Tyndall AFB Phase III Modular Building lease

ID: RFQ1523360 • Alt ID: W9127821R0093 • Type: Solicitation • Match:  90%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Do the documents mention an incumbent contractor?
Does this contract have any security clearance requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

This document provides the description of a requirement for modular buildings in support of the hurricane recovery effort at Tyndall Air Force Base (AFB). On 10 October 2018, Hurricane Michael made landfall at Mexico Beach just to the east of the base. Offerors are authorized to round up gross square feet based on standard, off the shelve sizes of office trailers/facilities as long as the minimum space for personnel under each requirement is met. Phase III facilities are indicated on each siting picture. A separate Utility Installation Contractor will be installing utilities up to a demarcation point adjacent to the locations of the buildings. The Modular Building Supplier will connect from the building to the point of demarcation. The Modular Contractor will be required to do routine maintenance and repair for the facilities. Maintenance and repair include such items as, but not limited to, manufacturer's required maintenance for HVAC systems, fixing a door lock which breaks, repairing or replacing floor tiles or carpet, etc. In addition, the contractor shall provide maintenance as needed for broken or worn-out items that are the result of normal wear and tear. - If a utility such as HVAC or electrical breaks the Contractor must have maintenance personnel on site, the same day to start working on the repair. - If a door lock malfunctions the Contractor must have maintenance personnel on site, the same day to repair. - If a finish item such as a floor tile or carpet needs to be replaced the Contractor must have maintenance personnel on site within three working days to repair. The Modular Contractor, in their proposal, will provide a plan to provide and replace keys to the facilities. The contractor shall provide maintenance of facilities in their lease pricing.

Overview

Response Deadline
Sept. 23, 2021 Past Due
Posted
Sept. 17, 2021
Set Aside
None
Place of Performance
Not Provided
Source

Current SBA Size Standard
750 Employees
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Signs of Shaping
The solicitation is open for 7 days, below average for the U.S. Army Corps of Engineers. 57% of similar contracts within the Department of the Army had a set-aside.
On 9/16/21 U.S. Army Corps of Engineers issued Solicitation RFQ1523360 for Tyndall AFB Phase III Modular Building lease due 9/23/21. The opportunity was issued full & open with NAICS 332311 and PSC 5410.

Documents

Posted documents for Solicitation RFQ1523360

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation RFQ1523360

Similar Active Opportunities

Open contract opportunities similar to Solicitation RFQ1523360