SLAC CUIR Subproject 1 – Master Substation Design Services Sources Sought Notification

ID: RFP_359773_SLAC_CUIR_Subproject_1_Master_Substation_Design • Type: Sources Sought • Match:  85%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Draft a sources sought response template for this opportunity
Do the documents mention an incumbent contractor?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

DESCRIPTION

This is a Sources Sought Notice to identify Architectural and Engineering (A&E) firms to provide professional services for the Critical Utilities Infrastructure Revitalization (CUIR), Subproject 1. This is not a solicitation for proposal or quotations and no award will be made from this Notice. Instead, the purpose of this sources sought notice is to identify interested vendors for the upcoming formal solicitation, tentatively planned to be released in Fall 2025.

BACKGROUND

The purpose of the Critical Utilities Infrastructure Revitalization (CUIR) Project is to modernize utility infrastructure to provide reliable and sustainable operations, enabling SLAC National Accelerator Laboratory (SLAC) to remain mission-ready and enhance the impact of Department of Energy (DOE) scientific programs. Select buildings and electrical infrastructure within the Master Substation located south of Sector 30 of SLAC's Linear Accelerator were installed in the 1960s as part of the original laboratory construction. These existing infrastructure require upgrades and replacement in order to support SLAC's science research today and in the future.

PLANNED SCOPE AND DESCRIPTION OF SERVICES

SLAC is seeking the services of a qualified Architectural & Engineering (A&E) design firm to complete the scope in the attached Statement of Work (SOW), which includes developing and providing a final design package, Issued for Construction (IFC) set of drawings and specifications, as well as construction cost and schedule estimates. The attached SOW includes the following base and optional scopes:

  • Base Scope Master Substation Expansion Professional Services
  • Optional Scope 1 230kV Transformer Replacement Professional Services
  • Optional Scope 2 Master Substation Expansion Construction Support
  • Optional Scope 3 230kV Transformer Replacement Construction Support

The draft SOW, draft Statement of Qualifications (SOQ) and relevant references are provided. These draft documents provided are subject to change. SLAC intends to issue a formal solicitation with final documents later based on responses from this Source Sought Notice.

SOURCES SOUGHT RESPONSE

Interested A&E firms with the skills and capability to complete the above scopes are invited to submit a written response to this Sources Sought Notice. Please provide the following information:

  1. Provide firm's name, year of establishment, ownership type (private, public, etc.).
  2. Provide firm's local office location within in the 10 bay area counties (Santa Clara County, San Mateo County, San Francisco County, Alameda County, Contra Costa County, Marin County, Napa County, Sonoma County, Solano County or Santa Cruz County). Include the local office address, main phone number and main email. Include the firm's DUNS number (DUNS number must be location specific).
  3. Provide primary Point-Of-Contact name, title, phone number (direct and mobile), email address.
  4. Provide a two-page capability statement presenting firm's services and a list of past project experience on electrical designs completed for a public agency located within the State of California.

Please provide your response to Quyen Weng at quyen@slac.stanford.edu by 5 pm PST on September 08, 2025

SOURCES SOUGHT DISCLAIMER:

Please note that any responses to this sources sought posting is purely on a voluntary basis. SLAC is not requesting a proposal, any pricing, or any other information that could be considered confidential or proprietary to be submitted in response to this posting or any part of this posting. Any submissions that contain pricing, proprietary information, or confidential information will be discarded by SLAC.

Background
The Critical Utilities Infrastructure Revitalization (CUIR) Project aims to modernize utility infrastructure at the SLAC National Accelerator Laboratory (SLAC) to ensure reliable and sustainable operations. This initiative is crucial for maintaining SLAC's mission readiness and enhancing the impact of Department of Energy (DOE) scientific programs.

The existing electrical infrastructure, installed in the 1960s, requires upgrades to support current and future scientific research needs.

Work Details
SLAC is seeking a qualified Architectural & Engineering (A&E) design firm to provide professional services for the Master Substation Expansion and related projects. The scope includes:
- Base Scope: Master Substation Expansion Professional Services, which involves developing a final design package, Issued for Construction (IFC) drawings, specifications, and construction cost estimates.
- Optional Scope 1: 230kV Transformer Replacement Professional Services, requiring operational transformers during replacement.
- Optional Scope 2: Master Substation Expansion Construction Support during the construction phase.
- Optional Scope 3: 230kV Transformer Replacement Construction Support. Specific tasks include site visits, design of new electrical components, coordination with SLAC, preparation of design submittals at various milestones (60%, 90%, and 100%), and participation in design reviews.

Period of Performance
The contract will be performed over multiple phases starting from December 2025 for the base scope, with subsequent optional scopes awarded based on completion timelines extending into late 2028.

Place of Performance
The work will be conducted at the SLAC National Accelerator Laboratory located in Menlo Park, California.

Overview

Response Deadline
Sept. 8, 2025, 8:00 p.m. EDT Due in 4 Days
Posted
Aug. 29, 2025, 4:16 p.m. EDT (updated: Aug. 29, 2025, 6:12 p.m. EDT)
Set Aside
None
PSC
None
Place of Performance
Menlo Park, CA 94025 United States
Source

Current SBA Size Standard
$25.5 Million
Pricing
Multiple Types Common
Evaluation Criteria
Best Value
Est. Level of Competition
Low
Odds of Award
19%
On 8/29/25 Department of Energy issued Sources Sought RFP_359773_SLAC_CUIR_Subproject_1_Master_Substation_Design for SLAC CUIR Subproject 1 – Master Substation Design Services Sources Sought Notification due 9/8/25. The opportunity was issued full & open with NAICS 541330.
Primary Contact
Name
Quyen Weng   Profile
Phone
None

Documents

Posted documents for Sources Sought RFP_359773_SLAC_CUIR_Subproject_1_Master_Substation_Design

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Sources Sought RFP_359773_SLAC_CUIR_Subproject_1_Master_Substation_Design

Similar Active Opportunities

Open contract opportunities similar to Sources Sought RFP_359773_SLAC_CUIR_Subproject_1_Master_Substation_Design

Additional Details

Source Agency Hierarchy
ENERGY, DEPARTMENT OF > ENERGY, DEPARTMENT OF > SLAC Natl Accel Lab -DOE Contractor
FPDS Organization Code
8900-899040
Source Organization Code
500046233
Last Updated
Aug. 29, 2025
Last Updated By
doreen.agbayani@science.doe.gov
Archive Date
Sept. 8, 2025