Description

Posted: Aug. 8, 2025, 6:11 p.m. EDT

PIEE Update 0007 is issued to transmit the Pre-Bid Site Visit #2 sign-in sheet (3 pages) for the IFB W912PL25BA007. PIEE Update 0006 is to transmit the SF-30 (3 pages) for Amendment 0004 of the IFB W912PL25BA007. This is to replace plan sheet 5A-M-002 and to provide site visit #2 information. Amendment 0004 does not extend the bid opening date. PIEE update 0005 is to transmit the SF-30 (7 pages) for Amendment 0003 of the IFB W912PL25BA007. This is to extend the bid open date, revise section 00 21 00 Instructions, revise section 00 21 13 Instructions to Bidders, and attach Documents 1-7 to address RFI inquiries. PIEE update 0004 is for administrative purposes only, any official amendment will be accompanied by an SF30. This is to inform the public of upcoming Amendment 0003 that will include the revised Plan Set and remove all references of bid submission through DoD Safe. Bids may only be submitted through PIEE. PIEE Update 0003 is issued to transmit the SF30 (2 pages) for Amendment 0002 of the IFB W912PL25BA007 to extend the bid opening date. PIEE Update 0002 is issued to transmit the Pre-Bid Site Visit sign-in sheet (1 page) for the IFB W912PL25BA007. PIEE Amendment 0001 is issued to transmit the SF-30 (7 pages) of the IFB W912PL25BA007, this amendment does not extend the proposal date. This is to provide site visit information and update conditions of U. S. Army Corps of Engineers Safety and Health Requirements. Provide all material and labor required to upgrade central chiller plant and DDC controls in Building 5A of the Long Beach VA campus, to comply with the latest codes and VA standards. All construction shall be performed in accordance with drawings and specifications provided by the VA. This project intends to replace the existing chillers, upgrade/refurbish existing cooling towers, upgrade/replace the primary and secondary chilled water pumps, condenser water pumps, related piping and controls, pressure differential Delta P valves in main chilled water lines entering each of the buildings and interface with existing Johnson Controls Metasys System. SOW includes but is not limited to:1. Civil-Site demolition includes removing existing concrete mow curb, cobbles and concrete pavement, gravel ground cover, irrigation, and sod.-New concrete sidewalk-One existing manhole will need to be raised to the new finished grade. A new pre-cast concrete manhole ring will be provided and installed by the contractor2. Structural-One of the new chillers shall be supported on the existing concrete pad, and for the other a new concrete foundation shall be provided. The chillers are connected to the concrete pad expansion anchors. The new air separator tank and expansion tank are supported and anchored to a new concrete pad. Equipment pumps are supported and anchored to concrete pads.-Electrical equipment shall be supported and anchored on new concrete pads mounted on the existing slab on grade-New piping is hung from the existing roof structure and supported on steel pipe supports as required3. Cooling Towers and Condenser Water Piping-Each of the existing four cell cooling towers (1100 ton per cell) shall be refurbished, including thermal upgrade to improve their performance-Install one new, factory built, packaged cooling tower with water filtration system and sweeper piping, condenser water pump, new piping and piping accessories-For existing 4-cell cooling towers, install four condenser water pumps-each 3.75 GPM at 125 feet head, 150 HP-For new cooling tower, install one condenser water pump- 3,750 GPM at 90 feet head, 125 HP-Remove two existing water filtration systems and replace with new four water filtration systems with sweeper piping to each cooling tower cell-All new piping and piping appurtenances to the new chillers, cooling towers and pumps shall include motorized valves, strainers, check valves, isolation valves, balancing valves, gauges and accessories4. Chillers and Chilled Water Piping System-Replace existing 1100-ton chiller with new 1250-ton chiller-Provide one, new 1250-ton chiller-For two new chillers, install two, primary chilled water pumps-each 3000 GPM at 50 feet head, 50 HP, One, secondary chilled water pump-3000 GPM at 180 feet head, 200 HP. Provide primary and secondary chilled water pumps with variable frequency drive (VFD) for the two new chillers-Provide pressure differential (Delta P) valves on the chiller water mains entering each building served by the Central Plant5. Chiller Room Refrigeration Leak Detection Monitoring System-Remove existing refrigerant leak detection and monitoring system and replace with code compliant system with alarms and emergency Chiller Room Ventilation System6. Chiller Room HVAC System-Replace existing exhaust fan with new Chiller Room Ventilation Fan of 7500/11.500 cubic feet per min (CFM) with VFD to meet the air flow of normal/emergency ventilation7. Plumbing-Install cold-water isolation valve for each cooling tower supply8. Electrical and Low Voltage-Provide electrical power and low voltage system to all mechanical and plumbing equipment-New conduit and wiring shall be routed from the new cooling towers to the motor control center ?MCC? located inside the substation. The control requirements shall be powered from the existing 120/208V panel located inside the substation building9. Phasing-The project will be phased to minimize disruption to patient care.-Intent will be to work on two cells at a time to minimize downtime-Complete shut-down of the Chiller Plant shall be required to install the new 30? main condenser supply and return header10. Provide Commissioning

Posted: Aug. 6, 2025, 12:25 p.m. EDT
Posted: July 30, 2025, 6:48 p.m. EDT
Posted: July 24, 2025, 6:42 p.m. EDT
Posted: July 17, 2025, 6:53 p.m. EDT
Posted: July 16, 2025, 5:47 p.m. EDT
Posted: July 2, 2025, 11:16 a.m. EDT
Posted: June 25, 2025, 11:22 a.m. EDT
Posted: June 18, 2025, 4:36 p.m. EDT
Background
The U.S. Army Corps of Engineers (USACE), Los Angeles District, is issuing this solicitation for the upgrade of the Central Chiller Plant and DDC Controls at the Long Beach VA Medical Center (VAMC).

The goal of this contract is to enhance the facility's cooling systems to comply with the latest codes and VA standards, ensuring efficient operation and improved patient care.

Work Details
The contractor will be responsible for providing all materials and labor required for the following tasks:
1. Civil-Site demolition including removal of existing concrete mow curb, cobbles, concrete pavement, gravel ground cover, irrigation, and sod; installation of a new concrete sidewalk; raising an existing manhole to new finished grade.
2. Structural work includes supporting new chillers on existing concrete pads and constructing new foundations as needed.
3. Refurbishment of existing cooling towers and installation of a new packaged cooling tower with associated pumps and piping systems.
4. Replacement of existing chillers with new units and installation of primary and secondary chilled water pumps equipped with variable frequency drives (VFD).
5. Installation of a code-compliant refrigeration leak detection monitoring system in the chiller room.
6. Replacement of the chiller room HVAC system to meet ventilation requirements.
7. Plumbing work including installation of cold-water isolation valves for cooling towers.
8. Electrical work to provide power to all mechanical equipment with necessary conduit and wiring from cooling towers to the motor control center (MCC).
9. Phased project execution to minimize disruption to patient care by working on two cells at a time, requiring complete shutdown during certain installations.

Place of Performance
Long Beach VA Medical Center, Long Beach, California.

Overview

Response Deadline
Aug. 8, 2025, 4:00 p.m. EDT (original: July 18, 2025, 4:00 p.m. EDT) Past Due
Posted
June 18, 2025, 4:36 p.m. EDT (updated: Aug. 8, 2025, 6:11 p.m. EDT)
Set Aside
Small Business (SBA)
Place of Performance
5901 E. 7th St. Long Beach, CA 90822
Source

Current SBA Size Standard
$19 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
On 6/18/25 USACE Los Angeles District issued Solicitation W912PL25BA007 for Upgrade Central Chiller Plant and DDC Controls (Long Beach VA Campus) due 8/8/25. The opportunity was issued with a Small Business (SBA) set aside with NAICS 238220 (SBA Size Standard $19 Million) and PSC J041.
Primary Contact
Name
Cameron Stokes   Profile
Phone
None

Documents

Posted documents for Solicitation W912PL25BA007

Opportunity Assistant


AI Analysis

AI Generate

Opportunity Lifecycle

Procurement notices related to Solicitation W912PL25BA007

Award Notifications

Agency published notification of awards for Solicitation W912PL25BA007

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W912PL25BA007

Similar Active Opportunities

Open contract opportunities similar to Solicitation W912PL25BA007

Experts for Upgrade Central Chiller Plant and DDC Controls (Long Beach VA Campus)

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SPD > W075 ENDIST LOS ANGELES
FPDS Organization Code
2100-W912PL
Source Organization Code
100221424
Last Updated
Aug. 8, 2025
Last Updated By
cameron.stokes@usace.army.mil
Archive Date
July 16, 2026