Solicitation for Grissom Air Reserve Base Runways Project   3

ID: W912QR22R0020 • Type: Solicitation
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Does this contract have any security clearance requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

Posted: March 2, 2022, 8:51 a.m. EST

****AMDT 0007 is hereby posted.****

AMDT 0003 04 February 2022 - The link for this solicitation oppotunrity in the Procurement Integrated Enterprise Enviornment (PIEE) is: https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912QR22R0020

This project is a renovation of approximate total mill and overlay is 3,290,000 square feet and approximate total full depth replacement is 471,000 square feet of PCC. The proposed project includes: Repair throats at Taxiway C to full depth. Conduct a repair of the north and south Taxiway C throats by removing all layers of pavement at full depth to subgrade and replace with Portland cement concrete (PCC). Repair Taxiway G sections. Remove the asphalt over Portland cement concrete (APC) at full depth to subgrade and replace with Portland cement concrete. Repair full length of Runway 12,501ft using mill and overlay and full depth PCC methods as designed. Variable Mill of surface and overlay with asphalt concrete (AC). Repair 1,200LF to full depth with PCC. Repair shoulders for the entire length of the runway (12,501ft) by variable milling of surface and overlaying with asphalt concrete. Repair the asphalt concrete paved overruns at the 23 and 05 ends of the runway by milling the surface and overlaying with asphalt concrete. Repair by replacement of airfield lighting circuits the (1) complete approach system for runway 05 (2) the threshold light bar at the end of runway 23 (3) feeder cables from home runs at both 23 and 05 ends (4) Taxiway G edge lighting (5) airfield guidance sign system.

Posted: Feb. 24, 2022, 11:26 a.m. EST
Posted: Feb. 11, 2022, 9:15 a.m. EST
Posted: Feb. 4, 2022, 2:40 p.m. EST
Posted: Jan. 14, 2022, 10:12 a.m. EST
Posted: Jan. 7, 2022, 2:31 p.m. EST
Posted: Dec. 16, 2021, 3:39 p.m. EST
Background
The solicitation is for a renovation project at Grissom Air Reserve Base, involving repair and replacement of various sections of the airfield, including taxiways, runways, and shoulders. The project also includes the repair of airfield lighting circuits and guidance sign systems.

Work Details
The project involves the renovation of approximately 3,290,000 square feet through mill and overlay methods and approximately 471,000 square feet through full-depth replacement with Portland cement concrete (PCC). Specific tasks include repairing throats at Taxiway C to full depth, repairing sections of Taxiway G by removing asphalt over PCC at full depth to subgrade and replacing with PCC, repairing the full length of Runway 12,501ft using mill and overlay and full depth PCC methods as designed, variable milling of surface and overlay with asphalt concrete (AC), repairing shoulders for the entire length of the runway by variable milling of surface and overlaying with asphalt concrete, repairing the asphalt concrete paved overruns at the 23 and 05 ends of the runway by milling the surface and overlaying with asphalt concrete, and replacing airfield lighting circuits for various components including approach systems for runway 05, threshold light bar at the end of runway 23, feeder cables from home runs at both ends, Taxiway G edge lighting, and airfield guidance sign system.

Period of Performance
The effective date of the amendment is 02-MAR-2022. The period of performance for the contract is not explicitly provided in the given text.

Place of Performance
The place of performance for this construction project is Grissom Air Reserve Base.

Overview

Response Deadline
March 4, 2022, 1:00 p.m. EST (original: Feb. 28, 2022, 1:00 p.m. EST) Past Due
Posted
Dec. 16, 2021, 3:39 p.m. EST (updated: March 2, 2022, 8:51 a.m. EST)
Set Aside
None
Place of Performance
Grissom ARB, IN United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
On 12/16/21 USACE Louisville District issued Solicitation W912QR22R0020 for Solicitation for Grissom Air Reserve Base Runways Project due 3/4/22. The opportunity was issued full & open with NAICS 237310 and PSC Z2BD.
Primary Contact
Name
Morgan K. Strong   Profile
Phone
(502) 315-6210

Documents

Posted documents for Solicitation W912QR22R0020

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Solicitation W912QR22R0020

Award Notifications

Agency published notification of awards for Solicitation W912QR22R0020

Contract Awards

Prime contracts awarded through Solicitation W912QR22R0020

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W912QR22R0020

Similar Active Opportunities

Open contract opportunities similar to Solicitation W912QR22R0020

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > LRD > US ARMY ENGINEER DISTRICT LOUISVILL
FPDS Organization Code
2100-W912QR
Source Organization Code
100221425
Last Updated
March 19, 2022
Last Updated By
levi.r.speth@usace.army.mil
Archive Date
March 19, 2022