Search Contract Opportunities

Third Port Improvements Project located in Ft. Eustis, VA.   4

ID: W9123622B2017 • Type: Presolicitation • Match:  100%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Loading

Description

The Norfolk District, Corps of Engineers is contemplating a firm-fixed-price contract for the 3rd Port Improvements project sponsored by Joint Base Langley-Eustis. The main objective of the project is to remove three existing piers and replace with three new piers that will accommodate five new vessels, MSV (L), to replace deteriorating bulkheads from pier 8 through pier 14, where the new finger piers will be located, remove a mooring pile line located along the northern edge of the current maintenance dredging prism and re-align the line further east, away from encroaching land, and dredge in the area if the new finger piers and mooring pile lines. The utilities for the vessels will be updated as well to accommodate the requirements of the new vessels. The new utility work will include new sanitary sewer (SS) lines from the new pier locations over to the nearest SS manhole, new bilge lines that will run from the new pier locations up to an existing holding tank, and new electrical distribution lines and transformers will be required to provide shore power to the new vessels. Dredging of the creek bottom in the finger piers to a depth of 17 feet will be required. Up to one (1) foot of over depth will be allowed. Dredging shall be accomplished by mechanical and/or hydraulic means and methods with dredged material hydraulically placed by pipeline into the nearby upland placement site, Fort Eustis Dredged Material Management Area (FEDMMA).

Background
The Norfolk District, Corps of Engineers is contemplating a firm-fixed-price contract for the 3rd Port Improvements project sponsored by Joint Base Langley-Eustis. The main objective of the project is to remove three existing piers and replace with three new piers that will accommodate five new vessels, MSV (L), to replace deteriorating bulkheads from pier 8 through pier 14, where the new finger piers will be located, remove a mooring pile line located along the northern edge of the current maintenance dredging prism and re-align the line further east, away from encroaching land, and dredge in the area if the new finger piers and mooring pile lines. The utilities for the vessels will be updated as well to accommodate the requirements of the new vessels. The new utility work will include new sanitary sewer (SS) lines from the new pier locations over to the nearest SS manhole, new bilge lines that will run from the new pier locations up to an existing holding tank, and new electrical distribution lines and transformers will be required to provide shore power to the new vessels.
Dredging of the creek bottom in the finger piers to a depth of 17 feet will be required. Up to one (1) foot of over depth will be allowed. Dredging shall be accomplished by mechanical and/or hydraulic means and methods with dredged material hydraulically placed by pipeline into the nearby upland placement site, Fort Eustis Dredged Material Management Area (FEDMMA).

Work Details
The construction tasks include removing and replacing piers, dredging, updating utilities for vessels, including sanitary sewer lines, bilge lines, and electrical distribution lines. The dredging of the creek bottom in the finger piers to a depth of 17 feet is also required.

Period of Performance
Approximately 365 calendar days from the issuance of Notice to Proceed (NTP).

Place of Performance
Fort Eustis, VA

Overview

Response Deadline
June 28, 2022, 9:00 a.m. EDT Past Due
Posted
June 13, 2022, 7:59 a.m. EDT
Set Aside
None
Place of Performance
Fort Eustis, VA 23604 USA
Source

Current SBA Size Standard
$45 Million
Pricing
Fixed Price
Odds of Award
66%
On 6/13/22 USACE Norfolk District issued Presolicitation W9123622B2017 for Third Port Improvements Project located in Ft. Eustis, VA. due 6/28/22. The opportunity was issued full & open with NAICS 237990 and PSC Y1KF.
Primary Contact
Name
Dariya M. Walker   Profile
Phone
(757) 201-7748

Secondary Contact

Name
Nicholas Lizotte   Profile
Phone
(757) 201-7310

Documents

Posted documents for Presolicitation W9123622B2017

Opportunity Assistant

Opportunity Lifecycle

Procurement notices related to Presolicitation W9123622B2017

Award Notifications

Agency published notification of awards for Presolicitation W9123622B2017

Contract Awards

Prime contracts awarded through Presolicitation W9123622B2017

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Presolicitation W9123622B2017

Similar Active Opportunities

Open contract opportunities similar to Presolicitation W9123622B2017

Experts for Third Port Improvements Project located in Ft. Eustis, VA.

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > NAD > W2SD ENDIST NORFOLK
FPDS Organization Code
2100-W91236
Source Organization Code
100221786
Last Updated
June 13, 2022
Last Updated By
nicholas.lizotte@usace.army.mil
Archive Date
Sept. 30, 2022