Sacramento River Erosion (SRE) C5 Pioneer Bridge Levee Improvements   2

ID: W9123825BA002 • Type: Solicitation • Match:  90%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Does this contract have any security clearance requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

Posted: April 25, 2025, 6:27 p.m. EDT

See attached Bid Abstract

AMENDMENT 0002 - update the Technical Specifications Section 01 50 00, paragraph 2.2.2.1 (c) and include the date, time, and teams link for the bid opening.AMENDMENT 0001 - replaced specifications in its entirety and updated wage determination. Project is design-bid-build construction services to construct levee improvements at Sacramento River Erosion (SRE) Site 1, located under the I-80 Pioneer Bridge in Sacramento, California (CA). The project is anticipated to reduce the risk of levee failure from an erosion related levee breach for approximately 1,000 feet along the Sacramento River. The project is anticipated to include several erosion protection measures located above and below the average low flow water surface elevation (~7 feet NAVD88 as defined) using rock bank protection to include a 3.5-foot-thick lens of launchable Graded Stone C below the water surface to protect the bank from scour and erosion as well as Graded Stone C extended above the water surface to the top of the bank under the Pioneer Bridge section. The project is anticipated to include a 3.5-foot-thick lens of soil-rock mix above the water surface to protect the bank from wave wash generated by boat wakes and wind waves, demolition and removal of the existing upper bank material under the I-80 Pioneer Bridge section to provide a suitable foundation for the Graded Stone C, and In-stream Woody Material (IWM) to be placed below the water line to create in-stream cover for fisheries throughout the seasons and provide flow deflection along the bank. Work shall be completed by barge.

Posted: April 18, 2025, 5:20 p.m. EDT
Posted: April 3, 2025, 5:14 p.m. EDT
Posted: April 2, 2025, 12:56 p.m. EDT
Posted: March 21, 2025, 2:22 p.m. EDT
Posted: March 20, 2025, 8:45 p.m. EDT
Background
The contract is issued for the Sacramento River Erosion (SRE) C5 Pioneer Bridge Levee Improvements project, which aims to enhance levee stability and reduce the risk of failure due to erosion. The project is located under the I-80 Pioneer Bridge in Sacramento, California, and is part of efforts to protect approximately 1,000 feet of levee along the Sacramento River.

The improvements are critical for maintaining the integrity of the levee system and safeguarding surrounding areas from potential flooding.

Work Details
The contractor will perform design-bid-build construction services that include:
- Implementation of erosion protection measures both above and below the average low flow water surface elevation (approximately 7 feet NAVD88).
- Installation of a 3.5-foot-thick lens of launchable Graded Stone C below the water surface to prevent bank scour and erosion.
- Extension of Graded Stone C above the water surface to the top of the bank in areas under the Pioneer Bridge.
- Placement of a 3.5-foot-thick lens of soil-rock mix above water to protect against wave wash caused by boat wakes and wind waves.
- Demolition and removal of existing upper bank material beneath the I-80 Pioneer Bridge to establish a suitable foundation for new materials.
- Installation of In-stream Woody Material (IWM) below the water line to create habitat cover for fisheries and provide flow deflection along the bank.

All work is required to be completed using barge operations.

Period of Performance
The contractor shall begin performance within a specified number of calendar days after receiving award and notice to proceed, with completion also required within a specified number of calendar days.

Place of Performance
Sacramento, California

Overview

Response Deadline
April 24, 2025, 1:00 p.m. EDT Past Due
Posted
March 20, 2025, 8:45 p.m. EDT (updated: April 25, 2025, 6:27 p.m. EDT)
Set Aside
Small Business (SBA)
Place of Performance
Sacramento, CA
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Signs of Shaping
78% of obligations for similar contracts within the Department of the Army were awarded full & open.
On 3/20/25 USACE Sacramento District issued Solicitation W9123825BA002 for Sacramento River Erosion (SRE) C5 Pioneer Bridge Levee Improvements due 4/24/25. The opportunity was issued with a Small Business (SBA) set aside with NAICS 237990 (SBA Size Standard $45 Million) and PSC Y1LZ.
Primary Contact
Name
Melissa DENIGRIS   Profile
Phone
(916) 557-5137

Secondary Contact

Name
Melita Doyle   Profile
Phone
(916) 557-1077

Documents

Posted documents for Solicitation W9123825BA002

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Solicitation W9123825BA002

Contract Awards

Prime contracts awarded through Solicitation W9123825BA002

Incumbent or Similar Awards

Contracts Similar to Solicitation W9123825BA002

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W9123825BA002

Similar Active Opportunities

Open contract opportunities similar to Solicitation W9123825BA002

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SPD > US ARMY ENGINEER DISTRICT SACRAMENT
FPDS Organization Code
2100-W91238
Source Organization Code
100221301
Last Updated
April 25, 2025
Last Updated By
melita.s.doyle@usace.army.mil
Archive Date
April 18, 2026