Search Contract Opportunities

Saylorville Control Tower Sluice Gate Project

ID: W912EK23B0007 • Type: Solicitation • Match:  100%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Does this contract have any security clearance requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

Posted: Sept. 11, 2023, 1:44 p.m. EDT

The work includes but is not limited to replace the main lifting mechanisms of the 4 gates along with fabrication and installation of 4 new gates. Major components to be replaced include wire rope, sheaves, sheave, bushings, sheave shafts and replacing the pillow block bearings. Minor components associated with these items are also replaced as required. The gear reducer is rehabbed by replacing seals, bearings, and gearbox fluid. The wire rope drum is cleaned and reused, and the motor is reused. The Electrical replacement requirements for this project are installation of new permanent LED light fixtures that will illuminate the operating floor EL 880.0 Feet for each service gate slot and each emergency gate slot. The main activities are dogging-off gates and inspecting each gate as is rises through its lower slot, and the removal of existing interior original light fixtures that illuminate EL. 913.0 Feet and to replace them with new LED light fixtures and lastly the removal of existing outdoor control tower light fixtures installed at the roof elevation at the parapet walls. The replace of the railing at the wells will be changed from angled steel to replace with speed rails. There will also be a need for installation of catwalk, to inspect the lifting sleeves in the future.

This action is Unrestricted Invittion for Bid.

See attached Solicitation, Plans, Drawing and Specification for details:

Posted: Aug. 25, 2023, 10:32 a.m. EDT
Posted: Aug. 16, 2023, 2:53 p.m. EDT
Posted: Aug. 16, 2023, 12:07 p.m. EDT
Posted: Aug. 10, 2023, 12:48 p.m. EDT
Posted: Aug. 9, 2023, 2:40 p.m. EDT
Posted: Aug. 3, 2023, 9:32 a.m. EDT
Posted: July 28, 2023, 1:23 p.m. EDT
Posted: July 28, 2023, 9:13 a.m. EDT
Posted: July 27, 2023, 3:43 p.m. EDT
Background
The solicitation is for the Saylorville Lake Control Tower Sluice Gate project, which involves the replacement of the main lifting mechanisms of the 4 gates along with fabrication and installation of 4 new gates. The project is an Unrestricted Invitation for Bid.

Work Details
The work includes replacing major components such as wire rope, sheaves, sheave bushings, sheave shafts, pillow block bearings, and rehabbing the gear reducer by replacing seals, bearings, and gearbox fluid. It also involves electrical replacement requirements including installation of new permanent LED light fixtures.
Safety lockout/tagout procedures and fall hazard protection and prevention program are specified. The Environmental Protection Plan (EPP) outlines measures to protect natural and cultural resources, required reports, and other environmental protection measures. The plan also includes general site information, management of natural resources, protection of historical and archaeological resources, waste management report, facility hazardous waste generator status, stormwater requirements, materials specifications for anchors and equipment specifications.

Period of Performance
The performance period is 730 calendar days to begin after receiving the notice to proceed.

Place of Performance
Saylorville Lake Control Tower in Rock Island IL 61201

Overview

Response Deadline
Sept. 11, 2023, 11:00 a.m. EDT (original: Aug. 25, 2023, 11:00 a.m. EDT) Past Due
Posted
July 27, 2023, 3:43 p.m. EDT (updated: Sept. 11, 2023, 1:44 p.m. EDT)
Set Aside
None
Place of Performance
Johnston, IA 50131 United States
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
On 7/27/23 USACE Rock Island District issued Solicitation W912EK23B0007 for Saylorville Control Tower Sluice Gate Project due 9/11/23. The opportunity was issued full & open with NAICS 237990 and PSC Z1KA.
Primary Contact
Name
Stanley L. Bolton   Profile
Phone
None

Secondary Contact

Name
Ryan R. Larrison   Profile
Phone
None

Documents

Posted documents for Solicitation W912EK23B0007

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Contract Awards

Prime contracts awarded through Solicitation W912EK23B0007

Incumbent or Similar Awards

Contracts Similar to Solicitation W912EK23B0007

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W912EK23B0007

Similar Active Opportunities

Open contract opportunities similar to Solicitation W912EK23B0007

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > MVD > W07V ENDIST ROCK ISLAND
FPDS Organization Code
2100-W912EK
Source Organization Code
100221368
Last Updated
Sept. 26, 2023
Last Updated By
stanley.l.bolton@usace.army.mil
Archive Date
Sept. 26, 2023