Search Contract Opportunities

SLAC CUIR SP2 – Topographic Survey and Utility Mapping Services Sources Sought Notification

ID: SLAC_RFP_364558 • Type: Sources Sought • Match:  90%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading

Description

DESCRIPTION

This is a Sources Sought Notice to identify consultants to provide necessary professional design services to perform topographic surveys and underground utility mapping services for Subproject 2 of the Critical Utilities Infrastructure Revitalization (CUIR) Project. This is not a solicitation for proposal or quotations and no award will be made from this Notice. SLAC intends to issue a formal solicitation later based on responses from this Source Sought Notice.

BACKGROUND

The Critical Utilities Infrastructure Revitalization (CUIR) Project is a capital improvement initiative to modernize SLAC's utilities infrastructure. Many utility systems at SLAC were installed in the 1960s and have exceeded their expected service life, posing potential risks to safety, facility operations, and regulatory compliance.

CUIR's Subproject 2 (SP2) focuses on replacing wet utility systems in strategic locations within the SLAC campus. Improvements to potable water, sanitary sewer, and storm sewer infrastructure are currently in the design development phase.

PLANNED SCOPE AND DESCRIPTION OF SERVICES

SLAC is seeking a qualified subcontractor to perform topographic surveys and underground utility mapping services in support of the detailed design of SP2. The purpose of these services is to provide accurate, field-verified data on site terrain, surface features, and underground utilities to support informed design decisions, site layout, drainage planning, utility coordination, utility replacement/rehabilitation, and advancement of the design to the 60% milestone and eventually to a constructable set of drawings.

SOURCES SOUGHT RESPONSE

Interested firms with the skills and capability to complete the above scopes are invited to submit a written response to this Sources Sought Notice. Please provide the following information:

  1. Firm's name
  2. Name, telephone number, and email address of a company point of contact who has the authority and knowledge to clarify responses

Please provide your response to Quyen Weng at quyen@slac.stanford.edu by 5 pm PST on May 8, 2026.

SOURCES SOUGHT DISCLAIMER:

Please note that any responses to this sources sought posting is purely on a voluntary basis. SLAC is not requesting a proposal, any pricing, or any other information that could be considered confidential or proprietary to be submitted in response to this posting or any part of this posting. Any submissions that contain pricing, proprietary information, or confidential information will be discarded by SLAC.

Background
The Critical Utilities Infrastructure Revitalization (CUIR) Project is a capital improvement initiative aimed at modernizing the utilities infrastructure at SLAC National Accelerator Laboratory. Many of the utility systems were installed in the 1960s and have surpassed their expected service life, which poses potential risks to safety, facility operations, and regulatory compliance.

Subproject 2 (SP2) specifically focuses on replacing wet utility systems in strategic locations within the SLAC campus, with current improvements to potable water, sanitary sewer, and storm sewer infrastructure in the design development phase.

Work Details
SLAC is seeking a qualified subcontractor to perform topographic surveys and underground utility mapping services in support of the detailed design of SP2. The services required include:
- Providing accurate, field-verified data on site terrain and surface features;
- Mapping underground utilities;
- Supporting informed design decisions;
- Assisting in site layout and drainage planning;
- Coordinating utilities;
- Facilitating utility replacement/rehabilitation;
- Advancing the design to the 60% milestone leading to a constructable set of drawings.

Place of Performance
The contract will be performed at SLAC National Accelerator Laboratory located at 2575 Sand Hill Road, Menlo Park, California.

Overview

Response Deadline
May 8, 2026, 8:00 p.m. EDT Due in 2 Days
Posted
May 1, 2026, 5:18 p.m. EDT
Set Aside
None
NAICS
None
PSC
None
Place of Performance
Menlo Park, CA 94025 United States
Source

Est. Level of Competition
Average
Odds of Award
19%
Signs of Shaping
The solicitation is open for 7 days, below average for the Department of Energy.
On 5/1/26 Department of Energy issued Sources Sought SLAC_RFP_364558 for SLAC CUIR SP2 – Topographic Survey and Utility Mapping Services Sources Sought Notification due 5/8/26.
Primary Contact
Name
Quyen Weng   Profile
Phone
None

Documents

Posted documents for Sources Sought SLAC_RFP_364558

Opportunity Assistant


AI Analysis

AI Generate

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Sources Sought SLAC_RFP_364558

Similar Active Opportunities

Open contract opportunities similar to Sources Sought SLAC_RFP_364558

Experts for SLAC CUIR SP2 – Topographic Survey and Utility Mapping Services Sources Sought Notification

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
ENERGY, DEPARTMENT OF > ENERGY, DEPARTMENT OF > SLAC Natl Accel Lab -DOE Contractor
FPDS Organization Code
8900-899040
Source Organization Code
500046233
Last Updated
May 1, 2026
Last Updated By
catharina.bjelovitic@science.doe.gov
Archive Date
May 23, 2026