Search Contract Opportunities

RNEC FI-MUE Battery Replacements   4

ID: W911RZ-25-Q-A001 • Type: Synopsis Solicitation • Match:  100%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading

Description

Posted: May 29, 2025, 2:55 p.m. EDT

This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes only solicitation.

The quotes shall reference the solicitation number W911RZ-25-Q-A007. This solicitation document and incorporated provisions and clauses that are in effect through Federal Acquisition Regulation FAC # 2025-03, dated 01/17/2025 and Defense Federal Acquisition Regulation Supplement (DFARS) Change # DFARS Change 01/17/2025.

The Mission Installation Contracting Command (MICC) - Fort Carson intends to award a Firm-Fixed-Price Contract to a total small business set-aside for the acquisition of the RNEC FI-MUE BATTERY REPLACEMENT at Fort Carson, Colorado. See Performance Work Statement (PWS) for details. The North American Industrial Classification System (NAICS) code for this procurement is NAICS Code: 335910, Battery Manufacturing, size standard 1250 Employees. This will be a totally small business set aside. The Product Service Code is J059 Maintenance, Repair, and Rebuilding of Equipment-Electrical and Electronic Equipment Components.

Description of Requirements

The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and other items and non-personal services necessary to Furnish and Labor to install new Absolyte Value Regulated lead-acid (VRLA) battery cells, modular steel tray housings, Positive +/Negative terminate plate, and Frame Retardant Transparent Module Cover (plexiglass) with standoff for four (4) each Communications Nodes locations. The new battery cells shall be the same brands and equal in amp-hours and not refurbished or renewed. Two (2) locations shall have the same brands and equal in amp hours. Two (2) locations shall have different battery cells that requires higher amphours to 1.75 Volts Per Cells at 8-hours rate. Per the on-site survey its will be determine which locations. The contractor shall reconnect existing Alarm/control cable hardness on each battery cells and reinstall Ni-Cad Neutra Mat as defined in this PWS. The contractor shall perform to the standards in this contract.

Enterprise Center (NEC), Fort Carson, Colorado has a requirement for a onetime purchase and installation of replacement batteries in the CN5 Building 7500, CN4 Building 6256, CN8 Building 2435, and CN10 Booth Mountain.The contractor shall provide new batteries, removal/disposal service, and installation/testing of new batteries. This battery purchase includes a full five-year warranty. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. Equipment removal and installation shall be completed within 7 days of receipt of materials. Parts number and description listed in Table 1.

------------------------------------------------------Table 1----------------------------------------------------

Description Quantity

GNB Absolyte VRLA model 100G27 brand name or equal to (CN 8 & 10 -96 Battery Cells) ---------96

GNB Absolyte VRLA model 100G33 brand name or equal to (CN4 - 24 Battery Cells)-----------24

GNB Absolyte VRLA model 100G19 brand name or equal to (CN5 - 24 Battery Cells)----------24

Misc Equipment for unload/load battery cells------------------------------------------------------------------1

Plexiglass covers and standoff (4-sets)--------------------------------------------------------------------------4

Alarm Control Unit Card Hardness/ Frame and Case ------------------------------------------------------24

Period of Performance for Installation from 23 June 2025 to 30 Dec 2025.

Your points of contact regarding this requirement are as follows: Contract Specialist, George Hargis at george.e.hargis.civ@army.mil Contracting Officer, Farah Surin at farah.surin.civ@army.mil.

This solicitation will close at 9:00 AM MDT on 2 June 2025.

Site visit recommended due to site conditions before submitting quotes.

The site visit is scheduled for 10:00 AM MDT on 19 May 2025 and 2nd site visit 08:30AM MDT 23 May 2025.

Please email George.e.Hargis.civ@army.mil if you plan on attending the site visit.

All questions must be submitted no later than 9:00 AM MDT on 27 May 2025.

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform replacement of batteries as defined in this PWS. The contractor shall meet the standards in this contract. Please see attachments for further details.

Amendment 0001: The purpose of the amendment is to update the meeting location for the site visit scheduled for 19 May @ 1000. We will meet at the visitor center located at 6012 Nelson Blvd, Colorado Springs at 930. All contractors are required to get a visitors pass in order to come on post. Any question please email farah.surin.civ@army.mil or george.e.hargis.civ@army.mil before 0830 the day of.

Amendment 0002: The purpose of the amendment is to inform the public of (1) a 2nd site visit on 23 May 2025 @ 08:30AM MDT and extending the solicitation closing date to 2 June 2025 @ 09:00 AM MDT. All contractors will meet at the Main Gate visitor center located at 6012 Nelson Blvd, Colorado Springs NLT 08:30AM MDT then convoy to Range Control Facility 2740 Wilderness Road building 9550 get at down range pass. All contractors are required to get a visitors pass in order to come on post. And (2) to upload the new PWS. Questions must be submitted by 27 May 2025 @ 09:00AM MDT. Any question please email farah.surin.civ@army.mil or george.e.hargis.civ@army.mil before 16:30PM MDT the day BEFORE (22 May 2025).

Posted: May 27, 2025, 10:51 a.m. EDT
Posted: May 22, 2025, 4:44 p.m. EDT
Posted: May 16, 2025, 4:57 p.m. EDT
Posted: May 12, 2025, 11:10 a.m. EDT
Posted: May 9, 2025, 5:56 p.m. EDT
Background
The Mission Installation Contracting Command (MICC) - Fort Carson is issuing this solicitation for a Firm-Fixed-Price Contract aimed at acquiring the RNEC FI-MUE Battery Replacement at Fort Carson, Colorado.

The objective is to upgrade the existing 48V Direct Current emergency power backup battery cell systems for four Communications Nodes, as the current battery cells are over 12 years old and require replacement due to environmental changes that lead to failures. This upgrade is critical to prevent potential outages of telephone and network services throughout Fort Carson.

Work Details
The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and other items necessary to install new Absolyte Value Regulated lead-acid (VRLA) battery cells and associated components at four Communications Node locations.

Specific tasks include:
- Installing new battery cells that are the same brand and equal in amp-hours;
- Ensuring two locations have different battery cells with higher amp-hours;
- Reconnecting existing alarm/control cable harnesses on each battery cell;
- Reinstalling Ni-Cad Neutra Mat;
- Providing removal/disposal service for old batteries;
- Conducting installation/testing of new batteries.

The contractor must adhere to the standards outlined in the Performance Work Statement (PWS). A full five-year warranty is included with the battery purchase.

Period of Performance
Installation is scheduled from May 1, 2025, to December 1, 2025.

Place of Performance
Fort Carson, Colorado.

Overview

Response Deadline
June 2, 2025, 11:00 a.m. EDT (original: May 28, 2025, 11:00 a.m. EDT) Past Due
Posted
May 9, 2025, 5:56 p.m. EDT (updated: May 29, 2025, 2:55 p.m. EDT)
Set Aside
Small Business (SBA)
Place of Performance
Colorado Springs, CO 80913 United States
Source

Current SBA Size Standard
1250 Employees
Pricing
Fixed Price
Est. Level of Competition
High
Signs of Shaping
60% of obligations for similar contracts within the Department of the Army were awarded full & open.
On 5/9/25 MICC Fort Carson issued Synopsis Solicitation W911RZ-25-Q-A001 for RNEC FI-MUE Battery Replacements due 6/2/25. The opportunity was issued with a Small Business (SBA) set aside with NAICS 335910 (SBA Size Standard 1250 Employees) and PSC J059.
Primary Contact
Name
Geroge Hargis   Profile
Phone
(719) 526-1563

Secondary Contact

Name
Farah Surin   Profile
Phone
None

Additional Contacts in Documents

Title Name Email Phone
Contract Specialist George Hargis Profile george.e.hargis.civ@army.mil None

Documents

Posted documents for Synopsis Solicitation W911RZ-25-Q-A001

Opportunity Assistant


AI Analysis

AI Generate

Opportunity Lifecycle

Procurement notices related to Synopsis Solicitation W911RZ-25-Q-A001

Award Notifications

Agency published notification of awards for Synopsis Solicitation W911RZ-25-Q-A001

Contract Awards

Prime contracts awarded through Synopsis Solicitation W911RZ-25-Q-A001

Incumbent or Similar Awards

Contracts Similar to Synopsis Solicitation W911RZ-25-Q-A001

Potential Bidders and Partners

Awardees that have won contracts similar to Synopsis Solicitation W911RZ-25-Q-A001

Similar Active Opportunities

Open contract opportunities similar to Synopsis Solicitation W911RZ-25-Q-A001

Experts for RNEC FI-MUE Battery Replacements

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > AMC > ACC > MISSION & INSTALLATION CONTRACTING COMMAND > 418TH CSB
FPDS Organization Code
2100-W911RZ
Source Organization Code
500036835
Last Updated
June 17, 2025
Last Updated By
george.e.hargis.civ@army.mil
Archive Date
June 17, 2025