Posted: March 17, 2025, 12:29 p.m. EDT
17 March 2025
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Added/uploaded RFI responses.
No other changes.
==================================================================================
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Only the MAC BOA Holder GCs that attended Site Visit on 24 Feb 2025 will be able to continue forward toward the award.
Updated 13 March 2025
Project Solicitation Number: FA813725R0011
Project Title: WWYK21038 REPLACE DUCTWORK, B3001
Project Location: Tinker AFB - B3001 POST P39 and P37 to T37
Repair by replacement the corroded ductwork at project location within B3001 at Tinker Air Force Base (AFB) Oklahoma 73145
An Initial Site Visit was held on 24 February 2025 at 1;00pm CT. Only the MAC BOA Holder GCs that attended will be able to continue forward toward the award.
RFI were due by 28 February 2025, no additional RFI are to be submitted. Government responses will be posted once received..
***** Proposal due date is extended to 31 March 2025, 2 PM CST for this effort.
End of Update 13 March 2025
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Only the MAC BOA Holder GCs that attended Site Visit on 24 Feb 2025 will be able to continue forward toward the award.
Updated 25 February 2025
Project Solicitation Number: FA813725R0011
Project Title: WWYK21038 REPLACE DUCTWORK, B3001
Project Location: Tinker AFB - B3001 POST P39 and P37 to T37
Repair by replacement the corroded ductwork at project location within B3001 at Tinker Air Force Base (AFB) Oklahoma 73145
An Initial Site Visit was held on 24 February 2025 at 1;00pm CT. Only the MAC BOA Holder GCs that attended will be able to continue forward toward the award.
RFI are due by 2:00pm CT on 28 February 2025 and must be forwarded to the Contracting Officer and Contract Specialist assigned to this project.
Solicitation amendment FA813725R0011-0001 has been attached.
***** Proposal due date is extended to 17 March 2025, 2 PM CST for this effort.
Site Visit was conducted on 24 Feb 2025 and RFIs are due on 28 Feb 2025, 2 PM CST.
End of Update 25 February 2025
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Updated 25 February 2025
Project Solicitation Number: FA813725R0011
Project Title: WWYK21038 REPLACE DUCTWORK, B3001
Project Location: Tinker AFB - B3001 POST P39 and P37 to T37
Repair by replacement the corroded ductwork at project location within B3001 at Tinker Air Force Base (AFB) Oklahoma 73145
An Initial Site Visit was held on 24 February 2025 at 1;00pm CT. Only the MAC BOA Holder GCs that attended will be able to continue forward toward the award.
RFI are due by 2:00pm CT on 28 February 2025 and must be forwarded to the Contracting Officer and Contract Specialist assigned to this project.
The soliciation proposal due date of 03 March 2025 will be extended via a soliciation amendment once RFI Government Responses are available to be published.
End of Update 25 February 2025
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Project Solicitation Number: FA813725R0011
Project Title: WWYK21038 REPLACE DUCTWORK, B3001
Project Location: Tinker AFB - B3001 POST P39 and P37 to T37
Repair by replacement the corroded ductwork at project location within B3001 at Tinker Air Force Base (AFB) Oklahoma 73145
Project specific documents are attached to this posting.
If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses.
Currently, the Solicitation Request for Proposal (RFP) is ATTACHED.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. After receipt of your RSVP and EAL if required, an MS Outlook meeting invite will be coordinated and will be forwarded stating the date and time of the Initial Site Visit.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Only the MAC BOA Holder GCs that attended Site Visit on 24 Feb 2025 will be able to continue forward toward the award.
Posted: March 13, 2025, 9:27 a.m. EDT
Posted: March 13, 2025, 7:50 a.m. EDT
Posted: Feb. 25, 2025, 2:27 p.m. EST
Posted: Feb. 25, 2025, 11:11 a.m. EST
Posted: Feb. 7, 2025, 3:21 p.m. EST
Background
The contract is issued by Tinker Air Force Base (AFB) with the project title WWYK21038, which focuses on replacing corroded ductwork at specific posts within B3001.
The mission of Tinker AFB is to maintain and enhance the operational readiness of the U.S. Air Force, and this project aims to ensure the integrity and functionality of its facilities.
Work Details
The contractor is required to furnish all materials, labor, tools, transportation, equipment, testing services, quality control, and incidentals necessary for the replacement of corroded ductwork at Post P39 and Post P37 to Post T37 within B3001 at Tinker AFB.
The contractor must conduct a site investigation to verify existing conditions and may access additional as-built drawings from 72 ABW/CE - Engineering Support located in B400. The contractor is responsible for identifying all logistical, architectural, and structural work elements needed to complete the project as described in the Statement of Work (SOW). This includes providing any assemblies or fixtures not explicitly identified in the project documents to ensure a fully operational system.
Period of Performance
The contract period of performance is from April 14, 2025, to October 13, 2025.
Place of Performance
The construction projects will be performed at Tinker Air Force Base located in Oklahoma.