engineers (USACE) Sacramento District (SPK) is anticipating the solicitation of design-bid-build (DBB) construction services for the Natomas Reach I Contract 2 (RIC2) project in Sacramento, California.

This project aims to support the American River Common Features (ARCF) and the Natomas Basin Project, continuing efforts from Contract 1 which focused on seepage mitigation in levees. The goal of this contract is to enhance flood protection and infrastructure in the region.

Work Details
The construction tasks under this contract include:
- Flattening the landside slope along the American River from Gateway Oaks Drive to Northgate Boulevard, covering approximately 2.18 miles;
- Site excavation and reuse of about 15,000 cubic yards of levee embankment fill;
- Importation of approximately 12,000 cubic yards of levee embankment fill from a contractor-sourced borrow site;
- Utility relocation;
- Construction of a 12-foot maintenance road at the landside toe;
- Tree removal; and
- Adherence to specific traffic control measures during construction.

The contractor must submit a Traffic Control Plan that ensures access to Discovery Park and maintains traffic flow on Garden Highway. Additionally, coordination with the City of Sacramento for streetlight, electrical, and fiber installations is required.

Period of Performance
The contract's period of performance is anticipated to begin following the solicitation release in July 2026 and will continue until project completion, with specific timelines dependent on various factors including weather conditions and project scope.

Place of Performance
Sacramento CA UNITED STATES

Bidder Requirements
This opportunity is a Small Business Set Aside - Total (SBA). Bidders must possess appropriate contractor licensing and bonding capabilities. They are also required to submit a Traffic Control Plan for approval prior to commencing construction activities. Compliance with safety qualifications and environmental regulations is mandatory.

Incumbent Analysis (see Incumbents section for more detail)
This opportunity appears to have a confirmed incumbent and/or closely related prior contract history within the USACE Sacramento District’s Natomas Reach I/ARCF program. Prior awards include Nordic Industries’ design-bid-build seepage cutoff wall work adjacent to the landward side of the American River Common Features in the Natomas Basin Reach E segment (W9123823C0008, $46,704,082), which aligns with the same levee system and seepage mitigation objectives and suggests continuity of construction along the American River levee reach. Additional closely related DBB levee/riverbank protection and cutoff wall efforts in the Natomas Basin (e.g., Ahtna-Forgen JV’s ARCF LAR Contract 3A rock toe protection and Odin Environmental Solutions’ Natomas Basin Reach D cutoff wall) further indicate that similar heavy civil earthwork, levee prism impacts, and site coordination requirements are recurring across these contracts.
Loading Map
Loading Map

Overview

Response Deadline
July 9, 2026, 4:00 p.m. EDT Due in 2 Days
Posted
July 7, 2026, 9:06 a.m. EDT
Set Aside
Small Business (SBA)
Place of Performance
Sacramento, CA United States
Source

Current SBA Size Standard
$45 Million
Pricing
Fixed Price
Est. Level of Competition
Average
Est. Value Range
$5,000,000 - $10,000,000 (value based on agency estimated range)
Odds of Award
79%
Signs of Shaping
The solicitation is open for 2 days, below average for the USACE Sacramento District. 78% of obligations for similar contracts within the Department of the Army were awarded full & open.
On 7/7/26 USACE Sacramento District issued Presolicitation W9123826BA010 for USACE SPK DBB Construction - Natomas Reach I Contract 2, Sacramento, CA due 7/9/26. The opportunity was issued with a Small Business (SBA) set aside with NAICS 237990 (SBA Size Standard $45 Million) and PSC Y1LC.
Primary Contact
Name
Henry Barron   Profile
Phone
None

Documents

Posted documents for Presolicitation W9123826BA010

Opportunity Assistant


AI Analysis

Opportunity Lifecycle

Procurement notices related to Presolicitation W9123826BA010

Incumbent or Similar Awards

Contracts Similar to Presolicitation W9123826BA010

Potential Bidders and Partners

Awardees that have won contracts similar to Presolicitation W9123826BA010

Similar Active Opportunities

Open contract opportunities similar to Presolicitation W9123826BA010

Experts for USACE SPK DBB Construction - Natomas Reach I Contract 2, Sacramento, CA

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SPD > US ARMY ENGINEER DISTRICT SACRAMENT
FPDS Organization Code
2100-W91238
Source Organization Code
100221301
Last Updated
July 7, 2026
Last Updated By
henry.d.barron@usace.army.mil
Archive Date
July 24, 2026