Rough River Dam Safety Modification Phase II: New Outlet Works and Cutoff Wall Project   3

ID: W912QR25R0016 • Type: Sources Sought • Match:  100%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading

Description

The U.S. Army Corps of Engineers - Louisville District Soliciting Comments on the Potential Use of Project Labor Agreements (PLA) at Rough River Lake

Solicitation Number: W912QR24R0016

In accordance with Defense Pricing, Contracting, and Acquisition Policy (DPCAP) memo dated 2 June 2025, Class Deviation 2025-O0002 and its Revision 1, Waiver of Project Labor Agreement Requirements has been rescinded. Contracting Officers are immediately directed to revert to following FAR Subpart 22.5, Use of Project Labor Agreements for Federal Construction Projects, for large-scale construction projects, unless an exception applies.

Description: The Corps of Engineers Louisville District is soliciting comments from the construction community addressing the potential use of Project Labor Agreements (PLA) for a large-scale construction project (exceeding $25 million) for the following:

The Rough River Dam Safety Modification Phase II Project includes the construction of a new left abutment outlet works in order to facilitate cutoff wall construction. Completion of the new outlet works must require a new approach channel, control tower, service bridge, outlet conduit tunnel, stilling basin, and retreat channel along with commissioning of the new control tower. Completion of the cutoff wall requires abandonment of the existing right abutment outlet works, construction of a work platform, slurry control grouting, construction of a cutoff wall into the dam foundation and through the existing outlet conduit, abandonment of the existing control tower, backfilling the existing retreat channel, instrumentation installation/relocations, and relocation of Highway 79 back to the dam crest.

a. Approach Channel: The approach channel is 945 feet long and 50 feet wide with 6V:1H side slopes. The excavation consists of a combination of underwater dredging, underwater intact rock excavation, and surface excavation in predominately hard bedrock.

b. Control Tower: The control tower will be 177 feet tall and be composed of reinforced concrete having a footprint of 56 feet by 60 feet. The control tower will have two 6.25-feet x 14-feet service and emergency gates for primary flow conveyance. The tower will have a 150-feet long service bridge extending to the left abutment. A 600 feet long cohesive earth cofferdam founded on dentally treated bedrock will be required to protect the excavation up to the top of active storage for the reservoir. A double line grout curtain will be completed below the cofferdam and extend to surround the perimeter of the control tower pit excavation to minimize groundwater and seepage entering the excavation work area.

c. Tunnel: The approximate 970 feet long tunnel will have a 14 feet inside diameter tunnel with a 12-inch abrasion resistant reinforced concrete liner. The tunnel heading shall be from the downstream portal. The upstream portal shall be constructed integral to the control tower. The portals and portions of the tunnel extending below the dam footprint shall be mechanically excavated.

d. Stilling Basin: The stilling basin will be 115 feet long, 40 feet wide, and approximately 55 feet below the ground surface. The stilling basin excavation shall be staged to facilitate tunnel completion. The excavation will have a 15-foot horizontal bench, and rock fence located above the training walls. The bedrock excavation will continue downstream of the stilling basin and will be protected via a 2-foot thick concrete apron before transitioning to KYTC Class III Channel Lining at the intersection with the historic river channel.

e. Abandonment of the Existing Control Tower: Once the new outlet works is operational and fully commissioned, the existing control tower and conduit will be abandoned by permanently sealing the existing service gates and filling the lower control tower and outlet conduit with balanced, stable, high mobility cement/bentonite grout or non-shrink concrete.

f. Cutoff Wall: A new and complete 1,640 feet + long, 2 feet minimum thick, concrete cutoff wall through the embankment and into the foundation rock. Depth of the wall varies across the dam but can be as great as 200' from the crest of the dam. Additional slurry control grouting will be required near the existing conduit. The cutoff wall will sever the existing conduit and extend through to the bedrock below. The work at the conduit area shall not proceed until the new outlet works is fully functioning and the existing outlet works has been suitably abandoned.

g. Relocations: Highway 79 will be located back to the crest of the dam and dam restoration.

A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f). Federal Acquisition Regulation (FAR) Policy:

(a) Project Labor Agreement (PLA) is a tool that agencies may use to promote economy and efficiency in Federal procurement. Pursuant to Executive Order 13502, agencies are encouraged to consider requiring the use of project labor agreements in connection with large-scale construction projects.

(b) An agency may, if appropriate, require that every contractor and subcontractor engaged in construction on the project agree, for that project, to negotiate or become a party to a project labor agreement with one or more labor organizations if the agency decides that the use of project labor agreements will:

(1) Advance the Federal Governments interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other matters; and

(2) Be consistent with law.

Reference: Provision: 52.222-33 Notice of Requirement for Project Labor Agreement Clause 52.222-34 Project Labor Agreement.

In consideration of the above factors, and any others which may be deemed appropriate, the construction community is invited to comment on the use of PLAs. Of particular interest to the Government are responses to the following questions:

a. Do you have knowledge that a PLA has been used in the local area on projects of this kind? If so, please provide supporting documentation.

b. Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project? If so, please elaborate and provide supporting documentation where possible.

c. Are you aware of time sensitive issues/scheduling requirements that would affect the rate at which the referenced project should be completed? If so, please elaborate and provide supporting documentation where possible.

d. Identify specific reasons why or how you believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement.

e. Identify specific reasons why you do not believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement.

f. Identify any additional information you believe should be considered on the use of a PLA on the referenced project.

g. Identify any additional information you believe should be considered on the non-use of a PLA on the referenced project.

Please provide your comments via e-mail to adyson.medley@usace.army.mil no later than 10:00 AM Eastern Standard Time on 19 June 2025.

Overview

Response Deadline
June 19, 2025, 10:00 a.m. EDT Past Due
Posted
June 4, 2025, 11:58 a.m. EDT
Set Aside
None
Place of Performance
Falls of Rough, KY United States
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Low
Est. Value Range
$25,000,000 (value based on agency estimated range)
Odds of Award
12%
On 6/4/25 USACE Louisville District issued Sources Sought W912QR25R0016 for Rough River Dam Safety Modification Phase II: New Outlet Works and Cutoff Wall Project due 6/19/25. The opportunity was issued full & open with NAICS 237990 and PSC Y1KA.
Primary Contact
Name
Adyson Medley   Profile
Phone
(502) 315-6211

Secondary Contact

Name
Richard Vandelinde   Profile
Phone
(502) 315-6723

Documents

Posted documents for Sources Sought W912QR25R0016

Opportunity Assistant


AI Analysis

AI Generate

Opportunity Lifecycle

Procurement notices related to Sources Sought W912QR25R0016

Award Notifications

Agency published notification of awards for Sources Sought W912QR25R0016

Incumbent or Similar Awards

Contracts Similar to Sources Sought W912QR25R0016

Potential Bidders and Partners

Awardees that have won contracts similar to Sources Sought W912QR25R0016

Similar Active Opportunities

Open contract opportunities similar to Sources Sought W912QR25R0016

Experts for Rough River Dam Safety Modification Phase II: New Outlet Works and Cutoff Wall Project

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > LRD > US ARMY ENGINEER DISTRICT LOUISVILL
FPDS Organization Code
2100-W912QR
Source Organization Code
100221425
Last Updated
July 4, 2025
Last Updated By
adyson.medley@usace.army.mil
Archive Date
July 4, 2025