Turbine Rehabilitation & Generator Rewind, Norfork Powerhouse   5

ID: W9127S21R0001 • Type: Presolicitation • Match:  85%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Does this contract have any security clearance requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

PRE-SOLICITATION NOTICE
TURBINE REHABILITATION AND GENERATOR REWIND
NORFORK POWERHOUSE
WHITE RIVER BASIN, ARKANSAS
U.S. ARMY CORPS OF ENGINEERS (USACE)

W9127S21R0001, Turbine Rehabilitation and Generator Rewind at Norfork Powerhouse, will be advertised using Full and Open Competition under the North American Industrial Classification System (NAICS) Code 237990, Other Heavy and Civil Engineering Construction. The small business size standard is set at $39,500,000.
This solicitation will be issued utilizing FAR Part 15 as a Request for Proposals (RFP). Proposals will be evaluated via the Best Value Trade Off method and will result in a firm fixed-price construction contract. The Magnitude of Construction is between $25,000,000.00 and $75,000,000.00.
The requirement being procured under this solicitation includes the rehabilitation of turbine generator units 1 and 2 and shall include the replacement of the existing turbine runner and the rewind of its corresponding generator. The work will require the removal of the turbine runner and rewind of the generator, and replacement or rehabilitation of other components as required in the specifications. All design calculations, plans and specifications were performed by the Government; however, design for the replacement items is required to assure compatibility with all other components. There will be no design/alterations to the existing Government facility, unless specified in the construction contract.
The Norfork Power Plant is located on the Norfork River in Arkansas near the city of Salesville, AR. The original primary purposes of the Norfork project were for flood control and hydropower. The project started producing power online in 1944. There are two vertical axis, single cast, 17 bucket, Francis type turbines installed at the powerhouse each with a discharge diameter of 145.56 inches and synchronous speed of 128.6 RPM. The turbines were manufactured by the S. Morgan Smith Company with a rated output of 42,000 horsepower (31.32 MW) at rated head of 160 feet. The existing turbines have exceeded their expected design life.
W9127S21R0001 will be issued around September 29, 2021, via Government Point of Entry (GPE), www.sam.gov. Amendments to the solicitation will be issued via the GPE as well. It is each offeror's responsibility to download the solicitation and monitor the site for updates. Contractors may view and/or download this solicitation, its attachments, and any amendments after issuance by following the directions below:
Navigate to www.sam.gov; search for W9127S21R0001 under Contract Opportunities.
Offerors must be registered with the System for Award Management (SAM) in order to receive a Government contract award. Contractors may register for SAM at no cost to them at the following website: www.sam.gov.
The Contract Specialist for this solicitation will be Sarah Hagood. All questions/comments should be forwarded in writing to sarah.n.hagood@usace.army.mil or 501-324-5196.
All contractors are encouraged to visit SAM at www.sam.gov to view other business opportunities.

Overview

Response Deadline
Sept. 29, 2021, 1:00 p.m. EDT Past Due
Posted
Sept. 15, 2021, 2:49 p.m. EDT
Set Aside
None
Place of Performance
AR 72658 United States
Source

Current SBA Size Standard
$45 Million
Pricing
Fixed Price
Evaluation Criteria
Best Value
Est. Level of Competition
Average
Odds of Award
86%
On 9/15/21 USACE Little Rock District issued Presolicitation W9127S21R0001 for Turbine Rehabilitation & Generator Rewind, Norfork Powerhouse due 9/29/21. The opportunity was issued full & open with NAICS 237990 and PSC Z2QA.
Primary Contact
Name
Sarah N. Hagood   Profile
Phone
(501) 340-1277
Fax
(501) 324-5196

Secondary Contact

Name
Donald P. Tam   Profile
Phone
(501) 340-1223
Fax
None

Documents

Posted documents for Presolicitation W9127S21R0001

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Presolicitation W9127S21R0001

Award Notifications

Agency published notification of awards for Presolicitation W9127S21R0001

Contract Awards

Prime contracts awarded through Presolicitation W9127S21R0001

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Presolicitation W9127S21R0001

Similar Active Opportunities

Open contract opportunities similar to Presolicitation W9127S21R0001

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SWD > US ARMY ENGINEER DISTRICT LITTLE RO
FPDS Organization Code
2100-W9127S
Source Organization Code
100221423
Last Updated
Sept. 15, 2021
Last Updated By
sarah.n.hagood@usace.army.mil
Archive Date
Oct. 14, 2021