Search Contract Opportunities

Shell Falls Primary Power

ID: 1240LT26Q0038 • Type: Synopsis Solicitation • Match:  90%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading

Description

Shell Falls Primary Power

The project requires the contractor to be responsible for supplying all labor, materials, equipment, miscellaneous items, freight, delivery, and all necessary valid licenses and permits required to complete the improvements at the Bighorn National Forest, Shell Falls Wayside addressing the site s primary power supply. This project aims to address on-site generated power, wastewater system revisions and water system reinstallation IAW the Statement of Work, drawings and applicable specifications.

NAICS:237990. NAICS Small Business Size Standard: $45M

Magnitude of Construction is between $1,000,000 and $5,000,000

This is solicited 100% Small Business

Organized Site Visit
Name: Christopher Wolffing
Address: Approximately 26 miles east of Greybull, and 69 miles west of Sheridan, along U.S.
Highway 14 in Bighorn County, Wyoming. The site legal description is the East 1 2 Section 7, T53N,
R89W.
Date and Time: April 1, 2026, 10:00 AM Mountain
Telephone: 307-674-2647
Email: Christopher.wolffing@usda.gov

Questions shall be submitted via email to erick.plamann@usda.gov and are due no later than April 8, 2026, at 12:00 PM Central Time. No other means will be accepted

Background
The Shell Falls Primary Power project is initiated by the U.S. Forest Service (USFS) to improve the primary power supply at the Bighorn National Forest, specifically at the Shell Falls Wayside. The project aims to enhance on-site generated power, revise the wastewater system, and reinstall the water system in accordance with the Statement of Work, drawings, and applicable specifications.

Work Details
The contractor will be responsible for supplying all labor, materials, equipment, miscellaneous items, freight, delivery, and all necessary valid licenses and permits required to complete improvements at the site. The specific tasks include:
- Addressing on-site generated power systems
- Revising wastewater systems
- Reinstalling water systems
All work must comply with the provided Statement of Work and applicable specifications.

Period of Performance
The estimated period of performance for this contract is 540 days after receiving the Notice to Proceed (NTP).

Place of Performance
The construction projects will be performed at Bighorn National Forest, Shell Falls Wayside, located approximately 26 miles east of Greybull and 69 miles west of Sheridan along U.S. Highway 14 in Bighorn County, Wyoming.

Overview

Response Deadline
May 4, 2026, 1:00 p.m. EDT (original: April 20, 2026, 1:00 p.m. EDT) Past Due
Posted
March 23, 2026, 12:05 p.m. EDT (updated: April 27, 2026, 8:38 a.m. EDT)
Set Aside
Small Business (SBA)
Place of Performance
Greybull, WY 82426 United States
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Est. Value Range
$1,000,000 - $5,000,000 (value based on agency estimated range)
On 3/23/26 USFS Region 2: Rocky Mountain Region issued Synopsis Solicitation 1240LT26Q0038 for Shell Falls Primary Power due 5/4/26. The opportunity was issued with a Small Business (SBA) set aside with NAICS 237990 (SBA Size Standard $45 Million) and PSC Y1JZ.
Primary Contact
Name
Erick Plamann   Profile
Phone
None

Secondary Contact

Name
Lucas Dahlman   Profile
Phone
None

Additional Contacts in Documents

Title Name Email Phone
None Christopher Wolffing Profile christopher.wolffing@usda.gov None

Documents

Posted documents for Synopsis Solicitation 1240LT26Q0038

Opportunity Assistant


AI Analysis

AI Generate

Incumbent or Similar Awards

Contracts Similar to Synopsis Solicitation 1240LT26Q0038

Potential Bidders and Partners

Awardees that have won contracts similar to Synopsis Solicitation 1240LT26Q0038

Similar Active Opportunities

Open contract opportunities similar to Synopsis Solicitation 1240LT26Q0038

Experts for Shell Falls Primary Power

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
AGRICULTURE, DEPARTMENT OF > FOREST SERVICE > BIGHORN NATIONAL FOREST
FPDS Organization Code
12C2-8538
Source Organization Code
100163012
Last Updated
April 27, 2026
Last Updated By
erick.plamann@usda.gov
Archive Date
May 19, 2026