USACE SPK DB Construction - Building 1286 Steam Plant Upgrades at Hill AFB, UT   3

ID: W9123822R0006 • Type: Solicitation
HigherGov Subscribers Knew about This Opportunity Months Early

Find opportunities months or years earlier with HigherGov Forecasts

Free Trial Schedule Demo

Description

Posted: Sept. 27, 2022, 12:21 p.m. EDT

The U.S. Army Corps of Engineers (USACE) Sacramento District (SPK) has a new requirement to complete two-phase design-build construction services to upgrade the Steam Plant at B1286 on Hill AFB, UT.

This project will include the replacement of three (3) existing boilers in B1286 with new dualfuel (natural gas/fuel oil) boilers that meet BACT. This option will require phasing the boiler replacement in the existing plants to maintain steam production for the existing load. The existing buildings will require new wall openings and an emergency boiler to maintain N+1 boiler redundancy in the plants.

The boilers in B1286 will be replaced with two (2) new 50 million Btu/hour (MMBH) boilers. The boilers will achieve ultra-low oxides of nitrogen (NOx) emissions of 9 parts per million (ppm). The existing boiler fuel oil underground storage tanks (USTs) in both buildings will be removed and replaced with aboveground storage tanks (AST), which are sized for seven days of storage during peak heating season. The existing buildings will have seismic retrofitting and supporting equipment (deaerator, pumps, etc.) upgraded. The Contractor shall develop and complete the designs and construct the facility. The Contractor will be given a "buildable area" boundary, to best locate/layout the proposed facility.

The solicitation, plans, and specifications are available for inspection without charge when accessed through the GPE or when requested and delivered by electronic mail and/or data interchange.

In accordance with DFARS 236.204(i), the magnitude of construction for this requirement is estimated to be between $10,000,000 and $25,000,000

The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov. Contractors are responsible for self-identifying as interested vendors and contacting other interested vendors. USACE-SPK will not review capabilities statements submitted in response to this solicitation or coordinate partnering arrangements between parties. Contractors should check SAM.gov frequently for changes to the interested vendors list and the solicitation.

PLEASE NOTE: THIS PROJECT AND/OR THE PROPOSED CONTRACT ACTION MAY BE CHANGED, DELAYED, OR CANCELED AT ANY TIME.

____________________________________________________________________________

SAM Posting Amendment 0001 - Changes NAICS code from 238220 to 236220; Update sections 00 21 00 and 00 22 00.

________________________________________________________________________________________________________

SAM Posting Amendment 0002 - Establish Phase II proposal date and time submission; Update sections 00 21 00 and 00 22 00; issue updated attachments for Phase II; reopen Projnet; require bid guarantee for phase II proposals; add site visit information; revise line item structure.

________________________________________________________________________________________________________Sam Posting - Upload the site visit sign-in sheet and site visit agenda.

________________________________________________________________________________________________________

SAM Posting Amendment 0003 - Extend the solicitation proposal due date from 1:00 PM PST, 27 June 2022 to 1:00 PM PST 15 July 2022.

________________________________________________________________________________________________________

SAM Posting Amendment 0004 - Add feasibility study Attachment 13, and extend the solicitation proposal due date from 1:00 PM PST, 15 July 2022 to 9:00 PM PST 25 July 2022.

________________________________________________________________________________________________________

SAM Posting Amendment 0005 - Update sections, 00 21 00; 00 22 00; 00 73 00 and incorporate Government Furnished Property (GFP) provisions and clauses.

________________________________________________________________________________________________________

SAM Posting Amendment 0006 - Incorporates revised V1 Specifications dated 20220719 and V2 Appendices dated 20220719; Adds FAR 52.236-14-Availability and Use of Utility Services; Updates drawing E-603; Changes PoP from 730 days to 910 days; Extends solicitation closing date from 0900 PST, 25 July 2022 to 0900 PST, 01 August 2022; Updates GFP Generator Information.

________________________________________________________________________________________________________

SAM Posting Amendment 0007 - Incorporates revised Specifications Volume 1 to correct availabile utilty information and updates CLIN 0002 period of perforamnce to match other contract line items.

Posted: July 28, 2022, 5:31 p.m. EDT
Posted: July 21, 2022, 10:32 p.m. EDT
Posted: July 19, 2022, 12:58 p.m. EDT
Posted: July 15, 2022, 11:01 p.m. EDT
Posted: July 14, 2022, 10:25 p.m. EDT
Posted: June 24, 2022, 5:12 p.m. EDT
Posted: June 22, 2022, 3:34 p.m. EDT
Posted: May 27, 2022, 9:42 p.m. EDT
Posted: May 26, 2022, 2:02 p.m. EDT
Posted: March 29, 2022, 1:25 p.m. EDT
Posted: March 2, 2022, 9:42 p.m. EST
Background
The U.S. Army Corps of Engineers (USACE) Sacramento District (SPK) has a new requirement to complete two-phase design-build construction services to upgrade the Steam Plant at B1286 on Hill AFB, UT. The project will include the replacement of three existing boilers with new dual-fuel (natural gas/fuel oil) boilers that meet BACT. The existing buildings will require new wall openings and an emergency boiler to maintain 'N+1' boiler redundancy in the plants. The existing buildings will have seismic retrofitting and supporting equipment upgraded.

Work Details
The construction tasks include the replacement of three existing boilers with new dual-fuel boilers, seismic retrofitting, upgrading supporting equipment, replacing fuel oil underground storage tanks with aboveground storage tanks, and developing and completing the designs for the facility.
The project also involves electrical system modifications, including demoing existing electrical service, connecting new utility service, designing a new main distribution panelboard, providing energy monitoring, and installing two new boilers with auxiliary equipment.

Period of Performance
The period of performance for the contract is extended from 730 days to 910 days, with the solicitation proposal due date extended from 1:00 PM PST, 15 July 2022 to 9:00 PM PST 25 July 2022.

Place of Performance
The construction projects will be performed at Building 1286 on Hill AFB, UT.

Overview

Response Deadline
Aug. 1, 2022, 12:00 p.m. EDT (original: April 5, 2022, 4:00 p.m. EDT) Past Due
Posted
March 2, 2022, 9:42 p.m. EST (updated: Sept. 27, 2022, 12:21 p.m. EDT)
Set Aside
Small Business (SBA)
Place of Performance
Hill AFB, UT 84056 United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Fixed Price
Evaluation Criteria
Best Value
Signs of Shaping
70% of obligations for similar contracts within the Department of the Army were awarded full & open.
On 3/2/22 USACE Sacramento District issued Solicitation W9123822R0006 for USACE SPK DB Construction - Building 1286 Steam Plant Upgrades at Hill AFB, UT due 8/1/22. The opportunity was issued with a Small Business (SBA) set aside with NAICS 236220 (SBA Size Standard $45 Million) and PSC Z2NB.
Primary Contact
Name
Harold Teague   Profile
Phone
None

Documents

Posted documents for Solicitation W9123822R0006

Opportunity Lifecycle

Procurement notices related to Solicitation W9123822R0006

Award Notifications

Agency published notification of awards for Solicitation W9123822R0006

Contract Awards

Prime contracts awarded through Solicitation W9123822R0006

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W9123822R0006

Similar Active Opportunities

Open contract opportunities similar to Solicitation W9123822R0006

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SPD > US ARMY ENGINEER DISTRICT SACRAMENT
FPDS Organization Code
2100-W91238
Source Organization Code
100221301
Last Updated
Sept. 27, 2022
Last Updated By
amelia.k.bryant@usace.army.mil
Archive Date
Aug. 16, 2022