Savannah Harbor Expansion Project (SHEP) 14A Dike Raising and Weir Improvements   3

ID: W912HN24B5004 • Type: Solicitation

Description

Posted: July 31, 2024, 9:55 a.m. EDT

The abstract is posted as of 31 July 2024. Amendment 4 amends the specifications and extends the date bids are due from 24 July 2024 at 12:00 pm to 25 July 2024 at 1200 pm. Amendment 3 amends specifications and drawings. Amendment 0002 extends the date bids are due from 17 July 2024 at 12:00 pm to 24 July 2024 at 12:00 pm. Amendment 0001 to include a site visit on 20 June 2024 at 10:00 am. Savannah Harbor Expansion Project (SHEP) 14A Dike Raising and Weir Improvements - The existing back dike currently spans a length of approximately 11,000 feet and has a crest elevation ranging from about 27 to 29 feet mean lower low water (MLLW). The back dike will be raised to a uniform elevation of 33 feet MLLW. The existing front dike currently spans a length of approximately 6,400 feet and has a crest elevation ranging from about 25 to 27 feet MLLW. The front dike will be raised to a uniform elevation of 31 feet MLLW to gain additional capacity for containment of Savannah Harbor dredged material. Approximately 231,000 cubic yards of borrow material from the adjacent 14B DMCA will be required for the raising of the back dike and approximately 65,000 cubic yards for the front dike. Additional borrow materials from the adjacent 14B DMCA may be needed. Weir modifications for weirs 14A1, 14A2, and 14A3 are anticipated, as well as resetting the abutment on cross-dike weir 14A/B. The borrow material consists of dredge materials from the Savannah River. The dike construction will be performed to the inside of the existing dike crest and slope. Additional project requirements include clearing, grassing, and erosion control provisions.

Posted: July 23, 2024, 9:19 a.m. EDT
Posted: July 18, 2024, 5:00 p.m. EDT
Posted: July 17, 2024, 11:53 a.m. EDT
Posted: July 3, 2024, 3:22 p.m. EDT
Posted: June 28, 2024, 4:19 p.m. EDT
Posted: June 21, 2024, 5:57 p.m. EDT
Posted: June 17, 2024, 4:44 p.m. EDT
Posted: June 13, 2024, 3:44 p.m. EDT
Posted: June 6, 2024, 5:47 p.m. EDT

Overview

Response Deadline
July 25, 2024, 12:00 p.m. EDT (original: July 17, 2024, 12:00 p.m. EDT) Past Due
Posted
June 6, 2024, 5:47 p.m. EDT (updated: July 31, 2024, 9:55 a.m. EDT)
Set Aside
Small Business (SBA)
Place of Performance
Not Provided
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Signs of Shaping
78% of obligations for similar contracts within the Department of the Army were awarded full & open.
On 6/6/24 USACE Savannah District issued Solicitation W912HN24B5004 for Savannah Harbor Expansion Project (SHEP) 14A Dike Raising and Weir Improvements due 7/25/24. The opportunity was issued with a Small Business (SBA) set aside with NAICS 237990 (SBA Size Standard $45 Million) and PSC Z1KF.
Primary Contact
Name
Amy Collins   Profile
Phone
(912) 652-5505

Secondary Contact

Name
Glenda Canty   Profile
Phone
(912) 652-5030

Documents

Posted documents for Solicitation W912HN24B5004

Question & Answer

Opportunity Lifecycle

Procurement notices related to Solicitation W912HN24B5004

Award Notifications

Agency published notification of awards for Solicitation W912HN24B5004

Contract Awards

Prime contracts awarded through Solicitation W912HN24B5004

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W912HN24B5004

Similar Active Opportunities

Open contract opportunities similar to Solicitation W912HN24B5004

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SAD > US ARMY ENGINEER DISTRICT SAVANNAH
FPDS Organization Code
2100-W912HN
Source Organization Code
100074192
Last Updated
July 31, 2024