Robert S Kerr Powerhouse Turbine/Generator Rehabilitation   4

ID: W912BV19R0042 • Type: Presolicitation
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Does this contract have any security clearance requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

This is a PRE-SOLICITATION NOTICE for the construction project consisting of the rehabilitation of the R.S. Kerr Turbine Generating Units 1 through 4 at the R.S. Kerr Powerhouse in Oklahoma. TH IS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS. No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation notice or any follow up postings.

The U.S. Army Corps of Engineers Tulsa District has been tasked to solicit for and award a contract to rehabilitate the Turbine Generating Units 1 through 4 at the R.S. Kerr Powerhouse in Oklahoma. The proposed project will be a competitive, firm-fixed priced contract procured in accordance with FAR 15, Negotiated Procurement using the trade-off process.

Project Description:

This will be a total turn-key contract with all work being performed by the contractor unless explicitly stated otherwise in the specifications. The requirements of this project are to provide all equipment, labor, materials, and work required to refurbish Robert S. Kerr turbine generating Units 1 through 4 at the Robert S Kerr Powerhouse located in Sallisaw, Sequoyah County, Oklahoma. The existing turbines are five-bladed Kaplan-type units manufactured by Allis Chalmers. They were designed for a maximum output of 46,000 hp but have been operated at 35,000 hp to accommodate the existing generator nameplate of 28,947 KVA at a power factor of 0.95. The units have been generator limited over their life. The rehabilitation of each turbine generator unit shall include the rehabilitation of the existing runner and the rewind of its corresponding generator. This work will require the disassembly of the runner hub and replacement and refurbishment of internal components, rewind of the generator, and replacement or rehabilitation of other components as required in the specifications. The contractor shall also be required to rehabilitate Units 1 through 4 by replacement of the generator stator winding. The new stator winding shall be rated at 42,000 KVA at a power factor of 0.9 with a temperature rise limited to 75 degrees C above a 40 degree C ambient temperature. Replacements of Units 1 through 4 generator stator cores will be included as an option to be exercised on an as needed basis. The field winding will be inspected, tested, and cleaned. Specifically, the proposed plan of work involves the contractor furnishing all supervision, engineering, labor, materials, and equipment to perform the following work in strict accordance with the detailed requirements of the contract.

In accordance with FAR 36.204 and DFARS 236.204, Disclosure of the Magnitude of Construction Projects, the estimated magnitude of construction for this project is between $100,000,000 and $250,000,000.

The North American Industry Classification System code for this procurement is 237990, which has a small business size standard of $39.5M. It will be solicited as an unrestricted procurement.

The estimated duration of the construction phase of this project is 2,710 calendar days.

The anticipated solicitation issuance date is on or about 22 June 2020, and the estimated proposal due date will be on or about 3 September 2020.

Overview

Response Deadline
June 20, 2020, 3:00 p.m. EDT Past Due
Posted
June 5, 2020, 12:51 p.m. EDT
Set Aside
None
Place of Performance
Keota, OK 74941-6569 United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Fixed Price
Est. Level of Competition
Average
Odds of Award
88%
On 6/5/20 USACE Tulsa District issued Presolicitation W912BV19R0042 for Robert S Kerr Powerhouse Turbine/Generator Rehabilitation due 6/20/20. The opportunity was issued full & open with NAICS 237990 and PSC Z2MD.
Primary Contact
Title
Contract Specialist
Name
Julie S. Hill   Profile
Phone
(918) 669-7699
Fax
None

Secondary Contact

Title
Contracting Officer
Name
Brian Hutchison   Profile
Phone
(918) 669-7426
Fax
9186697436

Documents

Posted documents for Presolicitation W912BV19R0042

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Presolicitation W912BV19R0042

Award Notifications

Agency published notification of awards for Presolicitation W912BV19R0042

Contract Awards

Prime contracts awarded through Presolicitation W912BV19R0042

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Presolicitation W912BV19R0042

Similar Active Opportunities

Open contract opportunities similar to Presolicitation W912BV19R0042

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SWD > US ARMY ENGINEER DISTRICT TULSA
FPDS Organization Code
2100-W912BV
Source Organization Code
100221322
Last Updated
July 5, 2020
Last Updated By
PI33_DR_IAE_51681
Archive Date
July 5, 2020